• 제목/요약/키워드: repair & replacement cost

검색결과 134건 처리시간 0.028초

수리가능한 품목의 예방교체를 위한 주문정책 (A Spare Ordering Policy for Preventive Replacement with Repair)

  • 임성욱;박영택
    • 품질경영학회지
    • /
    • 제39권4호
    • /
    • pp.480-485
    • /
    • 2011
  • This paper presents a spare ordering policy for preventive replacement with minimal repair. To analyze the ordering policy, the failure process is modeled by a non-homogeneous Poisson process. Introducing the ordering, repair, downtime, replacement costs and salvage value, we derive the expected cost effectiveness as a criterion of optimality when the lifetime and lead times for the regular and expedited orders are generally distributed random variables. It is shown that, under certain conditions, there exists a finite and unique optimum ordering time which maximizes the expected cost effectiveness. A numerical example is also included to explain the proposed model.

A Bayesian Approach to Replacement Policy Based on Cost and Downtime

  • Jung, Ki-Mun;Han, Sung-Sil
    • Journal of the Korean Data and Information Science Society
    • /
    • 제17권3호
    • /
    • pp.743-752
    • /
    • 2006
  • This paper considers a Bayesian approach to replacement policy model with minimal repair. We use the criterion based on the expected cost and the expected downtime to determine the optimal replacement period. To do so, we obtain the expected cost rate per unit time and the expected downtime per unit time, respectively. When the failure time is Weibull distribution with uncertain parameters, a Bayesian approach is established to formally express and update the uncertain parameters for determining an optimal maintenance policy. Especially, the overall value function suggested by Jiagn and Ji(2002) is applied to obtain the optimal replacement period. The numerical examples are presented for illustrative purpose.

  • PDF

최소수리비용이 고장시간의 함수일 때 연장된 보증 정책 (Extended warranty policy when minimal repair cost is a function of failure time)

  • 정기문
    • Journal of the Korean Data and Information Science Society
    • /
    • 제23권6호
    • /
    • pp.1195-1202
    • /
    • 2012
  • 본 논문에서는 최소수리의 비용이 시스템의 수명시간에 의존하는 경우에 연장된 보증이 주어진 수리가 가능한 시스템에 대하여 사용자 측면에서의 총기대비용을 구하였다. 이를 위해서 연장된 보증을 정의하고 사용자 측면에서 연장된 보증이 종료된 이후의 교체모형을 가정하였다. 특히, 시스템의 교체모형에서 사용자가 연장된 보증을 선택하기 위한 기준을 제시하였으며, 시스템의 고장시간이 와이블 분포를 따를 때 수치적 예를 통하여 이를 설명하였다.

교육시설물의 수선교체비용에 대한 확률론적 분석 연구 (A Probabilistic Analysis on the Repair and Replacement Cost of Educational Facilities)

  • 유영진;손기영;김지명;김태희
    • 교육시설 논문지
    • /
    • 제25권1호
    • /
    • pp.3-12
    • /
    • 2018
  • Educational facilities are more uncertain about maintenance costs due to their comprehensive and long life-cycle compared to commercial buildings. In addition, maintenance of the existing post management system can not maintain the original function of education facilities continuously and economically. In order to overcome this problem, it is necessary to analyze the repair and replacement cost for the uncertainty factor in maintenance. This study propose a model to determine repair and maintenance cost and cycle of educational facility based on probabilistic estimation concept. For the analysis, Monte Carlo simulation, a probabilistic analysis method, was applied based on the repair and maintenance history data of the educational facilities in Florida. The results of this study can be used as a guideline for quantitative facility management and facility management research.

Cost analysis on renewable warranty policies subject to imperfect strategies using inter-failure intervals

  • Park, Minjae
    • International Journal of Reliability and Applications
    • /
    • 제14권1호
    • /
    • pp.41-54
    • /
    • 2013
  • In this paper, cost analysis is conducted using inter-failure interval under renewable warranty subject to imperfect repair for multi-component system. One way to model the imperfect repair is to use the quasi-renewal process (Wang and Pham 1996). Two alternative quasi-renewal processes were suggested by Park and Pham (2010) using quasi-renewal process; first is an altered quasi-renewal process with random variable parameter and second is a mixed quasi-renewal process considering replacement service and repair service, simultaneously. In this study, we use the altered and mixed quasi-renewal processes and develop the warranty cost model to obtain the expected value of warranty cost and to help company make important decisions regarding the warranty policy. Numerical examples are used to demonstrate the applicability of the methodology derived in the paper.

  • PDF

이산 시간을 고려한 시스템의 교체와 수리 비용 최적화 연구 (Optimal Periodic Replacement Policy Under Discrete Time Frame)

  • 이진표
    • 산업경영시스템학회지
    • /
    • 제43권1호
    • /
    • pp.61-69
    • /
    • 2020
  • Systems such as database and socal network systems have been broadly used, and their unexpected failure, with great losses and sometimes a social confusion, has received attention in recent years. Therefore, it is an important issue to find optimal maintenance plans for such kind of systems from the points of system reliability and maintaining cost. However, it is difficult to maintain a system during its working cycle, since stopping works might incur users some troubles. From the above viewpoint, this paper discusses minimal repair maintenance policy with periodic replacement, while considering the random working cycles. The random working cycle and periodic replacement policies with minimal repair has been discussed in traditional literatures by usually analyzing cases for the nonstopping works. However, maintenance can be more conveniently done at discrete time and even during the working cycle in real applications. So, we propose that periodic replacement is planned at discrete times while considering the random working cycle, and moreover provide a model in which system, with a minimal repair at failures between replacements, is replaced at the minimum of discrete times KT and random cycles Y. The average cost rate model is used to determine the optimal number of periodic replacement.

일반화된 모델에 대한 최적 교체정책에 관한 연구 (On Optimal Replacement Policy for a Generalized Model)

  • Ji Hwan Cha
    • 품질경영학회지
    • /
    • 제31권3호
    • /
    • pp.185-192
    • /
    • 2003
  • In this paper, the properties on the optimal replacement policies for the general failure model are developed. In the general failure model, two types of system failures may occur : one is Type I failure (minor failure) which can be removed by a minimal repair and the other, Type II failure (catastrophic failure) which can be removed only by complete repair. It is assumed that, when the unit fails, Type I failure occurs with probability 1-p and Type II failure occurs with probability p, $0\leqp\leq1$. Under the model, the system is minimally repaired for each Type I failure, and it is repaired completely at the time of the Type II failure or at its age T, whichever occurs first. We further assume that the repair times are non-negligible. It is assumed that the minimal repair times in a renewal cycle consist of a strictly increasing geometric process. Under this model, we study the properties on the optimal replacement policy minimizing the long-run average cost per unit time.

잔여 유효 수명 예측 모형과 최소 수리 블록 교체 모형에 기반한 비용 최적 예방 정비 방법 (Cost-optimal Preventive Maintenance based on Remaining Useful Life Prediction and Minimum-repair Block Replacement Models)

  • 주영석;신승준
    • 산업경영시스템학회지
    • /
    • 제45권3호
    • /
    • pp.18-30
    • /
    • 2022
  • Predicting remaining useful life (RUL) becomes significant to implement prognostics and health management of industrial systems. The relevant studies have contributed to creating RUL prediction models and validating their acceptable performance; however, they are confined to drive reasonable preventive maintenance strategies derived from and connected with such predictive models. This paper proposes a data-driven preventive maintenance method that predicts RUL of industrial systems and determines the optimal replacement time intervals to lead to cost minimization in preventive maintenance. The proposed method comprises: (1) generating RUL prediction models through learning historical process data by using machine learning techniques including random forest and extreme gradient boosting, and (2) applying the system failure time derived from the RUL prediction models to the Weibull distribution-based minimum-repair block replacement model for finding the cost-optimal block replacement time. The paper includes a case study to demonstrate the feasibility of the proposed method using an open dataset, wherein sensor data are generated and recorded from turbofan engine systems.

Experimental study on repair of corroded steel beam using CFRP

  • Chen, Meiling;Das, Sreekanta
    • Steel and Composite Structures
    • /
    • 제9권2호
    • /
    • pp.103-118
    • /
    • 2009
  • It has been reported that more than thirty five percent of steel bridges in the USA are structurally deficient because of structural degradations. The degraded structures need either full replacement or rehabilitation such that they are able to provide the required services for a longer period of time. The cost for repair in most cases is far less than the cost of replacement. Moreover, repair method generally takes less time than replacement and also reduces service interruption time. Modern advanced composites have been used in aerospace and automotive fields since World War II. In the recent past, because of the high strength-to-weight ratio and high stiffness-to-weight ratio, these composite materials have been introduced to civil engineering infrastructures primarily for repair and rehabilitation of concrete structures. However, only a few preliminary studies on repair of corroded steel structures using theses composite materials are reported in the literature available in the public domain. Thus, in this study, a series of laboratory tests was undertaken to evaluate the effectiveness of this repair method using carbon fiber reinforced polymer composite. The paper discusses the test method and test results obtained from these tests.

비 재생무료교체-수리보증이 종료된 이후의 교체모형 (Replacement Model Following the Expiration of NFRRW)

  • 정기문
    • 응용통계연구
    • /
    • 제23권6호
    • /
    • pp.1147-1156
    • /
    • 2010
  • 본 논문에서는 비 재생무료교체-수리보증이 종료된 이후의 수리가 가능한 시스템에 대한 교체정책을 제안한다. 이를 위해서, 비 재생무료교체-수리보증을 정의하고, 사용자 측면에서 비 재생무료교체-수리보증이 종료된 이후의 보전모형이 고려된다. 최적의 보전정책을 결정하기 위한 기준으로는 사용자 측면의 단위시간당 기대비용이 고려되고, 보증 기간이 종료된 이후에 발생되는 시스템의 유지비용은 사용자가 모두 지불하게 된다. 즉, 시스템의 운영기간 동안 사용자가 지불하여야 할 비용들이 주어져 있을 때, 비 재생무료교체-수리보증이 종료된 이후의 최적의 보전주기를 결정한다. 마지막으로 본 논문에서 제안된 보존정책을 설명하기 위해서 수치적 예를 살펴본다.