• Title/Summary/Keyword: repair cost

Search Result 690, Processing Time 0.024 seconds

A Study on the Authorized Stockage List Slection Model Using Goal Programing (목표계획법을 이용한 사단급 ASL선정모형에 관한 연구)

  • 길계호;김충영
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 1998.10a
    • /
    • pp.75-78
    • /
    • 1998
  • The selection criteria of the Authorized Stockage List(ASL) in the Army is based on Army Regulation(AR)409, the selection method of ASL is not considered in cost, weight and volume of repair parts. This paper is focused on developing for a new selection model taking account of cost, weight and volume of repair parts. This model is applied to data of a division. The ASL selected in the model is more reduced in cost, weight and volume than that of the previous method.

  • PDF

Markovian Approach of Inspection Policy in a Serial Manufacturing System (Markovian 접근방법을 이용한 직렬생산시스템의 검사정책)

  • 정영배;황의철
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.11 no.17
    • /
    • pp.81-85
    • /
    • 1988
  • This paper presents a model that considers combinations of rework, repair, replacement and scrapping. Policy-Iteration method of inspection is proposed for a serial manufacturing system whose repair cost, scrap cost and inspection cost. when it fails, can be formulated by Markovian approach. Policy-Iteration stops when new inspection policy is the same as previous inspection policy. A numerial example is presented.

  • PDF

Experimental study on repair of corroded steel beam using CFRP

  • Chen, Meiling;Das, Sreekanta
    • Steel and Composite Structures
    • /
    • v.9 no.2
    • /
    • pp.103-118
    • /
    • 2009
  • It has been reported that more than thirty five percent of steel bridges in the USA are structurally deficient because of structural degradations. The degraded structures need either full replacement or rehabilitation such that they are able to provide the required services for a longer period of time. The cost for repair in most cases is far less than the cost of replacement. Moreover, repair method generally takes less time than replacement and also reduces service interruption time. Modern advanced composites have been used in aerospace and automotive fields since World War II. In the recent past, because of the high strength-to-weight ratio and high stiffness-to-weight ratio, these composite materials have been introduced to civil engineering infrastructures primarily for repair and rehabilitation of concrete structures. However, only a few preliminary studies on repair of corroded steel structures using theses composite materials are reported in the literature available in the public domain. Thus, in this study, a series of laboratory tests was undertaken to evaluate the effectiveness of this repair method using carbon fiber reinforced polymer composite. The paper discusses the test method and test results obtained from these tests.

Characteristics of Housing Repairs for the Weak Class in Rural Area - Focused on Voluntary Activity of the Korean Institute of Rural Architecture - (농촌지역 취약계층의 주택수선 현황 - 한국농촌건축학회 「농어촌 집 고쳐주기 봉사활동」을 중심으로 -)

  • Kim, Seung-Geun;Byun, Kyeonghwa
    • Journal of the Korean Institute of Rural Architecture
    • /
    • v.21 no.2
    • /
    • pp.1-10
    • /
    • 2019
  • This research aimed to identify characteristics of housing repairs for the weak class in rural area. Data are analyzed by the status according to year focusing on voluntary activity of the Korean Institute of Rural Architecture that is performing more than 10 years. The results are followings. First, approximately 63.3% of residents living in benefit houses are 70s and 80s in their age. They are weak in financial and physical and they have more than two weak points. Second, housing repairs were performed total 1,990 cases among 797 houses and average 2.5 cases per one house. Repair work in house interior is at the highest, the next is repair work in kitchen, repair work related to restroom, repair work for housing structure improvement, and repair work for insulation in order. Third, repair work required difficult work process and high cost is tend to decrease recently. However, work changing of wallpaper and papered floor and performing in outside is tend to increase because it has simple work process and low cost. Finally, barrier free needs to be more actively reflected for the weak class in rural area.

A Preliminary Study on the Prediction of School Facilities Repair Frequency and Rate (학교시설 수선주기 및 수선율 예측에 관한 기초적 연구)

  • Jung, Young-Han;Lee, Jae-Sung;Cho, Bong-Ho
    • The Journal of Sustainable Design and Educational Environment Research
    • /
    • v.9 no.2
    • /
    • pp.1-8
    • /
    • 2010
  • This study is to present an engineering solution for the repair frequency and repair rates of a building. The existing data for the repair frequency and repair rates are used to draw the probability distribution for the generalized repair frequency and repair rate in a building. The suggested methodology can be widely used for most buildings to estimate the legal repair frequency and repair rates. Also, the methodology can be applied to resolve the risks on the maintenance costs in LC (Life Cycle) plans or LCC (Life Cycle Cost) analysis. As the future studies, there are the multiple regression analysis including the parameters on incurred costs and the decision methods on efficient repair and replacement.

A Study on the Evaluation of Competitiveness and Economic Feasibility of Ship Repair Industry in Korea (우리나라 수리조선의 경쟁력 및 경제성 평가에 관한 연구)

  • Kim, Dug-Sup;Shin, Sang-Hoon;Shin, Yong-John
    • Journal of Korea Port Economic Association
    • /
    • v.38 no.3
    • /
    • pp.69-86
    • /
    • 2022
  • This study analyses the necessity of the large-size shipyard and explores competitiveness factors of it. Furthermore, the competitiveness is evaluated and the economic feasibility of building and operation of shipyard is examined. As a result of AHP analysis of the determining factors of the competitiveness of the repairing shipyard, the importance of the factors was found in the order of arrival and departure safety, repair technology, dock and wharf facilities, repair cost, repair period (on time delivery), and repair parts supply. Moving distance, repair service quality, repair parts supply, arrival and departure safety, repair technology, dock and quay wall facilities, and repair period (on time delivery) were identified as key factors in the AHP analysis for competitiveness of the Busan Port repair shipyard to be built in the future. As a result of the analysing economic feasibility, the net present value of the Busan Port repair shipyard construction and operation investment project was KRW 435.6 billion, and the internal rate of return was 9.8%, higher than the social discount rate (4.5%), and the cost-benefit ratio (B/C) was high at 1.167. As a result of the study, the necessity and economic feasibility of the Busan Port repair shipyard are sufficiently ensured, and the competitiveness assessment was highly positive.

Assessment of Appropriate Period and Cost(P&C) of Repair and Improvement for Irrigational Structures (논문 - 수리시설물의 적정개보수 주기 및 비용 산정)

  • Lee, Joon-Gu;Kim, Myong-Won;Shin, Tae-Ho
    • KCID journal
    • /
    • v.18 no.2
    • /
    • pp.142-160
    • /
    • 2011
  • This study was performed to apply the preventive management technique that is known for more economic and preventive for disaster than corrective technique to Repair & Improvement(R&I) Project policy of irrigational facilities. The appropriate periods of R&I Project had been driven to 40yrs, 24yrs, 27yrs, and 29yrs for reservoir, Pumping and drainage pumping station, Diversion weir and Irrigation & drainage canal respectively. The cost of R&I Project for 10 years had been estimated as 616.9 billion won per year including the 85 billion won for the project of 'Disaster prevention and Function continuity'. After the period of 'Improvement all at once', about 30yrs, 421.8 billion won was requested for 'Function continuity'.

  • PDF

Optimal replacement policy after extended warranty for a system with minimal repair warranty (최소수리 보증을 갖는 시스템에 대한 연장된 보증 이후의 최적의 교체정책)

  • Jung, Ki Mun
    • Journal of Applied Reliability
    • /
    • v.13 no.2
    • /
    • pp.77-86
    • /
    • 2013
  • Recently, an extended warranty of a system following the expiration of the basic warranty is becoming increasingly popular to the user. In this respect, we suggest a replacement model following the expiration of extended warranty with minimal repair warranty from the user's point of view in this paper. Under extended warranty, the failed system is minimally repaired by the manufacturer at no cost to the user during the original extended warranty period. As a criterion of the optimality, we utilize the expected cost rate per unit time during the life cycle from the user's perspective and suggest the optimal replacement period after extended warranty. Finally, a few numerical examples are given for illustrative purpose.

Framework on a Prediction Model for Building Repair & Maintenance Using Big Data Analytic Approach (Big Data 분석 방법론을 이용한 건물 유지보수 예측 모형 기본 방안 개발)

  • Lee, Eun-Ji;Choi, Byoung-Il;Ko, Yong-Ho;Han, Seung-woo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.11a
    • /
    • pp.114-115
    • /
    • 2013
  • The maintenance and repair period consists the largest part of a construction project life cycle cost. However, it has been analyzed that the repairing plan relies on regulations and the officers' experience mostly that sometimes lead to performing unnecessary work. Moreover, the data occurred during repairing have not been stored in a system that can be used in future plans. Therefore, the purpose of this study is to suggest a repairing cost and time predicting model by applying the properties of the building.

  • PDF

A Study on the Optimum Repair-Ordering Policies for Production Facilities (생산설비(生産設備)의 적정수리(適正修理) 발주정책(發注政策)에 관(関)한 연구(硏究))

  • Lee, Chang-Hun;Lee, Myeon-U;Jeong, Seong-Jin;Jo, In-Ho
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.8 no.1
    • /
    • pp.3-12
    • /
    • 1982
  • Three types of repair-ordering polices for the production facility with r-out-of-n configuration are considered. Policies are characterized by states of the system and two types of lead times ; regular lead time and expedited lead time. Optimum repair-ordering policy is determined by minimizing the cost rate for the system. Optimum policy consists of the type of policies and repair-ordering time. Variations of the optimum policies are observed with respect to variations of lead times and associated ordering costs and downtime cost, respectively.

  • PDF