• Title/Summary/Keyword: removable anchor

Search Result 5, Processing Time 0.026 seconds

Development of Removable-Strand Compression Anchor (압축형 제거 앵커의 개발 및 성능 평가)

  • 김낙경;김성규
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2001.03a
    • /
    • pp.339-346
    • /
    • 2001
  • For temporary excavation support in private land area, the strand of ground anchor should be removed In order to get permission to install anchors. The extractable or removable-strand compression anchor system was developed and evaluated by a series of pull-out load tests. Anchor pull-out tests were performed on seven instrumented full-scale low-pressure grouted anchors installed in weathered soil at the Geotechnical Experimentation Site at Sungkyunkwan University, Four anchors are the compression type anchors and three are the tension anchors. Performance test, creep test, and long term relaxation test were performed and presented. Load distributor was developed in order to distribute large compressive stresses in grout.

  • PDF

A Method of SMART Anchor for a Weaked Ground Condition (연약지반용 스마트 앵커 공법)

  • Park, Dae-Woong;Jeong, Jong-Ki;Kim, Jeong-Ryeol
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2009.09a
    • /
    • pp.1334-1337
    • /
    • 2009
  • A SMART anchor is a kind of friction mount anchor, the load is diffused and applied to the various parts of the distributed bond length, having less impact on the grout strength, and being able to secure necessary anchoring force in relatively soft grounds. Smart anchor can have strong loads in soft and weak grounds as in rock beds.

  • PDF

Implant-assisted removable partial denture for severely atrophied mandible (심한 하악 치조제 흡수를 가진 환자에서 임플란트를 이용한 가철성 국소의치로 수복한 증례)

  • Choi, Bada;Kim, Yeun Ju;Lee, Jae Hoon
    • The Journal of Korean Academy of Prosthodontics
    • /
    • v.57 no.2
    • /
    • pp.171-175
    • /
    • 2019
  • Mandible with severe alveolar bone atrophy poses a significant challenge in terms of reproducing clinically acceptable anatomy for a removable prosthesis. To overcome this potential complication, altered cast impression technique is often recommended to capture accurate and functional gingiva tissues. It becomes possible to get proper anchors functional impression by placing 2 implants crowns which were impossible in previous implant overdenture impression technique. In this case, an 80-year old female patient with severe mandibular ridge atrophy was treated with an implant-assisted removable partial denture with two implant crowns on the canine area. An altered cast impression was taken with an individual tray on a metal framework of removable partial denture on both posterior edentulous areas. The patient was satisfied with the final prosthesis after failure of 2 previous prostheses. Clinician had a difficult time to manage disabled patient and patient were suffered with ill-fitting denture due to inaccurate impression in conventional overdenture condition. The oral rehabilitation was completed with placing 2 implants as proper anchor.

Application of Removable Ground Anchor Using Auto back Equipment (Auto back 인장장치를 이용한 제거식 앵커의 적용성)

  • Lee, Song;Lee, Sung-Won;Park, Sang-Kook;Kim, Sa-Dong
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.8 no.4
    • /
    • pp.223-230
    • /
    • 2004
  • It is growing the application of the removal ground anchor with tension force for earth retaining constructions in the downtown. Nowadays, we can find the compression dispersion anchor on many site. But, it is occur some probelems in behabior of anchors because of impossible to tense p.c strand uniformly with existing equipment due to different length of p.c strand. So we tried to tense each p.c strand uniformly with auto back equipment in-situ test. This study compared and analyzed apply to elastic theory in-situ test results of an existing equipment with those of auto back equipment. As a result of the test, It has been proved that differences of tension force in the existing equipment increases with increasing the number of p.c strand. This can cause an ultimate failure of the concentrated p.c strand and a shear failure of ground. So it has been proved that auto back equipment is necessary.

Research on no coal pillar protection technology in a double lane with pre-set isolation wall

  • Liu, Hui;Li, Xuelong;Gao Xin;Long, Kun;Chen, Peng
    • Geomechanics and Engineering
    • /
    • v.27 no.6
    • /
    • pp.537-550
    • /
    • 2021
  • There are various technical problems need to be solved in the construction process of pre-setting an isolation wall into a double lane in the outburst prone mine. This study presents a methodology that pre-setting an isolation wall into a double lane without a coal pillar. This requires the excavation of two small section roadways to dig a wide section roadway, followed by construction of the separation wall. During this process the connecting lane is reserved. In order to ensure the stability of the separation wall, the required bearing capacity of the isolation wall is 4.66 MN/m and the deformation of the isolation wall is approximately 25 cm. To reduce the difficulty of implementing support the roadway is driven by 5 m/d. After the construction of the separation wall, the left side coal wall is brushed 1.5 m to make the width of the gas roadway reach 2.5 m and the roadway support utilizes anchor rod, ladder beam, anchor cable beam and net configuration. During construction, the concrete pump and removable self-propelled hydraulic wall mold are used to pump and pour the concrete of the isolation wall. In the process of mining, the stress distribution of coal body and isolation wall is detected and measured on site. The results demonstrate that the deformation of the surrounding rock of roadway and separation of roof in the roadway is small. The stress of the bolt and anchor cable is within equipment tolerance validating their selection. The roadway is well supported and the intended goal is achieved. The methodology can be used for reference for similar mine gas control.