• 제목/요약/키워드: remodeling project

검색결과 178건 처리시간 0.044초

DEVELOPMENT OF BIM-BASED DECISION-MAKING SUPPORT SYSTEM FOR APARTMENT REMODELING

  • Dong-Gun Lee;Sik Kim;Hee-Sung Cha;Ju-Yeoun Han
    • International conference on construction engineering and project management
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1117-1123
    • /
    • 2009
  • Compared with other industries, the construction Industry has many parties(A/E/C) as well as many types of construction activities. Especially, as for the remodeling project, the owner group the remodeling union consists of various stakeholders union and requiring the additional activities of demolition except for the existing new building construction project. Like this, the remodeling project has its own characteristics different from a new building construction project. As for the remodeling project, the Owner's decision making for a remodeling alternative has to be preceded, and other parties are required to propose a remodeling alternative which satisfies the Owner's requirements. However, because of time constraints, many types of problems occur during the decision-making process. In consideration of this, in this research, the authors would like to suggest a decision-making support system to help the Owner's decision-making in the early stage of a remodeling project. For this paper purpose of a remodeling decision-making framework based on Building Information Modeling(BIM) was suggested to help with the Owner's decision-making for each remodeling item and the decision-making support system was evaluated through Case Study.

  • PDF

A Research about Importance and Satisfaction in Each Tasks on Apartment Remodeling (공동주택 리모델링 사업의 업무별 중요도 및 만족도 조사)

  • Oh, Chi-Seob;Choi, yun-ki
    • Journal of the Architectural Institute of Korea Structure & Construction
    • /
    • 제34권6호
    • /
    • pp.35-43
    • /
    • 2018
  • As rapid increasing of domestic apartments, decline of the market value of the old apartment and to be announced policy by government are re-lighting to be insufficient growth than the past 15 years in market of apartment remodeling. In this study, research the conflicts on apartment remodeling project and analysis of importance and satisfaction by survey. Also, the survey was being progressed for every participant who are related in an apartment remodeling project. After this study, this study will propose basic data for effective way to improve on apartment remodeling project. For this purpose, generalize the project stage level by level. And analysis status of business progress to be felt from participants of project. According to the results by a survey, the each result of elements can be a reference value for a good way of apartment remodeling to proceed and improve.

Conflict Management in Planning phase of Remodeling Project through Multi-Agent based on Fuzzy Inference. (퍼지추론 기반 멀티 에이전트를 통한 리모델링 사업 전 추진단계에서의 갈등관리)

  • Park, Ji-Eun;Yu, Jung-Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 한국건축시공학회 2015년도 춘계 학술논문 발표대회
    • /
    • pp.202-203
    • /
    • 2015
  • To promote the remodeling project it is important to get apartment residents' consent. It is significant variable to determine project to progress smoothly from planning stage which committee of association establishment sets up to establishment stage of association. On average, it takes about 1~1.6 year in planning phase which means before construction phase of remodeling. Therefore, it is very important issue to get apartment residents' consent in planning phase. In this research, we focused on residents' opinion and proposed solution of conflict with gathering residents' opinion to proceed remodeling project. By setting particular remodeling situation, related residents represented as agents made effort to efficient coordination to reduce total duration of decision making. Therefore, we proposed multi-agent based on fuzzy inference to simulate behavior of decision making on remodeling project effectively. From this method, optimal alternative is selected by considering each agents' attributes which represented by fuzzy set. This research will develope to further research for realizing concrete multi-agent based on fuzzy inference considering all stakeholders in remodeling project.

  • PDF

The Study on the Project Delivery System for Vitalizing the Green Remodeling (그린리모델링 사업 활성화를 위한 발주방식 제안)

  • Nam, Sunghoon;Kim, Kyungrai
    • Korean Journal of Construction Engineering and Management
    • /
    • 제18권2호
    • /
    • pp.3-11
    • /
    • 2017
  • Aging buildings over 15 years reaches about 74% of 177 thousand buildings in Domestic public buildings. Due to the aging building, the energy loss is a serious problem. In order to reduce the energy usage through improving the energy efficiency on the existing buildings, the government & the local autonomous entity conduct the energy efficiency projects through the remodeling, repairing & equipment replacement on the existing buildings. The green remodeling is applied to the existing public buildings in recently revised the act on the creation and support of green building. However, the standard is not obvious that the work scope of green remodeling, financing and project delivery method. This paper propose is to suggest project delivery system for vitalizing the green remodeling. Green remodeling is defined on basis of the occurring work under project life cycle based on the existing building process and the financing method for owners and companies and the project delivery system according to work scope of green remodeling are proposed in this paper

Verification of the Entire Process Model through Green Remodeling Pilot Project (그린리모델링 실증 시범사업을 통한 프로세스의 전 과정에 대한 검토)

  • Jeong, Jin-Woo;Ju, Jung-Hoon;Lee, Keon-Ho
    • Journal of the Korean Solar Energy Society
    • /
    • 제38권3호
    • /
    • pp.37-45
    • /
    • 2018
  • The purpose of this study is to review all phases of the pilot project through the implementation of the Green Remodeling process. The Green Remodeling process was developed to facilitate anyone's ease of use. The Green Remodeling process consists of five phases : project, plan, design, construction, operation and maintenance. Each stage simulation was performed and the energy saving was predicted. Architects can easily obtain energy information of a building. In this study, we propose a green remodeling proposal plan through pilot project. Ultimately, the spread of green remodeling will greatly contribute to achieving the goal of reducing greenhouse gas emissions.

A Case study on the Remodeling Design through BIM(Building Information Modeling) (BIM을 활용한 리모델링계획 사례연구)

  • Min, Young-Gi;Lee, Jae-Kook
    • Journal of The Korean Digital Architecture Interior Association
    • /
    • 제12권4호
    • /
    • pp.125-132
    • /
    • 2012
  • In this study based on BIM(Building Information Modeling) apply for performing efficient remodeling project and utilized. And this study will examine a real project where a BIM based process was used in the remodeling of an single-family homes. In the remodeling design phase of the planning process was conducted for the BIM process modeling, BIM in the remodeling stage while performing the required range and level of the remodeling process were studied. Based on this, communication between client and remodeling designer, participants more expect that smooth and speeds up in remodeling. For client decision support, troubleshooting of remodeling of the design process to be effective in the BIM have been identified. The BIM model and deliverables data used for the remodeling design process of building remodeling is the most effective way, due to the increased efficiency gained in many areas.

Approach of establishing As-Is BIM Model Process in Apartment Remodeling project using 3D Laser Scanning. (공동주택 리모델링 사업에서 3D 레이저스캐닝 기술을 활용한 기존 구조체 As-Is BIM모델 구축 프로세스 제안)

  • Park, Ji-Eun;Yu, Jung-Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 한국건축시공학회 2015년도 추계 학술논문 발표대회
    • /
    • pp.183-184
    • /
    • 2015
  • More than 50% of the existing buildings in Korea are over 15 years old. Therefore it is necessary to be held reconstruction or remodeling deteriorated buildings more efficiently. Especially, since remodeling project reserves existing structures, it requires less period of project and construction period compare to reconstruction. It is possible to minimize uncertainty in communication between participants and able to manage information and construct efficiently in remodeling projects. This paper is first step of integrated BIM-based whole lifecyle management of apartment remodeling process. It suggests 3D laser scanner specification factors and site constraint factors for mapping between two groups. Therefore it will contribute to develop mapping algorithm of two groups and find optimal combination for apartment remodeling.

  • PDF

Selection process of the optimal structural-reinforcement method in remodeling construction works (리모델링 프로젝트의 최적 구조보강방법 선정 프로세스)

  • Kim, Dong-Pil;Cho, Kyu-Man
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 한국건축시공학회 2014년도 춘계 학술논문 발표대회
    • /
    • pp.298-299
    • /
    • 2014
  • As a governmental plan for real estate revitalization, remodeling vertical extension has been permitted. Thus, the Ministry of Land, Infrastructure and Transport preannounced proclaiming the revised Housing Act and establishing the remodeling basic plan, and it is anticipated that the remodeling market will be revitalized in earnest after the enforcement of remodeling vertical extension(April 25th. 2014). As vertical extension is applicable up to 3 stories, the safety of building for remodeling is becoming important, so most remodeling construction works use various methods for structural reinforcement. In this process, the selection of structural reinforcement method has depended on structural engineer's experience and knowledge and there has been a limitation in selecting the optimum structural reinforcement method which considers remodeling project characteristics. Therefore, this study analyzed the factors to determine the kinds of structural reinforcement method in a remodeling project and suggested a process to select the best structural reinforcement method of remodeling construction.

  • PDF

Effect of Office Building Remodeling Project Characteristics on the Occurrence of Schedule Delay Risk Factors (오피스 리모델링 프로젝트 특성에 따른 공기지연 리스크 발생 영향도)

  • Cho, Kyuman;Kim, Taehoon
    • Korean Journal of Construction Engineering and Management
    • /
    • 제19권5호
    • /
    • pp.22-31
    • /
    • 2018
  • Due to the inherent risk factors of the remodeling projects, the remodeling project is failing frequently, and schedule delay are occurring in most remodeling projects. The risk factors that cause the delays in these remodeling projects are not common to all remodeling projects, and the likelihood of risk factors will be affected by the various characteristics of the project. In this context, based on the results of a reliable survey conducted on 29 construction managers who have performed remodeling projects, this research analyzes (1) "importance of each characteristic", which means how frequently the characteristics of the remodeling project affect the occurrence of risk factors, (2) "the likelihood of delay risk factors for remodeling projects", which assesses which risk factors are most likely to occur, and 3) "the level of effect of project characteristics that affects the occurrence of each risk factor." Through this study, the relationship between various characteristics of the office building remodeling projects and the delay risk factors was analyzed in various aspects, in further, it is expected that the owner planning the remodeling will be able to grasp the delay risk that is likely to occur according to the characteristics of the project in advance.

A Competitive Core Technology Proposal for a Remodeling Project (경쟁력 있는 리모델링 공사를 위한 요소기술 도출)

  • Han, Ju-Yeoun;Kim, Ki-Hyun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 한국건설관리학회 2008년도 정기학술발표대회 논문집
    • /
    • pp.785-789
    • /
    • 2008
  • As people pays more attention to remodeling as a method to effectively improve, maintain, and manage building properties, it is important to ensure the economic feasibility of remodeling compared to reconstruction, instead of focusing on systematic regulations. In order to identify core technologies, the study set criteria to survey cost of a remodeling project by analyzing current status of remodeling projects. Based on the criteria, the study calculated average construction cost for five remodeling projects that were conducted recently, compared the cost with new construction projects, and examined major level works that are essential in a remodeling project. Based on the major level works, the study conducted interviews with construction experts to draw core technologies in design, structure and construction of a remodeling project.

  • PDF