• Title/Summary/Keyword: repair works

Search Result 195, Processing Time 0.031 seconds

RCM Activities for Improvement of Availability of AREX Railway System (공항철도의 운영가용도 향상을 위한 RCM 활동)

  • Lee, Chang-Hwan;Lim, Sung-Soo;Song, Mi-Ok
    • Proceedings of the KSR Conference
    • /
    • 2008.06a
    • /
    • pp.742-747
    • /
    • 2008
  • This paper is described the systematic activities of RCM to improve the availability for AREX railway system. The purpose of these activities are to maintain and enhance the reliability, availability, maintainability and safety, and to implement the effective maintenance for electrical and mechanical system including rolling stock, signalling, telecommunication, power supply, overhead catenary and platform screen door with impact to train operation.. The main activities consist of systematic failure and repair recording by integral information system, analysis and corresponding countermeasure. As applying these activities in opeartion and maintenance works, the availability of AREX railway system is going on improvement gradually, and maintenacne works are improved with these results.

  • PDF

A Review on Recent Debate on Proposals of Amendment of the Article of Prohibition of Inhouse-Contract for Harmful Work in the Industrial Safety and Health Act (유해작업 사내도급 금지와 관련된 논란 및 개정방안에 관한 고찰)

  • Park, Doo Yong
    • Journal of Korean Society of Occupational and Environmental Hygiene
    • /
    • v.24 no.1
    • /
    • pp.1-13
    • /
    • 2014
  • Objectives: The purpose of this study is to review the debate on the Article 28(Prohibition of Inhouse-Contract for Harmful Work) of the Industrial Safety and Health Law. Methods: Literatures and recent debate for prohibition and permission of inhouse-contract for harmful work were reviewed. Proposals of revision for the Article 28 of the Industrial Safety and Health Law were also reviewed. Results: It was not found reasonable to revise the Article 28 based on increased fatal accidents or diseases in the electroplating work and heavy metals handling works that are currently listed in the Presidential Decree under the law as the harmful works. Regulation types of prohibition or authorization for any harmful work shall have inherently poor coverage since the scope of application is extremely limited. Contractors for maintenance and repair of chemical facilities may not be included in the scope of application if the harmful works are defined as chemical handling works. If harmful works are prohibited, the contractor workers may loose their jobs. Therefore, it is necessary to consider balancing job security and occupational safety and health safety. Conclusions: Various limitations were found in the Article 28 and the proposals to revise it. Currently in-house subcontracting is widely spread in the workplace. Therefore, it may be inappropriate to set one or two Article such as the Article 28 and 29 to protect in-house subcontract workers from injury and illness. It is believed that it needs fundamental redirection and new approach with new paradigm to impose occupational safety and health duty to prime contractors.

Member design and strength characteristics of the MMA mortar composites (I) (MMA 모르터 복합체의 강도특성 및 부재설계 (I))

  • Ji, Hyo-Seon;Mamdouh, El-Badry
    • Journal of the Korean Society for Advanced Composite Structures
    • /
    • v.6 no.3
    • /
    • pp.41-49
    • /
    • 2015
  • The repair of manhole raise has been caused much construction times and disruption of traffic flow, serious environmental pollution from crushed construction wastes, and budget waste due to the repeated repair construction works. In order to overcome such problems, we have developed the new manhole repairing composite structures by using a glass fiber-reinforced polymer (GFRP) pipe, which can raise manhole to the regular height of the overlayed road pavement with rapid construction and minimum traffic jams. This environmental-friendly technology is method completed by the methyl methacrylate monomer (MMA) double wide flanged GFRP pipe composite structures in order to raise manhole to the regular height. In this paper, two kinds of the compressive strength tests of MMA mortar composites were conducted and evaluated by a general compressive strength test, and compressive strength test after freezing-thawing resistance test. It was found that this MMA mortar composites will be used for the application of the double wide flanged GFRP pipe composite structures.

Analysis of Federal Expenses to Restore, Repair, Reconstruct, or Replace Disaster Damaged Roads and Bridges in the U.S.

  • Bhattacharyya, Arkaprabha;Hastak, Makarand
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.929-936
    • /
    • 2022
  • In the U.S., the state, local, tribe, and territorial governments seek funding from the federal government through the Public Assistance program to carry out these recovery works. In this paper historic public assistance data between 1998 and 2021 have been analyzed to derive several insights such as: types of disasters causing the most damage, states requiring more support, net present value of the federal expense etc. This paper has found that the states requiring more support from the federal government are not always the states suffering the maximum losses from the disasters. It has also found that the net present value of the federal expense between 1998 and 2020 to restore, repair, reconstruct, or replace disaster damaged roads and bridges across the U.S. is $15 billion in 2021 values. Moreover, this paper has tested the correlation between the states' public assistance funds requirements and the existing condition and performance of roads and bridges as revealed by the American Society of Civil Engineer's infrastructure grade card. It has found a weak correlation between these two. The outcomes of this paper can be used by the decision makers to analyze the viability of any possible alternative to the exiting public assistance program. The insights can also help in better decision making in pre-disaster preparation and post-disaster funds allocation.

  • PDF

An Examination of a Risk Assessment Method and Analysis of Defect Types of Apartment Finishing Works (공동주택 마감공사의 하자유형별 분석 및 위험성 평가 방법에 관한 연구)

  • Son, Seunghyun;Lee, Jae-hyeon;Son, Kiyoung
    • Journal of the Korea Institute of Building Construction
    • /
    • v.24 no.2
    • /
    • pp.249-260
    • /
    • 2024
  • In recent years, the proportion of medium and small-sized apartments within the housing market has seen a noticeable increase, alongside a corresponding rise in disputes related to construction defects. Such disputes are most prevalent in the finishing works phase of construction, which not only are frequent in occurrence but also impose significant repair costs. Furthermore, there is a noticeable scarcity of research focused on the quality management of finishing work defects prior to the completion of construction. Addressing this issue necessitates a methodology capable of preemptively identifying defects by analyzing their frequency and associated costs across various defect types. Consequently, the aim of this study is to propose a risk assessment methodology by conducting an analysis of defect cases across 3,299 apartment units, considering aspects such as frequency and severity. The outcomes of this research endeavor are expected to offer practical management strategies to enhance the quality of apartment finishing works and serve as an academic foundation for the enhancement of construction management systems pertaining to apartment finishing works.

Suggestion of an Automatic BIM-based Repair & Replacement (R&R) Cost Estimating Process (BIM기반 건축물 수선교체비 산정 자동화방안 제시)

  • Park, Ji-Eun;Yu, Jung-Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.05a
    • /
    • pp.87-88
    • /
    • 2016
  • In order to assess the design value of engineering work from the point of view of LCC (Life Cycle Cost) in Korea, it is mandatory for all construction works that the total construction costs are over 10 billion won. The LCC includes initial construction costs, maintenance & operation costs, energy costs, end-of-life costs, and so on. Among these, the portion for maintenance & operation costs for a building is sizeable, as compared to the initial construction costs. Furthermore, the paradigm for construction industry has rapidly shifted from 2D to BIM, which includes design planning and data management. However, the study of BIM-based LCC analysis is not adequate today, even though all domestic construction projects ordered by the Public Procurement Service have to adopt BIM. Therefore, this study suggests a methodology of BIM-based LCC analysis that is particularly focused on repair and replacement (R&R) cost. For this purpose, we defined requirements of calculating R&R cost and extracted X from the relevant IFC data. Thereafter, we input them to the ontology of calculating the initial construction costs to obtain an objective output. Finally, in order to automatically calculate R&R cost, mapping with R&R criteria was performed. We expect that our methodology will contribute to more efficiently calculate R&R cost and, furthermore, that this methodology will be applicable to all range of total LCC. Thus, the proposed process of automatic BIM-based LCC analysis will contribute to making LCC analysis more fast and accurate than it is at present.

  • PDF

The Study on the Present Status and Implications of Public Benefits linkage in Assistive Technology Center (장애인보조기구센터의 공적급여 연계 현황과 시사점 연구)

  • Lee, J.H.
    • Journal of rehabilitation welfare engineering & assistive technology
    • /
    • v.8 no.3
    • /
    • pp.221-226
    • /
    • 2014
  • The purpose of this study is to suggest improvement directions and analysis of assistive technology service linkage on public benefits in local assistive technology center. The service steps and the main program parts of public benefits linkage in local assistive technology center was identified, and the present status of associated repair works and contact suppliers of assistive technology device in local community was investigated. The result showed the most common level of associated status to provide information of assistive technology devices in public benefits. All the centers provided repair service, and it was typically performed to light maintenance. The centers offered with associated professional repair service supplier for high maintenance service. The connection with assistive technology device supplier appeared a lot of regional difference. Henceforth, the centers will be required to distribute more various assistive technology devices, it is necessary upgrading the quality of information and interaction with the public benefits supporting organizations through its expansion, and it is need to ensure based on policy through the analysis of the effectiveness about linkage.

  • PDF

Review of the square footstone of the wooden pagoda site in Hwangnyongsa Temple (황룡사 목탑지 방형대석 검토)

  • Kim, Dong-Yeol;Cheon, Deuk-Youm
    • Journal of architectural history
    • /
    • v.24 no.5
    • /
    • pp.33-40
    • /
    • 2015
  • The present study is aimed to reconsider the time of installation and the purpose of the square footstone located at the center of the wooden pagoda in Hwangnyongsa Temple, based on related precedent studies. Precedent studies are divided into two streams of assertions: one is that the square footstone was to support the major pillars at the time of building and the other is that it was installed to store Buddhist reliquaries inside the central foundation stone after the wood pagoda burnt down in the Invasion of Mongol. Summarizing the grounds with which the precedent studies support their assertions, they are the relation with Gaseopbul Yeonjwaseok, the emerging time of the square footstone, repairing work at the level of reconstruction, additional enshrinement of general Buddhist reliquaries and so on. The present study reviewed the key grounds suggested in the previous studies regarding the square footstone. First, it was determined that the square footstone has nothing to do with Gaseopbul Yeonjwaseok, after looking into the timings of appearance, condition and shape in literatures. Rather, it was assumed that Gaseopbul Yeonjwaseok resembles a stone column. Next, the square footstone is assumed to be installed after the 4th year of King Kwangjong's rule because the wood pagoda was lost in fire in the 4th year of Kwangjong's rule and it had been left alone for 68 years until the repair work finished in the 13th year of King Hyunjong. It is assumed that repair works at the level of reconstruction had been twice in total, say, once during King Kyungmun and Hyunjong, respectively. Next, looking into the establishment of the general Buddhist reliquaries and the repair work during King Kyungmun, it was not common then to enshrine additional Buddhist reliquaries when repair work progressed and so there was not an additional enshrinement of Buddhist reliquaries after King Kyungmun. However, it is hard to decide that there was no repair work at the level of reconstruction at that time. Last, we can find a similar case to the square footstone of the wood pagoda in Hwangnyongsa Temple in the copper pagoda in Japanese Yaksasa Temple. In conclusion, it is assumed that the wooden pagoda in Hwangnyongsa Temple was lost to the fire in the 4th year of King Kwangjong's rule and thus the square footstone had been used as Jinho stone to protect Buddhist reliquaries and used as a propping stone for the major pillars after King Hyungjong.

Experimental Evaluation for Static Performance of I-Beam Concrete Slab System (I 형강 합성바닥판의 정적성능 평가)

  • 정영수;박창규;김용곤;이원표
    • Journal of the Korea Concrete Institute
    • /
    • v.13 no.5
    • /
    • pp.430-437
    • /
    • 2001
  • Recently, there have been increased much concerns about repair and rehabilitation works for aged concrete structures. It is in particular known that due to repeated overburden vehicles, there are significantly increasing number of aged concrete bridge slabs, which are strongly needed to construct and rehabilitate by innovative construction method. The objective of this research is to develop the new construction method of concrete slab in bridge superstructure, which can contribute to minimize a traffic congestion during repair and rehabilitation works of aged concrete slab, and can sufficiently assure the quality through the minimization of in-situ works at the site. I-beams with punch holes, which are substituted instead of main reinforcing steels in concrete slabs, can be manufactured in accordance with the specification in the factory, and be preassembled into the panel. After erecting the preassembled panels in the site, concrete will be poured into the slab panel. This research is to investigate mechanical properties of I-beam with punch holes itself, and then to investigate structural properties of assembled I-beam panels through static test, of which result can be utilized for the development of the new constructional method for concrete slab in bridge superstructure.

A study on the construction of government office in Dongnaebu at 19c (19세기 동래부(東萊府)의 관사영선(官舍營繕)에 관한 연구(硏究))

  • Kim, Sookyung;Kim, Soon il
    • Journal of architectural history
    • /
    • v.12 no.3
    • /
    • pp.87-100
    • /
    • 2003
  • This study is on the construction of government office of Dongnaebu through researching the construction reports and historical documents in 19century. Especially it focuses on the local construction system and operation for the government office. Main contents of the study are 1) Scope and process of construction, 2) Architectural administration and official notes, 3) Organization of participants and the feature, 4) Felling trees and transport, 5) Monetary of construction The results are summarized as follows. 1) Repair office customary were the courtesy new provincial man. Government building were inspected and repaired periodically. 2) Administrative system of construction have been operated. There are official notes which are about application, permition and order, concerned works such as logging at the bongsan, means of transport, paying wages and progressing works. 3) Organization of construction was made up of an officer and sangnee to supervise and supply. 4) Due to financial difficulty, local government reserved and appropriated funds with moneylending for building office.

  • PDF