• Title/Summary/Keyword: repair cost

Search Result 686, Processing Time 0.028 seconds

Repair Accumulation Cost for the Long-Term Repair Plan in Multifamily Housing Using the Forecasting Model of the Repair Cost (공종별 수선비용 추계모델을 활용한 공동주택 장기수선충당금 적립금액 산정)

  • Lee, Kang-Hee;Chae, Chang-U
    • KIEAE Journal
    • /
    • v.16 no.3
    • /
    • pp.137-143
    • /
    • 2016
  • Purpose: Apartment housing should conduct a cyclic repair to keep and maintain the building performance since they are constructed. Therefore, the repair plan would be provided for long term period which explains the repair time, items and repair cost. Residents of apartment housing are responsible to pay for the repair activities. For repair cost, residents would reserve the money for repair little by little continuously until the required repair time because the repair cost takes a big burden for residents and lots of money a time. But, there is no systematic approach to provide the long term repair cost because it is no proper forecast of the repair cost to the upcoming repair time. In this study, it aimed at providing the monthly accumulation of the long term repair cost with the survey data in Seoul. Method: For these, the surveyed data are classified into 6 categories and number of data are 1,918. In addition, it developed the repair cost model for the 24 repair works and the cumulation function which is reflected with the each cost model. Result: This study are shown as follows : First, among the various estimation for the repair cost, the power function has a goodness of fit in statistics. Second, the monthly accumulation would be 12,840 won/household in size of $100,000m^2$ management area and $81.7won/m^2$ in size of the 1,000 household number during 40 years.

Optimal replacement strategy under repair warranty with age-dependent minimal repair cost

  • Jung, K.M.
    • International Journal of Reliability and Applications
    • /
    • v.12 no.2
    • /
    • pp.117-122
    • /
    • 2011
  • In this paper, we suggest the optimal replacement policy following the expiration of repair warranty when the cost of minimal repair depends on the age of system. To do so, we first explain the replacement model under repair warranty. And then the optimal replacement policy following the expiration of repair warranty is discussed from the user's point of view. The criterion used to determine the optimality of the replacement model is the expected cost rate per unit time, which is obtained from the expected cycle length and the expected total cost for our replacement model. The numerical examples are given for illustrative purpose.

  • PDF

The Characteristics of the Repair Cost Distribution in Apartment Housing

  • Lee, KangHee;Chae, ChangU
    • KIEAE Journal
    • /
    • v.15 no.6
    • /
    • pp.19-26
    • /
    • 2015
  • Purpose: The repair would require to conserve and improve the building function and performance since built. Each household is responsible for maintaining the public facilities and paying the required cost. Therefore, it needs to get the tool or method to forecast the required cost in the future. Before the repair cost is provided, it needs to catch the repair cost distribution and provide the unit cost for the repair cycle. In this study, it aimed at providing the repair cost unit and analyzing the repair cost distribution in a roof proofing work, elevator work and building painting, which are divided into a fully work and partly change. Results of this study are shown that first, the average repair cost for roof proofing work is provided with $166.59{\times}10^3won/household$ and $1.59{\times}10^3won/m^2$ of a full change, $33.22{\times}10^3won/household$ and $0.33{\times}10^3won/m^2$ for a partly work. In addition, elevator work is $557.45{\times}10^3won/household$ and $5.38{\times}10^3won/m^2$ for a full change, $32.92{\times}10^3won/household$ and $0.56{\times}10^3won/m^2$ for a partly repair. Painting has a $304.48{\times}10^3won/household$ and $2.94{\times}10^3won/m^2$. Second, the distribution pattern of repair unit cost has a weibull-typed distribution which has a long tail to the right.

Cost Limit Replacement Policy under Imperfect Repair with Inspection Error (검사오차가 있는 불완전 수리에서의 비용한계 교체 정책)

  • Yun, Won-Young
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.16 no.2
    • /
    • pp.45-50
    • /
    • 1990
  • A replacement policy with repair cost limit is discussed. When a system fails, the repair cost is estimated by inspection and repair is then undertaken if the estimated cost is less than a predetermined limit L ; otherwise the system is replaced. After repair, the system is as good as new with probability(l-p) or is minimally repaired with probability p. It is assumed that repair cost can not be estimated exactly because of inspection error. When the failure time follows a Weibull distribution and repair cost a normal distribution, the value of repair cost limit minimizing the expected cost rate is shown to be finite and unique.

  • PDF

The Characteristics of the Repair Unit Cost in Public Rental Housing (공공임대주택 단위 수선비용 특성 분석)

  • Lee, KangHee;Chae, ChangU
    • KIEAE Journal
    • /
    • v.14 no.5
    • /
    • pp.103-109
    • /
    • 2014
  • Apartment housing should require the systematic maintenance to provide the decent living condition during its life. Each household should participate the maintenance activities and pay for the repair. Therefore, the required cost for repair would be needed to plan in the repair schedule because each household could not pay the much repair money at a time. After apartment constructed, a long term repair plan would be prepared in repair time, repair scope and a required cost. A few studies are said that the repair cost depends on the building deterioration, elapsed year and management factors. The above factors are not be certain to affect the repair management while it may be important to prepare the required money and the repair time. In this paper, it aimed at analyzing the correlation between the repair management and the management factors, especially total area, number of household. This would educe the unit cost per number of household and management area in the individual boiler and elevator with full change and full repair. The unit cost per number of household and area for full change are about 199,000 won/household and $1,954won/m^2$ in the individual boiler respectively. The unit cost of the elevator for full change is 94,000 won/household and $5,429won/m^2$ respectively. Second, this study shows that the elapsed year after construction would not be related the repair unit cost.

Cost Analysis Model with Minimal Repair of Spare Unit Repair Policy under Periodic Maintenance Policy (정기보전 제도에서 응급수리를 고려한 대체품 수리정책에서의 비용분석 모델)

  • Kim Jae-Joong
    • Journal of Applied Reliability
    • /
    • v.6 no.2
    • /
    • pp.151-161
    • /
    • 2006
  • This article is concerned with cost analysis model in periodic maintenance policy. The repair policy is differently applied according as unit importance during an item being used and unit restoration during an item being failed. So in this paper the repair policy with minimal repair is considered as follow : as the occurrence of failure between minimal repair and periodic interval time, unit is replaced by a spare unit until the periodic maintenance time arrived. Then total expected cost per unit time is calculated according to scale parameter of failure distribution in a view of customer's. The total expected costs are included repair and usage cost : operating, fixed, minimal repair, periodic maintenance and spare unit cost. Numerical example is shown in which failure time of item has Erlang distribution.

  • PDF

Cost Analysis Model with Minimal Repair of New Unit Repair Policy under Periodic Maintenance Policy (정기보전 제도에서 응급수리를 고려한 신제품 수리정책에서의 비용분석 모델)

  • Kim, Jae-Joong
    • Journal of Applied Reliability
    • /
    • v.6 no.3
    • /
    • pp.195-203
    • /
    • 2006
  • This paper deals with cost analysis model in periodic maintenance policy. The repair policy with minimal repair is considered as follow : as the occurrence of failure between minimal repair and periodic interval time, unit is replaced by a new unit before the periodic maintenance time comes. Then total expected cost per unit time is calculated according to time delta t in a view of customer's. The total expected costs are included repair and usage cost : operating, fixed, minimal repair, periodic maintenance and new unit expected cost. Numerical example is shown in which failure time of item has Normal distribution.

  • PDF

Replacement model under warranty with age-dependent minimal repair

  • Park, Minjae
    • International Journal of Reliability and Applications
    • /
    • v.18 no.1
    • /
    • pp.9-20
    • /
    • 2017
  • In this paper, we consider a renewable repair-replacement warranty strategy with age-dependent minimal repair service and propose an optimal maintenance model during post-warranty period. Such model implements the repair time limit under warranty and follows with a certain form of system maintenance strategy when the warranty expires. The expected cost rate is investigated per unit time during the life period of the system as for the standard for optimality. Based on the cost design defined for each failure of the system, the expected cost rate is derived during the life period of the system, considering that a renewable minimal repair-replacement warranty strategy with the repair time limit is provided to the customer under warranty. When the warranty is finished, the maintenance of the system is the customer's responsibility. The life period of the system is defined and the expected cost rate is developed from the viewpoint of the customer's perspective. We obtain the optimal maintenance strategy during the maintenance period by minimizing such a cost rate after a warranty expires. Numerical examples using field data are shown to exemplify the application of the methodologies proposed in this paper.

  • PDF

Effects Analysis of Governmental Research Buildings by the Main Components and Frame Repair Activities (공공 연구원 건축물의 대수선에 따른 효과분석)

  • Lee, Kang-Hee;Chae, Chang-U
    • Journal of the Korean Institute of Educational Facilities
    • /
    • v.26 no.6
    • /
    • pp.29-37
    • /
    • 2019
  • The research institute has a function to get the research outcome through the various experiments, data collection and analysis. Therefore, research building is important to keep the research condition or experiment environment. But buildings would be deteriorated and leaded into the deterrence of research. Maintenance is planned to protect the research building condition through various general repair or heavy repair. The heavy repair is generally conducted in massive repair scope or main components preparation. In this paper, it aimed at analyzing the effect of the massive or main components repair with inputted cost and its resulted output. In order to analyze the effect of a massive repair, it used the Benefit/Cost analysis and sensitivity analysis. Results of this study are as follows : The benefit/cost analysis shows that research building whose researcher continuously live and study has good effect. On the contrary, pace of the the experimental function is not good effect in benefit/cost analysis. But the experimental function is indispensible to get the research outcom for the research goal. Therefore, the experimental function will be planned to repair and get the historical repair data because the proper repair time would be prepared to cut down the repair cost.

Regression Analysis on the Dispute Cost Property in Apartment Housing Claims (비용항목의 희귀분석을 통한 공동주택 하자분쟁의 비용특성연구)

  • Kang, Yu-Mi;Kim, Beop-Su;Park, Jun-Mo;Choi, Jeong-Hyun;Seo, Deuk-Seok;Kim, Ok-Kyue
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2010.05a
    • /
    • pp.225-228
    • /
    • 2010
  • It is an social issue that is various claim related on the defect of apartment house. The cost of defect repair is the most important matter that residents dispute constructers with the huge time wasting and cost loss. For resolve the matter of defect claim, it must to be analyze to the cost property that study and find to pending issue about the cost of defect repair. Therefore this study is investigated the cost property of defect repair relation on correlation analysis and regression analysis around the judgement cost. Consequently, cost of the judgment is associated with cost of the accusation and cost of the defect repair, is recognizable as them that is closely connected. Meanwhile, the more time of take effect and time of lawsuit increase, the more cost of the judgment decrease by draw the regression equation. On the contrary, there are same aspects in the case on the cost of the accusation and cost of the defect repair.

  • PDF