• Title/Summary/Keyword: repair cycle

Search Result 310, Processing Time 0.023 seconds

A Case Study on the Life Cycle Cost Analysis of Steel Box Girder and Prestressed Concrete Box Girder Bridge (Steel Box교와 PSC Box교의 LCC 분석에 관한 사례연구)

  • Ahn Jang-Won;Cha Kang-Suk;Kim Yong-Su
    • Korean Journal of Construction Engineering and Management
    • /
    • v.2 no.2 s.6
    • /
    • pp.59-67
    • /
    • 2001
  • The purpose of this study is to evaluate economics by the Life Cycle cost(LCC) analysis of Steel Box Girder and Prestressed Box Girder bridge types. The study has been performed as a case study. A questionnaire survey for the repair and replacement cycle has been done in order to predict operation and maintenance costs. For LCC analysis and comparison, the present value technique is used. The results of this study are summarized as follows: (1) A LCC analysis model of Steel Box Girder and Prestressed Box Girder bridge types is suggested through a case study. (2) The repair and replacement cycle of elements of them are investigated using a questionnaire survey. (3) As a result of LCC case study, the type of Prestressed Box Girder bridge is analyzed more economic than Steel Box Girder.

  • PDF

A Probabilistic Analysis on the Repair and Replacement Cost of Educational Facilities (교육시설물의 수선교체비용에 대한 확률론적 분석 연구)

  • Yu, Yeong-jin;Son, Kiyoung;Kim, Ji-Myong;Kim, Taihui
    • Journal of the Korean Institute of Educational Facilities
    • /
    • v.25 no.1
    • /
    • pp.3-12
    • /
    • 2018
  • Educational facilities are more uncertain about maintenance costs due to their comprehensive and long life-cycle compared to commercial buildings. In addition, maintenance of the existing post management system can not maintain the original function of education facilities continuously and economically. In order to overcome this problem, it is necessary to analyze the repair and replacement cost for the uncertainty factor in maintenance. This study propose a model to determine repair and maintenance cost and cycle of educational facility based on probabilistic estimation concept. For the analysis, Monte Carlo simulation, a probabilistic analysis method, was applied based on the repair and maintenance history data of the educational facilities in Florida. The results of this study can be used as a guideline for quantitative facility management and facility management research.

Gene-Specific Repair of 6-4 Photoproducts in Trichothiodystrophy Cells

  • Nathan, Sheila;Van Hoffen, Anneke;Mullenders, Leon H.F.;Mayne, Lynne V.
    • BMB Reports
    • /
    • v.32 no.6
    • /
    • pp.554-560
    • /
    • 1999
  • TTD1BI cells are non-hypersensitive to UV irradiation and perform normal genome repair of pyrimidine dimers but fail to excise 6-4 photoproducts and, concomitantly, are unable to restore RNA synthesis levels following UV irradiation. This pointed to a detect in gene-specific repair and this study was undertaken to examine repair of 6-4 photoproducts at the gene-level. The results indicated a defect in gene-specific repair of 6-4 photoproducts in active genes, although strand-specificity of 6-4 photoproduct removal was essentially similar to that of normal cells. These findings indicate that the near normal UV resistance of TTD1BI cells may be due to the inability of these cells to remove DNA lesions preferentially, as well as to the cells opting out of the cell cycle to repair damage before resuming replication.

  • PDF

A DNA-Damage Response Gene Expression Analysis in MCF-7 followed by γ-Radiation (MCF-7 세포주의 γ선에 의한 DNA 손상 반응 유전자 발현 양상의 분석)

  • Park Ji-Yoon;Hwang Chang-Il;Park Woong-Yang;Kim Jin-Kyu;Chai Young Gyu
    • Korean Journal of Environmental Biology
    • /
    • v.23 no.1
    • /
    • pp.21-26
    • /
    • 2005
  • Cell response to genotoxic agents is complex and involves the participation of different classes of genes including cell cycle control, DNA repair and apoptosis. In this report, we presented a approach to characterize the cellular functions associated with the altered transcript profiles of MCF-7 exposed to low-dose in vitro gamma-irradiation. We used the method of human 2.4 k cDNA microarrays containing apoptosis, cell cycle, chromatin, repair, stress and chromosome genes to analyze the differential gene expression characterization that were displayed by radiation-exposed cell, human breast carcinoma MCF-7 cell line, such as 4 Gy 4 hr, 8 Gy 4 hr, and 8 Gy 12 hr. Among these genes, 66 were up-regulated and 49 were down-regulated. Specific genes were concomitantly induced in the results. Cyclin dependent kinase 4 (Cdk4) is induced for starting the cell cycle. This regulation is required for a DNA damage­induced G1 arrest. In addition to, an apoptotic pathways gene Bcl-w was concomitantly induced. Mismatch repair protein homologue-l (hMLH1), a necessary component of DNA mismatch protein repair (MMR), in G2-M cell cycle checkpoint arrest. The present study provides new information on the molecular mechanism underlying the cell response to genotoxic stress, with relevance to basic and clinical research.

Optimal Life Cycle Cost Design of a Bridge (교량의 생애주기비용 최적설계)

  • Park, Jang-Ho;Shin, Yung-Seok
    • Journal of the Korean Society of Safety
    • /
    • v.25 no.6
    • /
    • pp.115-122
    • /
    • 2010
  • The importance of the life cycle cost (LCC) analysis for bridges has been recognized over the last decade. However, it is difficult to predict LCC precisely since the costs occurring throughout the service life of the bridge depend on various parameters such as design, construction, maintenance, and environmental conditions. This paper presents a methodology for the optimal life cycle cost design of a bridge. Total LCC for the service life is calculated as the sum of initial cost, damage cost, maintenance cost, repair and rehabilitation cost, user cost, and disposal cost. The optimization method is applied to design of a bridge structure with minimal cost, in which the objective function is set to LCC and constraints are formulated on the basis of Korean Bridge Design Code. Initial cost is calculated based on standard costs of the Korea Construction Price Index and damage cost on damage probabilities to consider the uncertainty of load and resistance. Repair and rehabilitation cost is determined using load carrying capacity curves and user cost includes traffic operation costs and time delay costs. The optimal life cycle cost design of a bridge is performed and the effects of parameters are investigated.

Analysis of a Repair Time Preparation for the Preventive Maintenance in a Public Rental Housing Types (공공임대주택 유형별 구성재 사전예방보전 수선시기 설정연구)

  • Lee, Kang-Hee;Park, Guen-Soo;Chae, Chang-U
    • KIEAE Journal
    • /
    • v.12 no.5
    • /
    • pp.35-42
    • /
    • 2012
  • The rental housing has been a main role to supply a living space to the household who can not be available for the home-owner. Specially, the public rental housing is targeted for the low-income household and supplied with low rental fee. Therefore, the rent owner should manage and maintain the housing condition decently with a systematically maintenance plan which includes a repair time and scope, a repair cost. Among them, the repair time is important to make a repair plan. The repair time would be explained with two types, which is divided into a breakdown maintenance and a preventive maintenance. Each of them has a advantage in a repair cost, maintenance of the living condition and provision of the repair scope and method. In this paper, it aimed at providing the repair time in 12 components of the public rental housing which is reflected from a preventive maintenance. This study shows that overall, a permanent rental housing has a longer repair time than any other rental housing in 12 housing components. A public rental housing is closer to the a permanent rental housing then a redevelopment rental housing in repair time. On the other hand, the repair time of the 12 housing components is different form the rental housing. This leads to further study in difference of the repair time according to a tenant type.

Framework on a Prediction Model for Building Repair & Maintenance Using Big Data Analytic Approach (Big Data 분석 방법론을 이용한 건물 유지보수 예측 모형 기본 방안 개발)

  • Lee, Eun-Ji;Choi, Byoung-Il;Ko, Yong-Ho;Han, Seung-woo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.11a
    • /
    • pp.114-115
    • /
    • 2013
  • The maintenance and repair period consists the largest part of a construction project life cycle cost. However, it has been analyzed that the repairing plan relies on regulations and the officers' experience mostly that sometimes lead to performing unnecessary work. Moreover, the data occurred during repairing have not been stored in a system that can be used in future plans. Therefore, the purpose of this study is to suggest a repairing cost and time predicting model by applying the properties of the building.

  • PDF

Development of Repair and Replacement Cost Management System for Public Buildings to Establish Accurate Facility Management Budgets

  • Choi, Min-Chan;Lee, Chun-Kyong;Jung, Tae-Gab;Park, Tae-Keun
    • Architectural research
    • /
    • v.14 no.2
    • /
    • pp.75-83
    • /
    • 2012
  • Buildings that are more than 10 years old generally have considerable repair and replacement costs due to the rapid deterioration of their systems. For public buildings in particular, which have national and social significance, considerable effort is required not only to ensure a long life cycle and safety but also to minimize the overall public expense. Along with increasing repair and replacement requirements, however, there have been problems related to the establishment of an accurate facility management budget. To address these concerns, a repair and replacement cost management system was constructed. This system manages both invested maintenance and forecast costs to establish a reasonable repair and replacement planning process and budget. The effectiveness of the system was verified through a pilot test targeting one of public Corporation (K).

Evaluation of Performance on Repair Materials for Creek Concrete Structures (콘크리트 복개구조물용 보수재료의 성능 평가)

  • Lee, Chang-Soo
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.6 no.1
    • /
    • pp.205-212
    • /
    • 2002
  • The deterioration rate of concrete structures in urban area is accelerated due to rapid urbanization and environmental pollution. Repair materials and methods newly introduced in Korea should be investigated whether they are appropriate for the urban environment in Korea. The creek concrete structures are exposed in severe environmental condition than others. Based on these background in mind, the study is focused on evaluation of performance on repair materials used to rehabilitate creek concrete structures. To evaluate the performance of repair materials, four kinds of repair materials were selected based on polymer emulsion. This experimental study was conducted on fundamental performance such as setting time, compressive strength, bending strength, bonding strength, thermal expansion coefficient, and durability performance such as chloride diffusion, carbonation, chemical attack, and steel corrosion rate. On the basis of this study, the optimal repair material which is proper to the environment condition can be selected and service life of creek concrete structures can be extended. As a result, the life cycle cost can be reduced and the waste of material resources will be cut down.

Characteristics of the Economic Repair Time of the Components in Public Rental Housing

  • Lee, KangHee;Chae, ChangU
    • KIEAE Journal
    • /
    • v.15 no.1
    • /
    • pp.69-75
    • /
    • 2015
  • Building has required the repair money to improve or maintain the decent living condition continuously after construction. It needs to grasp the building deterioration to decide the scope and contents before it is repaired. Under various conditions such as physical, social and financial constraints, the repair plan would be prepared. Among constraints, the cost is indispensible to specify the repair time, repair scope and target. The required cost would be planned to preparation over the years. In this paper, it aimed at providing the repair strategy of the public rental housing in repair time, using the cumulative cost model which is $3^{rd}$ function. In the $3^{rd}$ function, the inflection point should exist in the line. And there are two types in the cumulative model, First, if the maximum cost be shown, the repair time would be provided. Second, if the maximum cost not be shown, the cumulative function should be proportionally increased and the repair strategy is properly provided with a short cycle. In results of this study, 11 items would provide the repair time. These cumulative function would be repaired about 4 years after constructed, and after about 4 years, the cumulative function would be continuously increased.