• 제목/요약/키워드: removal system

검색결과 3,537건 처리시간 0.035초

미세조류를 이용한 질소제거 장치의 크기 (Size Estimation of Microalgal System for Nitrogen Removal)

  • 김한욱;이우성;이철균
    • KSBB Journal
    • /
    • 제19권3호
    • /
    • pp.236-240
    • /
    • 2004
  • Batch experiment에서 다양한 질소 농도에서 구해진 질소제거 속도와 비 생장속도 등의 데이터를 토대로 4.6일의 체류시간을 갖는 2단 처리 장치를 설계하였다. 그리고 continuous experiments에서는 3.5일의 체류시간을 갖는 2단의 처리 장치를 설계하였다. 두 가지 값에 차이는 있지만 실제 현장에서 폐수 처리 장치를 설계할 때 충분한 자료가 되리라고 판단한다. 따라서 위의 결과를 토대로 기존 시스템에 미세조류 시스템을 부가한다면 기존공정의 단점인 잉여질소 제거 장치로서 충분히 역할을 수행해 배출 기준치를 만족시키는 안전한 폐수처리장치가 되리라고 판단한다.

자연정화방법에 의한 오수처리와 농업적 재이용 타당성 검토 (Feasibility Study of Natural Systems for Sewage Treatment and Agricultural Reuse)

  • 윤춘경;정광욱;함종화;전지홍
    • 한국농공학회지
    • /
    • 제45권6호
    • /
    • pp.194-206
    • /
    • 2003
  • A pilot study was performed to examine the feasibility of the pond system for further polishing of treatment wetland effluent to agricultural reuse of reclaimed water. The constructed wetland and pond system was installed in Konkuk University and the effluent from septic tank of school building was used as an influent to the wetland system. The effluent of the wetland was used as an influent to pond systems. The influent concentrations of total coliform(TC), fecal coliform (FC), and E. coli were about $10^5$MPN/100 ml, and they were reduced to less than 10,000 MPN/100 ml on average after wetland treatments, showing over 95 % removal. And they were further reduced to less than 1,000 MPN/100 ml in average, showing over 85∼93 % removal after pond treatment. Turbidity and SS were improved effectively on average and their pond effluent concentration was about 4.5 NTU and 9.8 mg/L in average, respectively Average $BOD^5$ concentrations were also reduced substantially to 9.3 mg/L with about 83 % removal rate after wetland and pond treatment systems. Nutrients removal was relatively low and removal rate for T-N and T-P was less than 43 and 44%, respectively after wetland and pond treatment. Considering stable performance and effective removal of bacterial indicators as well as other water quality parameters, low maintenance, and cost-effectiveness, pond system was thought to be an effective and feasible alternative for agricultural reuse of reclaimed water. This paper describes a preliminary result Iron pilot study and further investigations are recommended on the optimum design parameters before full scale application.

고밀도 해산어 양식장 순환수로부터 유기물 및 암모니아질소 동시 제거 (Simultaneous Removal of Carbon and Ammonia Nitrogen from Recirculation Water in High Density Seawater Aquaculture Farm)

  • 정병곤;김문태;이헌모
    • 환경위생공학
    • /
    • 제18권1호
    • /
    • pp.15-22
    • /
    • 2003
  • Treatability tests were conducted using EMC process to study the feasibility of applying this process as recycling-water treatment system in high density seawater aquaculture farm. To study the effect of organic and ammonia nitrogen loading on system performance, hydraulic retention time of reactor was reduced gradually from 12hr to 10min. The conclusions are can be summarized as follows. When the system HRT was reduced from 12hr to 10 min gradually, there was little noticeable change(reduction) in ammonia nitrogen removal efficiencies until 2hr of HRT, however, removal efficiencies were decreased dramatically when the system was operated under the HRT of less than 2hr. In case of organics(COD), there was no dramatic deterioration in removal efficiencies depending on HRT reduction. More than 90% of removal efficiencies were maintained successfully when the system was operated at the HRT of 10 min. In case of system performance depending on media packing ratio in reactor, there was little difference in each reactor performance depending on media packing ratio in reactor when the reactors were operated under the HRT of longer than 1hr, however, differences in reactor performances were considerably evident when the reactors were operated under the HRT of shorter than 1hr. That is, the more reactor was packed, the better reactor performed. When comparing reactor performance among 25%, 50%, 75% packed reactor, it can be judged that media packing ratio more than 50% plays no significant role in increasing reactor performance. For this reason, packing the media less than 50% is more reasonable way in view of economic. Such a tendency well agreed with the variation of ammonia-nitrogen removal efficiencies according to the media packing ratio in reactors at each HRT. Difference in effluent ammonia-nitrogen concentration between 50% media packing reactor and 75% media packing reactor was negligible. When comparing with the results of 25% packing reactor, difference was not so great.

인공습지의 농촌지역 오수정화시설에 적용가능성 연구 (Feasibility Study of Constructed Wetland for the Wastewater Treatment in Rural Area)

  • 윤춘경;권순국;권태영
    • 한국농공학회지
    • /
    • 제40권3호
    • /
    • pp.83-92
    • /
    • 1998
  • Field experiment was performed from August 1996 to January 1998 to examine the applicability of constructed wetland system for wastewater treatment in rural area. The pilot plant was installed in Kon-Kuk University and the school building septic tank effluent was used as an influent to the treatment basin. Hydraulic loading rate was about 0.1 6$0.16^3/m^2$ day and theoretical detention time in the system was 1.38 days. The treatment basin was composed of sand and reed. The influent DO concentration was low and many cases close to zero, but effluent concentration was higher than the influent which implies that oxygen was supplied naturally. The average concentration of influent BOD was 126mg/L, and with average removal rate of 69 % the average effluent concentration was 4Omg/L which satisfied the effluent water quality standard for the system of interest. The average influent concentration of COD was 2Olmg/L and average effluent concentration was 75mg/L with average removal rate of 60%. The performance of BOD and COD tends to deteriorate in the low temperature, and appropriate action needs to be taken during the cold winter time for stable operation. The average influent concentration of SS was 5Omg/L, and effluent was 1 1mg/L with average removal rate of 76% which satisfied the effluent water quality standard for the system of interest. The results for the regulated components, SOD and SS, from the experiment showed that constructed wetland system can meet the effluent water quality standards. The average influent concentration of total phosphorus was 25.6mg/L and average effluent concentration was 7.8mg/L with average removal rate of 63%. Not like the performance of the above components, average nitrogen removal rate was only 11.2% which is not satisfactory. Although, nitrogen is not regulated at this moment, it can cause many environmental problems including eutrophication. Therefore, nitrogen removal efficiency should be improved for actual application. From the result of the field experiment, constructed wetland system was thought to be an appropriate alternative for wastewater treatment in rural area.

  • PDF

고수부지에 조성한 수질정화 자유수면습지의 초기운영단계 질소제거 (Nitrogen Removal Rate of Free-Water-Surface Treatment Wetland System Constructed on Floodplain During Its Initial Operating Stage)

  • 양홍모
    • 한국환경복원기술학회지
    • /
    • 제6권6호
    • /
    • pp.41-48
    • /
    • 2003
  • Nitrogen removal rate and emergent plant growth were investigated of a free-water-surface constructed treatment wetland system, whose dimensions were 31m in length and 12m in width. The system was constructed on floodplain in the Kwangju Stream from May to June 2001. Cattails(Typha angustifolia) were transplanted from natural wetlands and their stems were cut at about 40cm height from their bottom ends. Water of the Kwangju Stream were funneled into the system by gravity flow and its treated effluent was discharged back into the stream. The average height of the cattail stems was 45.2cm in July 2001 and 186cm in October 2001. The number of stems averaged 22 stems/$m^2$ in July 2001 and 52 stems/$m^2$ in September 2001. Volume and water quality of inflow and outflow were analyzed from July 2001 through December 2001. Inflow and outflow averaged 40.01 and 39.55 $m^3$/day, respectively. Hydraulic detention time was about 1.5 days. Average nitrogen uptake by cattails was 69.31 $N\;mg\;m^{-2}\;day^{-1}$. Removal rate of $NO_3-N$, $NH_3-N$ and T-N averaged 195.58, 53.65 and 628.44 $mg\;m^{-2}\;day^{-1}$, respectively. The average removal rate of T-N was about 39%.

폐난각과 미세조류를 이용한 산성광산배수처리 (Treatment of Acid Mine Drainage using Eggshells and Microalgae)

  • 최희정
    • 한국물환경학회지
    • /
    • 제30권6호
    • /
    • pp.647-652
    • /
    • 2014
  • The aim of this study was to investigate the heavy metal removal and biomass productivity in the Acid Mine Drainage (AMD) using eggshell and microalgae. The experiment was operated 6 days in the eggshell and microalgae hybrid system, and using eggshell powder and microalgae as Chlorella vulgaris. The obtained result indicated that the biomass productivity of 2.82 g/L/d from 1.12 g/L initial concentration in 6 days was reached with light transmittance of 97% at a 305 mm depth in the optical panel photobioreactor (OPPBR). The total removal efficiency of Fe, Cu, Zn, Mn and Cd was found to be 98.92%, 99.91%, 98.78%, 88.99% and 98.00% in the AMD using eggshell and Chlorella vulgaris hybrid system, respectively. Additionally, there were significant relationships between biomass and concentration of each heavy metal ($R^2$ = 0.8771, 0.8643, 0.8669, 0.9134 and 0.6277 for Fe, Cu, Zn, Mn and Cd). These results indicated that the eggshell and microalgae hybrid system was highly effective for heavy metal removal when compared to the conventional biological process in the AMD. Therefore, the eggshell and microalgae hybrid system was effective for heavy metal removal and biomass productivity and can be applied to treat AMD in treatment plant.

자유수면형 인공습지 환경·생태공원 설계 -생태적 수질정화비오톱 공원의 구조설계를 중심으로- (A Study on Constructed Wetland Ecological Park Design with Multiple-cell FWS Layout -focus on Structural Design of Sustainable Structured wetland Biotope(SSB) Park-)

  • 변우일
    • 한국환경복원기술학회지
    • /
    • 제9권5호
    • /
    • pp.1-9
    • /
    • 2006
  • The purpose of this study is to make a design guideline in designing constructed wetland which can treat water quality both of point and nonpoint source water pollution. It focuses on structural aspects of two case studies of constructed wetland applying SSB(Sustainable Structured wetland Biotope) system in Korea. The constructed wetland of Lake Ju-am which was constructed in 2002 by Environmental Management Corporation, was designed by applying SSB system. It shows higher removal efficiency than expected - 56% of BOD removal efficiency, 60% of T-N removal, and 76% of T-P removal efficiency. In two cases, total wetland areal extents were calculated referred to treatment efficiency. The system is consist of micro-cell structures : inflow channel, forebay, multiple wetland cells and micro-pool. When designing constructed wetland appropriate in local area, the total organic system of vertical and horizontal structure : geology, hydrology, land use, and ecological surroundings of the sites should be considered totally.

분무수 pH 변화에 따른 에어와셔의 가스제거 성능변화 (Gas removal efficiency of air washer system according to pH of sprayed water)

  • 남승백;하종필;김태형;문인호;조인수
    • 대한설비공학회:학술대회논문집
    • /
    • 대한설비공학회 2007년도 동계학술발표대회 논문집
    • /
    • pp.488-492
    • /
    • 2007
  • In this study, experiment was done to verify the relationship between sprayed water's pH and gas removal efficiency of the Air Washer system. The experiment was done with sprayed water's pH in between pH 4.7 to 7.7, and Ion Chromatography analysis was used to identify the system's gas removal efficiency. As a result, $NH_3$ is removal efficiency decreased under 50% above pH 7, and $SO_X$ and $NO_X$ removal efficiency decreased under pH 6. Through this research, the optimum pH operating condition of the Air Washer System was conformed to be in range between pH6 to pH6.5.

  • PDF

소규모 오수처리 시스템에서의 제올라이트에 의한 질소 제거 (Nitrogen Removal using Zeolite at On-site Wastewater Treatment System)

  • 방천희;권순국
    • 한국농공학회지
    • /
    • 제44권2호
    • /
    • pp.161-173
    • /
    • 2002
  • Recently, absorbent biofilters, which are inexpensive and easy to manacle, have been supplied to the rural areas, but have limitations in removing the nutrients effectively. Accordingly, as an alternative plan. natural zeolites were arranged in front or at the rear of the absorbent biofilters, and their removal efficiency for nitrogen and, ultimately, their applicability to the on-site wastewater treatment system were studied. Furthermore, the same experiments were carried out on artificial zeolites, made from coal ashes at National Honam Agricultural Experiment Station, to compare natural zeolites with artificial ones. Treated wastewater through the Absorbent Biofilter showed 22.6% nitrogen removal efficiency, while 64.6% was attained when natural Zeolites were placed in front of the absorbent biofilters (Zeolite-Aerobic process). As an addition, phosphorus was also efficiently removed. On the other hand, Aerobic-Zeolite process, which arranged natural zeolites at the rear of the biofilters, did not have significantly higher nitrogen removal as compared to the treatment using only the absorbent biofilters. Furthermore, upon regeneration of the natural zeolite, the ion exchange rate was fecund to increase over 10% as compared to before regeneration. Our results show that natural zeolites, applied to the on-site wastewater treatment system through the Zeolite-Aerobic process, not only increase the removal efficiency of nutrients, but, by choosing the appropriate regeneration time, can also be cast-effective. Artificial zeolites, on the other hand, though more efficient in removing nutrients, cannot be regenerated and, therefore, are not cost-effective.

SAFETY ANALYSIS OF INCREASE IN HEAT REMOVAL FROM REACTOR COOLANT SYSTEM WITH INADVERTENT OPERATION OF PASSIVE RESIDUAL HEAT REMOVAL AT NO-LOAD CONDITIONS

  • SHAO, GE;CAO, XUEWU
    • Nuclear Engineering and Technology
    • /
    • 제47권4호
    • /
    • pp.434-442
    • /
    • 2015
  • The advanced passive pressurized water reactor (PWR) is being constructed in China and the passive residual heat removal (PRHR) system was designed to remove the decay heat. During accident scenarios with increase of heat removal from the primary coolant system, the actuation of the PRHR will enhance the cooldown of the primary coolant system. There is a risk of power excursion during the cooldown of the primary coolant system. Therefore, it is necessary to analyze the thermal hydraulic behavior of the reactor coolant system (RCS) at this condition. The advanced passive PWR model, including major components in the RCS, is built by SCDAP/RELAP5 code. The thermal hydraulic behavior of the core is studied for two typical accident sequences with PRHR actuation to investigate the core cooling capability with conservative assumptions, a main steam line break (MSLB) event and inadvertent opening of a steam generator (SG) safety valve event. The results show that the core is ultimately shut down by the boric acid solution delivered by Core Makeup Tank (CMT) injections. The effects of CMT boric acid concentration and the activation delay time on accident consequences are analyzed for MSLB, which shows that there is no consequential damage to the fuel or reactor coolant system in the selected conditions.