• Title/Summary/Keyword: repair works

Search Result 195, Processing Time 0.033 seconds

Applying BIM and GIS to Railway Maintenance Works in Taiwan

  • Liu, Li-Shih;Shr, Jin-Fang
    • International Journal of Aerospace System Engineering
    • /
    • v.2 no.1
    • /
    • pp.18-23
    • /
    • 2015
  • Based on real jobs, this study was carried out the Railway maintenance works in Taiwan. It hopes to use Geographic Information System(GIS) and Building Information Modeling(BIM) for changing the maintenance model from "post-damage repair" to "preventive maintenance". Accordingly, this research will build a Railway Repairing Database that installs all repair data. This database will also connect to GIS so that can be the source of analysis and statistic for repair paln. The main results of research are as follows: I. All data stored on cloud space that raises the ability to manage and plan on repair. II. Simplify the file work and increase the quantity of case data to the manager who can get more reliable source. III. The data offer objective judgment to avoid subjective argument. IV. Add the GIS information to improve the maintenance because of good analisis.

Experimental study for Concrete-filled I-beam Grid Slab (I 형강 격자 상판에 대한 실험적 연구)

  • 박창규;석윤호;김철환;김용곤;정영수
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2000.04a
    • /
    • pp.458-463
    • /
    • 2000
  • Recently, there are increasing much concerns about repair and rehabilitation works for aged Concrete Structures which had been constructed on around the 1970's for rapid economic growth in Korea. In particular, it is believed that there are many aged concrete slabs for Highway bridges in these days. Thus new construction method of concrete slabs are strongly needed to minimize the traffic congestion during the repair works. The objective of this research is to develop the new constructional method of concrete slab in bridge structure, which can contribute to minimize the traffic congestion to be occurred during the repair and rehabilitation works of aged concrete slab, and can also assure the reliable quality through the minimization of in-situ works at the site. I-beams with punch holes will be manufactured in accordance with the specification in the factory, and will be preassembled into the panel. After erecting the preassembled panels in the site, concrete will be poured into the slab panel. This research is to investigate physical properties of I-Beam with punch holes itself, and then to investigate structural properties of assembled I-Beam panels through static and fatigue test, of which result can be utilized for the development of the new constructional method for concrete slab in bridge structure.

  • PDF

Repair work of Sasungjeon, one of the main building of Jangansa temple, and an attempt to transform the repair system of historic architecture in 1940s (금강산 장안사 사성전 보존 수리공사와 1940년대 수리체제 전환 시도)

  • Seo, Hyowon
    • Journal of architectural history
    • /
    • v.29 no.4
    • /
    • pp.7-16
    • /
    • 2020
  • The purpose of this study is to reveal the development process of modern repair systems in the Korean peninsula. Sasungjeon, one of the main buildings of Jangansa temple located in Geumgangsan, was repaired from 1941 to 1944. It was the very last restoration work of historic wooden architecture performed during the Japanese colonial era. This work was delayed multiple times because of insufficient materials and human resources. The Bureau of Education(學務局), which was in charge of repair work, understood that the problems of the repair system and suggested reorganizing the system as a solution. This study examined the repair work of Sasungjeon as a background of the bureau's suggestion and considered this suggestion as an attempt to transform the repair system.

A Study on the Service life of the Building Components in the Apartment Housing (공동주택 구성재의 내용년수 산정방법에 관한 연구)

  • Lee Kang-Hee;Chang Jung-Hee;Chae Chang-U
    • Journal of the Korean housing association
    • /
    • v.16 no.5
    • /
    • pp.67-74
    • /
    • 2005
  • The performance of building should be deteriorated with time while the building would maintain and manage the function and performance to get a living condition. For the efficient maintenance of the building, the repair cycle would be provided and applied during the service-life time. The service-life time of the building components would be needed to determine the repair time and the repair scope. The service-life time of the building components would be calculated with the 1st repair time and the recovery rate of the performance, considering the recovery rate after repaired. In this paper, the 1st repair time would be estimated with the normal probability distribution, choice probability and 3rd quadratic function. The recovery rate of the building components assumes various level according to the research target and utility area. The results of this study are as follows ; first, most of the components of the building work would range about 30 years in the service-life time and the components of the mechanical works range from 28 years to 37 years, those of the electrical works would be about 31 years.

Design of a Remotely-Controlled Robot System for Automatic Inspection and Repair of Steam Generator Hole in Nucuear Power Plant (원자로 스팀 제너레이터 홀의 수리 및 자동 검사를 위한 원격제어 로봇시스템 설계)

  • 김종규
    • Journal of the Korean Society of Manufacturing Technology Engineers
    • /
    • v.9 no.2
    • /
    • pp.125-137
    • /
    • 2000
  • In this paper we propose a new approach to the development of the automatic vision system to examine and repair the steam generator tubes at remote distance. In nuclear power plants workers are reluctant of works in steam generator because of the high radiation environment and limited working space. It is strongly recommended that the examination and maintenance works be done by an automatic system for the protection of the operator from the radiation exposure. Digital signal processors are used in implementing real time recognition and examination of steam generator tubes in the proposed vision system. Performance of proposed digital vision system is illustrated by simulation and experiment for similar steam generator moldel.

  • PDF

Vision System Design for Automatic Test and Repair of Steam Generator Holes in Nuclear Power Plants (원자력발전소 증기 발생기의 자동검사 및 수리를 위한 비젼시스템 설계)

  • 한성현
    • Journal of the Korean Society for Precision Engineering
    • /
    • v.15 no.6
    • /
    • pp.5-14
    • /
    • 1998
  • In this paper we propose a new approach to the development of the automatic vision system to examine and repair the steam generator tubes at remote distance. In nuclear power plants, workers are reluctant of works in steam generator because of the high radiation environment and limited working space. It is strongly recommended that the examination and maintenance works be done by an automatic system for the protection of the operator from the radiation exposure. Digital signal processors are used in implementing real time recognition and examination of steam generator tubes in the proposed vision system. Performance of proposed digital vision system is illustrated by simulation and experiment for similar steam generator model.

  • PDF

A study on investigation in damage sector of Wooden Cultural propertices-Housing Sin Keom Dang of MakokSa & Kim, Joo Tae's house (목조문화재 파손요인에 관한 연구-마곡사 심검당, 김주태 가옥)

  • Kim, Sa-Dug;Lee, Young-Hee;Yoon, Hee-Sang
    • 보존과학연구
    • /
    • s.15
    • /
    • pp.104-127
    • /
    • 1994
  • Traditional architecture has structural limits after some terms because it almost made by wood elements. So in the name of 'Restoration', by anatural process, repair works are accomplished. But the repair works of traditional buildings have some problems in spite of best men power and technology. To overcome this problems, we need more detailed studies for examine the reasons of destruction in elements of wooden buildings. The life limits of wooden buildings are caused by natural circumstances and humanic circumstances, the former has bad effect on the damage in wooden buildings. There are various elements of damage in the wooden buildings, earthquake, the falling of a thunderbolt, fire, and rain, microorganism, insect, and so on. Moreover pollutions-sulfurous acid gas, acidorganic matters -are important reason of shortening the life of wooden buildings. From 1981 till now we investigated important traditional buildings under repair works by the way scientific analysis to catch the sample - seramics, woods, insects, metals, etc. In this reports we suggest various method of investigation with two samples of tradional house made by wood, one is Kim Joo Tea House, the order is Simgum-dang of Magok-Sa(dwelling of monk).

  • PDF

Development of Repair and Replacement Cost Management System for Public Buildings to Establish Accurate Facility Management Budgets

  • Choi, Min-Chan;Lee, Chun-Kyong;Jung, Tae-Gab;Park, Tae-Keun
    • Architectural research
    • /
    • v.14 no.2
    • /
    • pp.75-83
    • /
    • 2012
  • Buildings that are more than 10 years old generally have considerable repair and replacement costs due to the rapid deterioration of their systems. For public buildings in particular, which have national and social significance, considerable effort is required not only to ensure a long life cycle and safety but also to minimize the overall public expense. Along with increasing repair and replacement requirements, however, there have been problems related to the establishment of an accurate facility management budget. To address these concerns, a repair and replacement cost management system was constructed. This system manages both invested maintenance and forecast costs to establish a reasonable repair and replacement planning process and budget. The effectiveness of the system was verified through a pilot test targeting one of public Corporation (K).

A Comparative Analysis on the Work Importance of Customized and Expansion Remodeling Project (맞춤형 및 증축형 리모델링 공사의 업무중요도 비교·분석)

  • Kim, Min-Jae;Son, Chang-Baek
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.11a
    • /
    • pp.66-67
    • /
    • 2015
  • This study compared and analyzed the job importance that site managers perceived by dividing the study scope into customized and expansion remodeling projects and deriving the job descriptions from previous studies. As a result, a total of 7 construction stages and 53 job descriptions were derived. As job importance in customized remodeling projects, removal and demolition works were the most important, followed by preliminary survey, and repair and reinforcement works. In addition, as job importance in expansion remodeling projects, preliminary survey is the most important, followed by civil engineering work, and repair and reinforcement works. It is considered that the job importance of the remodeling projects derived in this study will contribute to improving their job efficiency in the future.

  • PDF