• Title/Summary/Keyword: repair-cost ratio

Search Result 43, Processing Time 0.023 seconds

A Proposal of Repair Cost Estimating Criteria for Persistent Defects in Apartment Houses

  • Lee, Hae-Jin;Lim, Nam-Gi
    • Journal of the Korea Institute of Building Construction
    • /
    • v.11 no.6
    • /
    • pp.597-608
    • /
    • 2011
  • It has been often noted as a problem that as there are no objective and clear criteria for the repair cost estimate of persistent defects, when a claim arises in relation to an apartment construction, significantly different amounts of compensation may be given for similar defects based on the experience and tendencies of the construction experts asked to make a judgment. For this reason, this research aims to present defect managers with a more reasonable and objective estimation criteria and a system to determine the repair cost of defects based on an analysis of relevant factors. The research findings show that the historical cost system is applied first, and then a standard of estimation is used to estimate the cost for the items that are not included in the historical cost system. The criteria for the repair cost for each defect is as follows: the repair cost for defects arising from a regulation violation is determined by calculating the reconstruction cost of the parts in question after demolishing them; the repair cost for progressive defects is determined based on a contribution ratio proportional to the age of the building; the repair cost for repetitive defects is calculated by considering an alternative to maximize the intended function of the defective parts; and the repair cost for value depreciation defects is determined based on the ratio of the warranty period to the lapsed years. However, repair cost estimation for dual value depreciation defects should be studied in future research.

A Study on the Correlation Analysis of Construction Period and Defect Repair Costs of Apartment Housing (공동주택 공사기간 및 하자보수비용의 상관관계 분석 연구)

  • Lee, Young-Jae;Cho, Dong-Hyun;Lee, Mi-Young;Park, Sang-Hun;Koo, Kyo-Jin
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.11a
    • /
    • pp.48-49
    • /
    • 2019
  • The number of disputes over defects after completion of construction work in apartment buildings is increasing every year. In this situation, the prediction of reasonable defect repair costs is very important. In this paper, we are going to collect basic data for predicting defect repair costs through the correlation analysis of the construction period and defect repair cost of apartment houses. For this purpose, first of all, the construction period and defect repair cost of apartment houses were analyzed to analyze the construction period for each type of work, the construction period for each project type, and the construction period for each standard calculation. Next, the correlation between defect repair cost and the independent variables of the candidate was conducted. According to the analysis, the ratio of framing air, the ratio of finishing air, and the number of delay days showed strong correlation.

  • PDF

The Forecasting Model of the Repair Cost in Apartment Housing - Focused roof water proofing and Elevator work - (공동주택 공종별 수선비용 예측모델 연구 - 옥상방수 공사와 승강기 공사를 중심으로 -)

  • Lee, KangHee;Chae, ChangU
    • KIEAE Journal
    • /
    • v.15 no.6
    • /
    • pp.63-68
    • /
    • 2015
  • Purpose: Most if buildings need various repair works for preventing or delaying the deterioration which gives rise to affect the living condition or function after constructed. Therefore, a long-term repair schedule should be planned and a repair cost is required. In this paper, it aimed at providing the statistical forecast model for a repair cost in roof water-proofing work and elevator work using statistical approach with three variables such as number of household, management area and a elapsed year. Data are collected in apartment housings which are located in Seoul area and conducted with interview and questionnaire sheet. Each analyzed work is divided into a partly work and fully work. Results of this study are shown that, first, the regression model takes a multiplying type like a Cobb-Douglas function and is changed into the log-linear type to include the three variable simultaneously. Second, the goodness-of-fit of the repair cost forecasting model has a good statistics in determinant's coefficient and Dubin-Watson value. Third, the management area is stronger factor than other the number of household and an elapsed year in roof water-proofing work and elevator work.

Experimental study on repair of corroded steel beam using CFRP

  • Chen, Meiling;Das, Sreekanta
    • Steel and Composite Structures
    • /
    • v.9 no.2
    • /
    • pp.103-118
    • /
    • 2009
  • It has been reported that more than thirty five percent of steel bridges in the USA are structurally deficient because of structural degradations. The degraded structures need either full replacement or rehabilitation such that they are able to provide the required services for a longer period of time. The cost for repair in most cases is far less than the cost of replacement. Moreover, repair method generally takes less time than replacement and also reduces service interruption time. Modern advanced composites have been used in aerospace and automotive fields since World War II. In the recent past, because of the high strength-to-weight ratio and high stiffness-to-weight ratio, these composite materials have been introduced to civil engineering infrastructures primarily for repair and rehabilitation of concrete structures. However, only a few preliminary studies on repair of corroded steel structures using theses composite materials are reported in the literature available in the public domain. Thus, in this study, a series of laboratory tests was undertaken to evaluate the effectiveness of this repair method using carbon fiber reinforced polymer composite. The paper discusses the test method and test results obtained from these tests.

Case Study of Non-Metallic Repair Systems for Metallic Piping

  • Hammad, Bakr. S.
    • Corrosion Science and Technology
    • /
    • v.7 no.1
    • /
    • pp.6-12
    • /
    • 2008
  • Non-metallic composite overwrap repair methods utilize resin based fiber-reinforced composite materials, which have higher specific strength to weight ratio and stiffness, superior corrosion and fatigue resistance, and substantially reduced weight when compared to carbon steel. Non-metallic repair methods/systems can allow desired functional properties to be achieved at a respectable economic advantage. For example, non-metallic composite repair systems have at least a 50 year design stress of 20 ksi and approximately 25% of the short term tensile strength of fiberglass. For these systems, the contribution of the repaired steel to the load carrying capability need not be considered, as the strength of the repair itself is sufficient to carry the internal pressure. Worldwide experience in the Oil & Gas industry confirms the integrity, durability, inherent permanency, and cost-effectiveness of non-metallic composite repair or rehabilitation systems. A case study of a recent application of a composite repair system in Saudi Aramco resulted in savings of 37% for offshore subsea line and 75% for onshore above grade pipeline job. Maintaining a pipeline can be costly but it is very small in comparison to the cost of a failure. Pipeline proponents must balance maintenance costs with pipeline integrity. The purpose is not just to save money but also to attain a level of safety that is acceptable. This technology involves the use of an epoxy polymer resin based, fiber-reinforced composite sleeve system for rehabilitation and /or repair pipelines.

A study on the cost state of the stow net Fishery (근해안강망어업경영의 원가실태에 관한 연구)

  • 박정호
    • The Journal of Fisheries Business Administration
    • /
    • v.9 no.2
    • /
    • pp.59-89
    • /
    • 1978
  • The analyzed results of the actual state of stow net fishery based on the cost expended are as follows. According to the calculation of interests, the total cost of this fishery comes to ₩38,010,653 and in this account, the production cost comes to ₩35,477,198(93.3%), the material cost, 14,567,239(38.3%), the labour cost, 12,740,274(33.5%), the expenses, ₩8,169,685(21.5%), the commision and administration expenses, 2,533,455(6.7%). The expenses for this fishery are paid out as production costs, and the expenses for sale and administration expenses are the lowest of them, and the 93% of expenses are paid out as production costs. The ratio of cost element to 100% is as follow. The wages, 28.4%, fuel, 15.2%, repair, 11.6%, deprecation, 9.5%, fishing gear, 8.7%, ice, 6.1%, container(box for fish), 5.2% administration expenses, 5.2%, food, 3.5%, ship grar, 3.2%, public welfare, 1.7%, commision for sale, 1.5%, insurance for crew, 0.2%, taxes, 0.2%. This fishery is managed with the larger fishing boat than it was and so, it demands better crews with higher wages. In the former fishery, the search for fishing ground is very difficult with long navigation and great fuel consumption. when the weak fishing gears are used, the expenses for their repair and for their gears are greatly paid out. The unit costs of catches to each box come to ₩2.807(₩187 each kg). As the ratio of cost of sales comes to 86.7%and the ratio of interests comes to ₩5,850,812(13.3%), and so the net profit comes to 13.3% of total profits. According to above the ratio of cost of sales is shown as a universal validity, Asthe total expenses comes to 86.7% to the money on sales in the break-even point, the break-even point comes to ₩26,209,168 Accordingly for the profit control the account of production should be raised, and by the saving method of expenditure the break-even point should be brought down for the development of total profits.

  • PDF

Maintenance Case and Cost Analysis for University Facilities (대학시설물의 유지보수 건수 및 비용 분석)

  • Shin, Myeoung-Ha;Lee, Chan Sik
    • Journal of the Korean Institute of Educational Facilities
    • /
    • v.23 no.6
    • /
    • pp.27-34
    • /
    • 2016
  • Although the scale and number of university facilities have increased, the maintenance of these facilities has not been efficient as maintenance costs incurred during facility operation periods, as well as management time, have not been sufficiently considered. In this study, the maintenance record data of national universities was compared and analyzed to analyze factors that incur maintenance costs according to the uses and costs of the facilities. According to the results, the number of cases of maintenance and repair work for basic educational facilities was shown to be the largest, accounting for 79%. The number of maintenance and repair work occurred according to work type was examined. According to the results, the highest ratio of maintenance and repair work occurred in the field of construction, specifically, the maintenance costs required for facility supplementation accounted for the highest ratio. Maintenance costs per unit area decreased over time in the newer university facilities, while showing a tendency to increase in older university facilities. However, there were cases where maintenance costs did not show any trends due to factors such as the limited maintenance budgets owing to the characteristics of public service facilities and facilities in the stage of deterioration or destruction after the stage of stabilization. This study is considered to be helpful for efficient university facility maintenance plans and budget calculations.

A Study on the Evaluation of Competitiveness and Economic Feasibility of Ship Repair Industry in Korea (우리나라 수리조선의 경쟁력 및 경제성 평가에 관한 연구)

  • Kim, Dug-Sup;Shin, Sang-Hoon;Shin, Yong-John
    • Journal of Korea Port Economic Association
    • /
    • v.38 no.3
    • /
    • pp.69-86
    • /
    • 2022
  • This study analyses the necessity of the large-size shipyard and explores competitiveness factors of it. Furthermore, the competitiveness is evaluated and the economic feasibility of building and operation of shipyard is examined. As a result of AHP analysis of the determining factors of the competitiveness of the repairing shipyard, the importance of the factors was found in the order of arrival and departure safety, repair technology, dock and wharf facilities, repair cost, repair period (on time delivery), and repair parts supply. Moving distance, repair service quality, repair parts supply, arrival and departure safety, repair technology, dock and quay wall facilities, and repair period (on time delivery) were identified as key factors in the AHP analysis for competitiveness of the Busan Port repair shipyard to be built in the future. As a result of the analysing economic feasibility, the net present value of the Busan Port repair shipyard construction and operation investment project was KRW 435.6 billion, and the internal rate of return was 9.8%, higher than the social discount rate (4.5%), and the cost-benefit ratio (B/C) was high at 1.167. As a result of the study, the necessity and economic feasibility of the Busan Port repair shipyard are sufficiently ensured, and the competitiveness assessment was highly positive.

Auto Defect Repair Algorithm for LCD Panel Review & Repair Machine (LCD 패널 Review & Repair 장비의 결함수정 자동화 알고리즘)

  • Lee, W.C.;Lim, S.M.;Lee, S.K.;Jeong, S.H.;Hong, S.K.
    • Laser Solutions
    • /
    • v.15 no.1
    • /
    • pp.6-9
    • /
    • 2012
  • In TFT-LCD manufacturing process, various defects are generated by manufacturing machine trouble or particle. These defects can be repaired through the TFT-Laser repair process that only can't be automated in TFT-LCD manufacturing Process. In this Paper, we propose auto defect algorithm for TFT-LCD laser repair machine using image processing algorithm in order to automate process. Proposed algorithm can detect very small defects (< 2um) in 98% success ratio, and generated laser repair path guarantee highly precise position accuracy. Through proposed system, much of the work still done the old-fashioned way, by hand, can be automated and manufacturing company can be strengthed the competitiveness of cost.

  • PDF

Life-cycle-cost optimization for the wind load design of tall buildings equipped with TMDs

  • Venanzi, Ilaria;Ierimonti, Laura;Caracoglia, Luca
    • Wind and Structures
    • /
    • v.30 no.4
    • /
    • pp.379-392
    • /
    • 2020
  • The paper presents a Life-Cycle Cost-based optimization framework for wind-excited tall buildings equipped with Tuned Mass Dampers (TMDs). The objective is to minimize the Life-Cycle Cost that comprises initial costs of the structure, the control system and costs related to repair, maintenance and downtime over the building's lifetime. The integrated optimization of structural sections and mass ratio of the TMDs is carried out, leading to a set of Pareto optimal solutions. The main advantage of the proposed methodology is that, differently from the traditional optimal design approach, it allows to perform the unified design of both the structure and the control system in a Life Cycle Cost Analysis framework. The procedure quantifies wind-induced losses, related to structural and nonstructural damage, considering the stochastic nature of the loads (wind velocity and direction), the specificity of the structural modeling (e.g., non-shear-type vibration modes and torsional effects) and the presence of the TMDs. Both serviceability and ultimate limit states related to the structure and the TMDs' damage are adopted for the computation of repair costs. The application to a case study tall building allows to demonstrate the efficiency of the procedure for the integrated design of the structure and the control system.