Abstract
Building has required the repair money to improve or maintain the decent living condition continuously after construction. It needs to grasp the building deterioration to decide the scope and contents before it is repaired. Under various conditions such as physical, social and financial constraints, the repair plan would be prepared. Among constraints, the cost is indispensible to specify the repair time, repair scope and target. The required cost would be planned to preparation over the years. In this paper, it aimed at providing the repair strategy of the public rental housing in repair time, using the cumulative cost model which is $3^{rd}$ function. In the $3^{rd}$ function, the inflection point should exist in the line. And there are two types in the cumulative model, First, if the maximum cost be shown, the repair time would be provided. Second, if the maximum cost not be shown, the cumulative function should be proportionally increased and the repair strategy is properly provided with a short cycle. In results of this study, 11 items would provide the repair time. These cumulative function would be repaired about 4 years after constructed, and after about 4 years, the cumulative function would be continuously increased.