소프트웨어사업자 실적데이터 활용방안에 관한 연구 (A Study on Effective Utilization of Historical Data of Software Companies)

  • 김중한
    • 한국IT서비스학회지
    • /
    • 제7권1호
    • /
    • pp.103-116
    • /
    • 2008
  • Efficiency and objectiveness are the most critical issues in the evaluation of software projects. It is beneficial not only to software companies participated in bids, but to administrators of projects. This study attempts to find an improvement in the evaluation process by connecting the historical data of bidding companies in the software company report system with the governmental procurement system. The proposed means will eliminate unnecessary and repetitive submission step of bidding companies and provide the administrator with objective evaluation process. Also, this paper proposes an automated process for quantifying the business experience of bidding companies.

동시공학 및 LOB를 사용한 반복 프로젝트 공기단축 방법론 (Crashing Method for Repetitive Project hybridizing concurrent engineering and LOB)

  • 민규태;이홍철;리현군;이동은
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2018년도 춘계 학술논문 발표대회
    • /
    • pp.41-42
    • /
    • 2018
  • Various methods that crash the project completion time have been studied. Line-of-Balance (LOB) is well accepted as a useful method that enables steady resource utilization without frequent hire-and-fire of resources for a project having repetitive units. Existing studies involved in LOB-CPM focuses on thesis such as resource leveling and optimization in construction scheduling community. However, crashing methods are not arrived at a full maturity in LOB scheduling, because no one handles steady resource utilization while keeping activity-relationships. This paper proposes a method that crashes project completion time by hybridizing concurrent engineering and LOB scheduling without using additional resources.

  • PDF

토목공사 기획 및 설계단계의 BIM 적용방안 연구 (BIM Application for Civil Engineering Project in Planning and Design Phases)

  • 강인석;김슬기;김현승;문현석
    • 한국BIM학회 논문집
    • /
    • 제1권1호
    • /
    • pp.26-31
    • /
    • 2011
  • 국내에서 BIM의 실무 활용은 건축공사 중심으로 적용되고 있다. 건축공사의 부위별 객체 특성이 정형적, 수직적, 반복적인 형태를 갖는 반면에 토목공사의 객체 특성은 비정형적, 수평적, 비반복적인 형태를 갖으므로 3D객체 구성이 어렵기 때문이다. 본 연구에서는 토목공사의 기획단계부터 설계단계까지의 업무 및 정보관리의 문제점을 파악한 후 BIM기반에서의 적용 프로세스를 제안하며, 제시한 프로세스를 기반으로 BIM시스템을 구축하여 교량공사를 대상으로 실무 적용성을 검토한다.

Resource-constrained Scheduling at Different Project Sizes

  • Lazari, Vasiliki;Chassiakos, Athanasios;Karatzas, Stylianos
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.196-203
    • /
    • 2022
  • The resource constrained scheduling problem (RCSP) constitutes one of the most challenging problems in Project Management, as it combines multiple parameters, contradicting objectives (project completion within certain deadlines, resource allocation within resource availability margins and with reduced fluctuations), strict constraints (precedence constraints between activities), while its complexity grows with the increase in the number of activities being executed. Due to the large solution space size, this work investigates the application of Genetic Algorithms to approximate the optimal resource alolocation and obtain optimal trade-offs between different project goals. This analysis uses the cost of exceeding the daily resource availability, the cost from the day-by-day resource movement in and out of the site and the cost for using resources day-by-day, to form the objective cost function. The model is applied in different case studies: 1 project consisting of 10 activities, 4 repetitive projects consisting of 40 activities in total and 16 repetitive projects consisting of 160 activities in total, in order to evaluate the effectiveness of the algorithm in different-size solution spaces and under alternative optimization criteria by examining the quality of the solution and the required computational time. The case studies 2 & 3 have been developed by building upon the recurrence of the unit/sub-project (10 activities), meaning that the initial problem is multiplied four and sixteen times respectively. The evaluation results indicate that the proposed model can efficiently provide reliable solutions with respect to the individual goals assigned in every case study regardless of the project scale.

  • PDF

고층 공동주택 마감공사의 공정계획 프로세스 (Process Planning for Finishing Works of High-rise Residential Buildings Project)

  • 백태용
    • 한국산학기술학회논문지
    • /
    • 제18권11호
    • /
    • pp.110-117
    • /
    • 2017
  • 다수의 고층 주거 건물을 건설하는 공동주택 프로젝트에서 마감 공종은 단위세대마다 반복적으로 시공되므로 자원이 연속적으로 투입되도록 공정관리가 이루어지면 품질을 확보하면서 공기를 단축하고 공사비를 절감할 수 있다. Bar Chart, CPM, LOB와 같은 공정관리 기법은 반복 작업에 대한 표현과 적용의 한계점으로 인하여 공동주택 마감공사에 사용하기에는 적합하지 않다. 또한 택트 기반 공정관리 기법은 반복 공종의 작업 흐름을 일정하게 유지하기 어려울 뿐만 아니라 지속적으로 필요한 자원을 할당하기 위해서는 상당한 노력과 전문 시공업체의 협조를 필요로 한다. 공동주택의 마감공사는 벽체조성공사, 마감바탕공사, 바닥미장공사, 최종마감공사 순으로 진행되고, 각 공사에는 작업 방법, 작업 공간, 자원 생산성 등과 관련하여 다양한 특성을 가지는 하위 개념의 반복 공종들이 존재한다. 이 반복 공종들의 작업이 동기화되거나 마지막 작업구역에서 수렴되도록 하면 공정관리의 목표가 유효하게 달성될 수 있다. 따라서 본 연구는 공동주택의 단위세대에서 시공되는 작업들의 순서 관계, 작업 유형 분류 및 관리 방법, 자원의 연속적인 투입을 위한 시공속도와 작업구역 등의 요소들을 고려하여 마감공사를 위한 공정 계획 프로세스를 제시하고자 한다.

작업일보 데이터를 활용한 조적공사 작업간섭 요소 도출 (Masonry work interference factor deduction based on daily report data analysis)

  • 박민하;이혜린;고용호;한승우
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2015년도 추계 학술논문 발표대회
    • /
    • pp.172-173
    • /
    • 2015
  • Construction project involves numerous repetitive operations. Especially in high-rise and apartment houses projects, the amount of repetitive operations increase and a preceding operations delay causes serious damage to the total duration of the project. This study deducts work delay factors by site engineer interview and survey. The study analyzes daily report data to deduct crucial processes affecting masonry work which has been investigated to be one of preliminary processes conducted at the beginning of finish work.

  • PDF

공구분할기반 공동주택 거푸집공사 작업조 구성 프로세스 (Process of Formwork Crew Team Formation Based on Work Zoning in Apartment Housing Projects)

  • 구교진;조동현;이준호;박상헌;박찬수
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2012년도 추계 학술논문 발표대회
    • /
    • pp.285-286
    • /
    • 2012
  • In the large scale projects, it is difficult to manage every blocks because of the apartment housing project have repetitive shapes and structures. Therefore, it is necessary to divide construction site into work zones and blocks considering site plan, the number of units per each floor, arrangement of blocks, etc. In this study, 20 influencing factors on the grouping of work zones and formwork crew team formation are identified through case study and literature review. Factors are analyzed to determine the degree of influence through experts interviews. A systematic process of crew formation based on work zoning and the considerations by each steps are presented.

  • PDF

Suggestions for Detection System of Bid-rigging in Public Construction Projects

  • Song, Sanghoon;Bang, Jong-Dae;Sohn, Jeong-Rak;Cho, Gun-Hee
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.712-713
    • /
    • 2015
  • In recent years, the bid-rigging in public construction markets has been treated as a critical issue in Fair Trade Commission. The investigation revealed that the collusion was implemented extensively in every area from the material supply to the construction service of general contractors. This study reviewed the causes of the bid-rigging in public construction projects, and proposed the improvement plan to eradicate bad practices. Firstly, the causes and purposes of bid-rigging were categorized into two types of internal factors from construction companies and external environment factors influencing business activities. Secondly, the system development method was explained to detect the signs of bid-rigging based on the technical proposal documents in open tender. The detection systems of repetitive public owner also provide the function of sharing data on the companies and cases to violate the fair trade regulation. In addition, the problems and improvement direction of public procurement policies were discussed.

  • PDF

A Stochastic Linear Scheduling Method using Monte Carlo Simulation

  • Soderlund, Chase;Park, Borinara
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.169-173
    • /
    • 2015
  • The linear scheduling method or line-of-balance (LOB) is a popular choice for projects that involve repetitive tasks during project execution. The method, however, produces deterministic schedule that does not convey a range of potential project outcomes under uncertainty. This results from the fact the basic scheduling parameters such as crew production rates are estimated to be deterministic based on single-point value inputs. The current linear scheduling technique, therefore, lacks the capability of reflecting the fluctuating nature of the project operation. In this paper the authors address the issue of how the variability of operation and production rates affects schedule outcomes and show a more realistic description of what might be a realistic picture of typical projects. The authors provide a solution by providing a more effective and comprehensive way of incorporating the crew performance variability using a Monte Carlo simulation technique. The simulation outcomes are discussed in terms of how this stochastic approach can overcome the shortcomings of the conventional linear scheduling technique and provide optimum schedule solutions.

  • PDF

작업공간과 자원의 여유시간 최소화를 통한 반복작업 공정계획기법 (Network Compression by Saying Idle Time of Resources and Spaces for Repetitive Activities)

  • 이규진
    • 한국건설관리학회논문집
    • /
    • 제1권3호
    • /
    • pp.75-80
    • /
    • 2000
  • 공간의 분할이 많은 건축공사에서는 반복적 특성으로 인해 공정계획상에 다수의 대안이 존재한다. 공사기간은 각 액티비티의 기간뿐 아니라 반복되는 액티비티의 배열방법에 의해서도 많은 영향을 받는다. 본 연구는 각 액티비티에 적정한 선행 액티비티를 할당함으로써 여유시간을 최소화하는 공정계획기법을 제시하는 것을 목적으로 진행되었다. Line of Balance 기법을 기본으로 하는 기존연구와는 달리 본 연구에서는 AON방식의 네트워크 기법을 기본으로 하여 공간과 자원의 두 축 사이에 액티비티를 배열하였다. 각 액티비티별로 자원과 공간의 양방향으로 가장 적절한 선행 액티비티를 검색하여 여유시간을 최소화한다. 본 연구에서 제시한 액티비티 배열방법을 공동주택공사 건설공사를 대상으로 적용한 결과, 액티비티 배열을 달리함에 따라서 다수의 대안이 존재함을 확인할 수 있었으며 그중 적정대안을 찾아낼 수 있었다. 본 기법은 공동주택공사와 같은 다수의 유사공간으로 구성된 건설공사의 공정 계획에 도움을 줄 수 있을 것으로 판단된다.

  • PDF