• 제목/요약/키워드: repair and maintenance cost

검색결과 325건 처리시간 0.034초

BIM기반 건축물 수선교체비 산정 자동화방안 제시 (Suggestion of an Automatic BIM-based Repair & Replacement (R&R) Cost Estimating Process)

  • 박지은;유정호
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2016년도 춘계 학술논문 발표대회
    • /
    • pp.87-88
    • /
    • 2016
  • In order to assess the design value of engineering work from the point of view of LCC (Life Cycle Cost) in Korea, it is mandatory for all construction works that the total construction costs are over 10 billion won. The LCC includes initial construction costs, maintenance & operation costs, energy costs, end-of-life costs, and so on. Among these, the portion for maintenance & operation costs for a building is sizeable, as compared to the initial construction costs. Furthermore, the paradigm for construction industry has rapidly shifted from 2D to BIM, which includes design planning and data management. However, the study of BIM-based LCC analysis is not adequate today, even though all domestic construction projects ordered by the Public Procurement Service have to adopt BIM. Therefore, this study suggests a methodology of BIM-based LCC analysis that is particularly focused on repair and replacement (R&R) cost. For this purpose, we defined requirements of calculating R&R cost and extracted X from the relevant IFC data. Thereafter, we input them to the ontology of calculating the initial construction costs to obtain an objective output. Finally, in order to automatically calculate R&R cost, mapping with R&R criteria was performed. We expect that our methodology will contribute to more efficiently calculate R&R cost and, furthermore, that this methodology will be applicable to all range of total LCC. Thus, the proposed process of automatic BIM-based LCC analysis will contribute to making LCC analysis more fast and accurate than it is at present.

  • PDF

학교시설 수선주기 및 수선율 예측에 관한 기초적 연구 (A Preliminary Study on the Prediction of School Facilities Repair Frequency and Rate)

  • 정영한;이재승;조봉호
    • 교육녹색환경연구
    • /
    • 제9권2호
    • /
    • pp.1-8
    • /
    • 2010
  • This study is to present an engineering solution for the repair frequency and repair rates of a building. The existing data for the repair frequency and repair rates are used to draw the probability distribution for the generalized repair frequency and repair rate in a building. The suggested methodology can be widely used for most buildings to estimate the legal repair frequency and repair rates. Also, the methodology can be applied to resolve the risks on the maintenance costs in LC (Life Cycle) plans or LCC (Life Cycle Cost) analysis. As the future studies, there are the multiple regression analysis including the parameters on incurred costs and the decision methods on efficient repair and replacement.

주기적인 검사 정책하에서 최적예방 교체시기 결정에 관한 연구 (A Study of Optimal Maintenance Schedules of a System under the Periodic Inspection Policy)

  • 정현태;김제승
    • 산업경영시스템학회지
    • /
    • 제20권44호
    • /
    • pp.263-271
    • /
    • 1997
  • This paper presents a preventive maintenance model for determining the preventive replacement period of a system in which a failure rate is affected by the cumulative damage of fault and inspection. Especially, the failure rate function is considered to be a function of the cumulative damage of the fault and inspection time. Types of replacement considered are preventive replacement and failure replacement. Failure rate and expected cost function between replacement are derived. An optimal policy is obtained that minimizes the average cost per unit time for preventive replacement, failure replacement, inspection and repair.

  • PDF

교량의 내진성능확보를 위한 유지보수계획의 최적화 (Optimization of Maintenance and Retrofit Planning for Reliable Seismic Performance of the Bridges)

  • 고현무;박관순;김동석;이선영
    • 한국지진공학회:학술대회논문집
    • /
    • 한국지진공학회 2002년도 춘계 학술발표회 논문집
    • /
    • pp.284-293
    • /
    • 2002
  • Using the life cycle cost concept, optimum maintenance and retrofit planning for reliable seismic performance is suggested the overall life cycle cost to be minimized including the initial cost, the costs of inspection, repair, and failure. Limit states of the bridges are defined. And failure probabilities are computed through crossing theory. The effect of maintenance and retrofit is represented using the probability of damage detection and event tree analysis. Optimization of maintenance and retrofit planning method proposed from this research was applied to numerical examples. The analysis incorporates the acceleration and site conditions prescribed in the code, and the quality of inspection methods.

  • PDF

논문 - 수리시설물의 적정개보수 주기 및 비용 산정 (Assessment of Appropriate Period and Cost(P&C) of Repair and Improvement for Irrigational Structures)

  • 이준구;김명원;신태호
    • 한국관개배수논문집
    • /
    • 제18권2호
    • /
    • pp.142-160
    • /
    • 2011
  • This study was performed to apply the preventive management technique that is known for more economic and preventive for disaster than corrective technique to Repair & Improvement(R&I) Project policy of irrigational facilities. The appropriate periods of R&I Project had been driven to 40yrs, 24yrs, 27yrs, and 29yrs for reservoir, Pumping and drainage pumping station, Diversion weir and Irrigation & drainage canal respectively. The cost of R&I Project for 10 years had been estimated as 616.9 billion won per year including the 85 billion won for the project of 'Disaster prevention and Function continuity'. After the period of 'Improvement all at once', about 30yrs, 421.8 billion won was requested for 'Function continuity'.

  • PDF

An Optimum Maintenance Policy : A bayesian approach to periodic incomplete preventive maintenance with minimal repair at failure

  • Park, Kwang-Su;Jun, Chi-Hyuck
    • 한국경영과학회:학술대회논문집
    • /
    • 한국경영과학회 1997년도 추계학술대회발표논문집; 홍익대학교, 서울; 1 Nov. 1997
    • /
    • pp.193-196
    • /
    • 1997
  • In this paper we consider a Bayesian theoretic approach to periodic incomplete preventive maintenance with minimal repair at failure. We assume that the system failure rate is increasing as the frequency of PM increases and that the system is replaced at the K-th PM under this maintenance strategy. The optimal policies which minimize the expected cost rates are discussed. We seek the optimal periodic PM interval x and replacement time K under a Weibull failure intensity. Assuming suitable prior distribution for the Weibull parameters, we derive the posterior distribution incorporating failure data and obtain the updated optimal replacement strategies.

  • PDF

공동주택 하자보증금 청구소송의 연구 (A Study of the law-suit requesting the guarantee against defects in the Apartment Buildings)

  • 윤형인;조병수
    • 한국건축시공학회지
    • /
    • 제7권2호통권24호
    • /
    • pp.67-76
    • /
    • 2007
  • The purpose of this study is to propose the efficient improvement in the lawsuit to request the guarantee against defect. This study points out several problems about related act and subordinate statue and judgement by analyzing the character of contract in apartment house, related laws and regulations, appraisals and judicial decisions. This study deduces the necessity of the establishment of the specification and the breakdown cost for repair and maintenance work to provide the standard for the detached judgement.

두 가지 고장형태를 고려한 생산 및 예방보전 정책 (A Production and Preventive Maintenance Policy with Two Types of Failures)

  • 김호균;조형수
    • 품질경영학회지
    • /
    • 제30권3호
    • /
    • pp.53-65
    • /
    • 2002
  • This paper studies an economic manufacturing quantity (EMQ) model with two types of failures and planned preventive maintenance of the production facility. One is a type I (major) failure which should be corrected by a failure maintenance and the other is a type H (minor) failure which can be minimally repaired without interrupting the production run. The objective is to determine the lot size and preventive replacement policy minimizing the long-run expected cost per unit time. We consider a control policy with a constant production lot size and preventive maintenance after completing n production runs. It is assumed that both preventive and failure maintenance times are random and the demand arriving during a stock-out period is lost. An expression for the expected cost per unit time is obtained in the general case. A special case is discussed and numerical results are provided.

고속철도 강교량의 부식 피로신뢰성 기반 생애주기비용 분석 (Corrosion Fatigue Reliability-Based Life Cycle Cost Analysis of High-Speed Railway Steel Bridges)

  • 조효남;전홍민;선종완;윤만근
    • 한국철도학회논문집
    • /
    • 제11권1호
    • /
    • pp.107-113
    • /
    • 2008
  • 최근 생애주기비용 분석이 사회기반 시설물 경제성 평가 분야의 필수적 방법으로 대두됨에 따라 체계적이고 합리적인 방법으로 각 시설물의 생애주기비용을 산정하기 위한 노력이 진행되고 있다. 합리적인 생애주기비용 분석을 위해서는 초기비용 뿐만 아니라 유지관리 비용의 예측이 필요하나 국내에서는 고속철도 구간에 강교량을 가설한지 얼마 되지 않았기 때문에 이에 대한 유지관리 특성 등을 파악하고 있지 못한 실정이다. 이에 본 연구에서는 고속철도 소수주형교의 계측데이터와 Rahgozar 등이 제안한 부식열화를 고려한 피로강도감소계수 및 Miner 손상누적법칙을 이용하여 강교량의 주된 열화의 요인이 되는 부식과 피로의 손상을 고려한 체계신뢰성해석을 실시하였다. 이 체계신뢰성 해석결과를 바탕으로 고속철도 소수주형교의 설계단계 생애주기비용 분석 모델을 제안하였다.

BIM을 이용한 공동주택 장기수선비용 예측모델 제시 (A Study on the Forecasting of Using BIM Long-Term Maintenance Cost Model for Apartment)

  • 송아름;김지윤;윤석헌
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2013년도 춘계 학술논문 발표대회
    • /
    • pp.215-217
    • /
    • 2013
  • The maintenance management in buildings has got more important by the increasing complexity of building sizes and use. Nowadays an expectation and a possibility of BIM technology become accepted as a new construction management method, therefore many studies and legal systems of it are being suggested actively. Although orders for BIM projects are supposed to be increasing, at present the BIM information accumulated from planning and design still doesn't have its continuity at the maintenance step after completion of construction in terms of LCC. It can't use the possibility that BIM originally has, and also causes some confusion in communication. This study analyzes and classifies required information in terms of BIM in the range of estimating repair costs of apartment buildings, as an example of a way to use BIM information at the maintenance step.

  • PDF