• Title/Summary/Keyword: repair

Search Result 6,959, Processing Time 0.032 seconds

Study on the inventory level of repair parts for tanks (전차부품 재고관리 연구)

  • Won Un-Sang;Jung Chang-Yong
    • Journal of the military operations research society of Korea
    • /
    • v.4 no.1
    • /
    • pp.57-68
    • /
    • 1978
  • In forecasting the demand rate of repair parts for old tank types under the limited historical data, this reportan alyzes which techniques give the smallest forecasting error, also economic repair limits and the return for additional repair costs are formulated as a mathematical model

  • PDF

Maintenance & Repairs of pier Structure (교각구조물의 유지보수)

  • 김규린
    • Journal of the Korean Professional Engineers Association
    • /
    • v.34 no.1
    • /
    • pp.35-43
    • /
    • 2001
  • This paper Is described for the maintenance and repair method for the pier structure currently under repair works in the Han river bridges. During the economic growth period from the year 1960 to 1980, our engineer was concentrated only for study of the construction method of bridge. We have neglected the importance for the maintenance & repair method of construction structure. Therefore this paper will give you some ideas of repair and maintenance method.

  • PDF

A study on estimation status and improvement plan of the repair and replacement cycle of a building (건축물 수선교체주기 산정현황과 개선방안에 관한 연구)

  • Kim, Jong-Rok;Son, Jae-Ho
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.1
    • /
    • pp.193-198
    • /
    • 2010
  • This study aimed at presenting the improvement plan for estimation of the repair and replacement cycle to analyze these current problems by considering the repair and replacement cycle theoretically and examining estimation status of home and abroad, and then drawing implication and problem based on brainstorming and expert opinion. The findings of a study is as follows. First, the problem is, for the domestic, that there is no clear standard of division to the cycle of repair and replacement and the repair and replacement cycle considering capability to deal with the change by construction method, development of the function of material and the number of years of progress is not being applied. That is, an estimation of economical repair and replacement cycle which considers the case that a large scale repair with the level of remodeling is done between 25 years and 35 years is necessary. For estimating the repair and replacement cycle, foreign country is providing this according to the use or the level of function of a building, but it is not the case for the domestic. A characteristic of each building should be reflected and the standard of estimation of the repair and replacement cycle to new construction material or method should be prepared to improve this. In addition, the method of classification of the subject item for the repair and replacement is necessary to be reorganized to be able to apply the standard of initial construction item of a building. Also, it is considered that a service standard which can reset the repair and replacement cycle based on status of a building with escape from the existing definite setup of the repair and replacement cycle through the management of background data of the repair and replacement is going to be necessary.

A Study on the Evaluation of Competitiveness and Economic Feasibility of Ship Repair Industry in Korea (우리나라 수리조선의 경쟁력 및 경제성 평가에 관한 연구)

  • Kim, Dug-Sup;Shin, Sang-Hoon;Shin, Yong-John
    • Journal of Korea Port Economic Association
    • /
    • v.38 no.3
    • /
    • pp.69-86
    • /
    • 2022
  • This study analyses the necessity of the large-size shipyard and explores competitiveness factors of it. Furthermore, the competitiveness is evaluated and the economic feasibility of building and operation of shipyard is examined. As a result of AHP analysis of the determining factors of the competitiveness of the repairing shipyard, the importance of the factors was found in the order of arrival and departure safety, repair technology, dock and wharf facilities, repair cost, repair period (on time delivery), and repair parts supply. Moving distance, repair service quality, repair parts supply, arrival and departure safety, repair technology, dock and quay wall facilities, and repair period (on time delivery) were identified as key factors in the AHP analysis for competitiveness of the Busan Port repair shipyard to be built in the future. As a result of the analysing economic feasibility, the net present value of the Busan Port repair shipyard construction and operation investment project was KRW 435.6 billion, and the internal rate of return was 9.8%, higher than the social discount rate (4.5%), and the cost-benefit ratio (B/C) was high at 1.167. As a result of the study, the necessity and economic feasibility of the Busan Port repair shipyard are sufficiently ensured, and the competitiveness assessment was highly positive.

Evaluating the bond strength between concrete substrate and repair mortars with full-factorial analysis

  • Felekoglu, Kamile Tosun;Felekoglu, Burcu;Tasan, A. Serdar;Felekoglu, Burak
    • Computers and Concrete
    • /
    • v.12 no.5
    • /
    • pp.651-668
    • /
    • 2013
  • Concrete structures need repairing due to various reasons such as deteriorative effects, overloading, poor quality of workmanship and design failures. Cement based repair mortars are the most widely used solutions for concrete repair applications. Various factors may affect the bond strength between concrete substrate and repair mortars. In this paper, the effects of polymer additives, strength of the concrete substrate, surface roughness, surface wetness and aging on the bond between concrete substrate and repair mortar has been investigated. Full factorial experimental design is employed to investigate the main and interaction effects of these factors on the bond strength. Analysis of variance (ANOVA) under design of experiments (DOE) in Minitab 14 Statistical Software is used for the analysis. Results showed that the interaction bond strength is higher when the application surface is wet and strength of the concrete substrate is comparatively high. According to the results obtained from the analysis, the most effective repair mortar additive in terms of bonding efficiency was styrene butadiene rubber (SBR) within the investigated polymers and test conditions. This bonding ability improvement can be attributed to the self-flowing ability, high flexural strength and comparatively low air content of SBR modified repair mortars. On the other hand, styrene acrylate rubber (SAR) modified mortars was found incompatible with the concrete substrate.

Shrinkage and Durability Characteristics of Latex Modified Repair Mortar for Agricultural Concrete Structures (농업용 콘크리트 구조물용 라텍스개질 보수용 모르타르의 수축 및 내구성능 평가)

  • Won, Jong-Pil;Lee, Jae-Young;Park, Chan-Gi;Park, Seong-Gi;Kim, Wan-Young
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.49 no.5
    • /
    • pp.23-30
    • /
    • 2007
  • This research was to evaluate the shrinkage and durability performance of latex modified repair mortar and to improve the service lift of the agricultural concrete structures. The shrinkage characteristics of the repair material creates the delamination of repair materials and existing concrete. It may reduce the service life of structures. Also the reduction of durability performance of the repair materials induces the destruction of the repaired concrete structures at early stage. In this research, plastic and drying shrinkage, thermal expansion coefficient for shrinkage properties, durability performance, permeability, repeated freezing and thawing, and resistance of chemical solution test were performed. Test results showed that the latex modified repair mortar indicated the shrinkage amount which the delamination does not happen, and the latex modified repair mortar appeared excellent long-term durability performance which can increase the service life.

A Study for Selection and Field Applicability of Asphalt Precast Pothole Repair Materials (아스팔트 프리캐스트 포트홀 보수재료의 선정과 현장 적용성에 관한 연구)

  • Kim, Jincheol;Bae, Sungho;Lee, Jinho;Yang, Jaebong;Kim, Jiwon
    • International Journal of Highway Engineering
    • /
    • v.16 no.4
    • /
    • pp.21-33
    • /
    • 2014
  • PURPOSES: The purpose of this study was to break away from the workforce method using cold-mix asphalt mixtures and has a constant quality and has develop repair materials of pre-production asphalt-precast types. METHODS: The selection of the repair material was determined as the results obtained through physical properties of materials and the field applicability. In case of repair materials, values obtained through Marshall stability test & the dynamic stability test & retained stability test as well as the site conditions was considered. In case of adhesive, test results were obtained through examination of the bond strength(tensile, shear) and the field applicability of the adhesive was examined through combined specimens to simulate field applications. RESULTS : According to the results of laboratory tests, in the case of repair materials, Marshall stability and dynamic stability, retained stability of cold-mix reaction type asphalt mixture is the highest. In the case of adhesive, two-component epoxy-urea has a very high bonding strength(tensile, shear) was most excellent. According to the results of field tests, when epoxy-urea was excellent workability. Also, the repair body through actual mock-up test did not occur large deformation and fracture after 12 months. CONCLUSIONS : A suitable repair material is cold-mix reaction type mixture of asphalt-precast, a suitable adhesive is a two-component epoxy-urea.

Structural Analysis of Gas Pipeline Repaired by Carbon Fiber Composite Materials (탄소 섬유 복합재료로 보수된 가스 배관의 구조 해석)

  • Park, Sungho;Kim, Hansang
    • Journal of the Korean Institute of Gas
    • /
    • v.18 no.2
    • /
    • pp.62-68
    • /
    • 2014
  • Composite repair methods besides welding methods such as surfacing and sleeve welding have been used as repair of damaged gas pipelines in foreign countries. Importance of safety management of city gas pipelines have been emphasized recently and our own repair manuals and codes for repair of city gas pipelines are required. It is right time to conduct research on the composite repair methods since the composite repair was introduced rather recently compared to the welding repair methods which have been investigated for long time. In this study, as a starting point of safety assessment of gas pipeline repaird by composite materials, structural analysis of gas pipeline repaired by carbon fiber composite materials was conducted using finite element analysis(FEA) method and the results was discussed.

In-line Automatic Defect Repair System for TFT-LCD Production

  • Arai, Takeshi;Nakasu, Nobuaki;Yoshimura, Kazushi;Edamura, Tadao
    • Journal of Information Display
    • /
    • v.10 no.4
    • /
    • pp.202-205
    • /
    • 2009
  • An automated circuit repair system was developed for enhancing the yield of nondefective liquid crystal panels, focusing on the resist patterns on the circuit material layer of thin-film transistor (TFT) substrates prior to etching. The developed system has an advantage over the parallel conventional system: In the former, the repair conditions depend on the type of resist whereas in the latter, the repair parameters must be fine-tuned for each circuit material. The developed system consists of a resist pattern defect inspection system and a pattern repair system for short and open defects. The repair system performs fine corrections of abnormal areas of the resist pattern. The open-repair system is equipped with a syringe to dispense resist. To maintain a stable resist diameter, a thermal insulator was installed in the syringe system. As a result, the diameter of the dispensed resist became much more stable than when no thermal insulator was used. The resist diameter was kept within the target of $400{\pm}100{\mu}m$. Furthermore, a prototype system was constructed, and using a dummy pattern, it was confirmed that the system worked automatically and correctly.