• 제목/요약/키워드: reliability cost evaluation

검색결과 271건 처리시간 0.025초

효율적 유지보수를 위한 도시철도 전동차 브레이크의 시스템 신뢰도 최적화 (Reliability Optimization of Urban Transit Brake System For Efficient Maintenance)

  • 배철호;김현준;이정환;김세훈;이호용;서명원
    • 대한기계학회논문집A
    • /
    • 제31권1호
    • /
    • pp.26-35
    • /
    • 2007
  • The vehicle of urban transit is a complex system that consists of various electric, electronic, and mechanical equipments, and the maintenance cost of this complex and large-scale system generally occupies sixty percent of the LCC (Life Cycle Cost). For reasonable establishing of maintenance strategies, safety security and cost limitation must be considered at the same time. The concept of system reliability has been introduced and optimized as the key of reasonable maintenance strategies. For optimization, three preceding studies were accomplished; standardizing a maintenance classification, constructing RBD (Reliability Block Diagram) of VVVF (Variable Voltage Variable Frequency) urban transit, and developing a web based reliability evaluation system. Historical maintenance data in terms of reliability index can be derived from the web based reliability evaluation system. In this paper, we propose applying inverse problem analysis method and hybrid neuro-genetic algorithm to system reliability optimization for using historical maintenance data in database of web based system. Feed-forward multi-layer neural networks trained by back propagation are used to find out the relationship between several component reliability (input) and system reliability (output) of structural system. The inverse problem can be formulated by using neural network. One of the neural network training algorithms, the back propagation algorithm, can attain stable and quick convergence during training process. Genetic algorithm is used to find the minimum square error.

초기 단계의 성능분포를 활용한 신뢰성 인증시험의 설계 (Design of Reliability Qualification Test Based on Performance Distribution at the Earlier Stage)

  • 정해성
    • 한국신뢰성학회지:신뢰성응용연구
    • /
    • 제12권3호
    • /
    • pp.131-138
    • /
    • 2012
  • A design of reliability qualification test based on performance distribution is developed. In general, the performance of an item degrades as the time goes by and the failure of an item occurs when the performance degradation reaches the pre-determined critical level. This article considers the reliability qualification test based on a more tightened critical value at the earlier stage to reduce the evaluation testing time and cost. A numerical example is provided to illustrate how to use the developed reliability qualification test.

R&D 사업의 경제적 파급효과 측정 - 산업측정 신뢰도 제고사업을 중심으로 - (Evaluating the economic impact of R&D investments - Improvement of measurement reliability -)

  • 최승일;김진호;조문재;황인극
    • 한국산학기술학회논문지
    • /
    • 제8권4호
    • /
    • pp.946-951
    • /
    • 2007
  • 산업 발전을 지원하는 연구개발 관련 기관들은 R&D 사업에 대한 경제적 근거를 요구받고 있다. 본 연구에서는 R&D 사업의 경제적 파급효과 측정을 위해 예측적 비용편익 분석 방법을 사용한다. 가상현실평가모형으로 비용과 편익을 추정하여 주요 계량적 측도를 계산하는데, 한국표준과학연구원 산업측정 신뢰도 제고사업의 세부과제 중 정량적 평가가 용이한 3개 과제에 대하여 예측적 비용-편익 분석 방법을 적용한다.

  • PDF

수용가용 전력저장시스템의 경제성분석에 관한 연구 (A Study on the Economic Analysis of the Energy Storage System in Customer)

  • 김정호;장준오
    • 신재생에너지
    • /
    • 제10권3호
    • /
    • pp.47-54
    • /
    • 2014
  • Recently, BESS is considered as one of essential countermeasure for demand side management. However, an economic evaluation is critical issue for the introduction of power system because the cost of BESS is very high in present stage. Therefor, this paper presents economic evaluation method for customer use case by considering peak shaving function based on the real time price. From the case study on the model power system and educational customer, it is confirmed that the proposed method is a practical tool for the economic analysis of BESS. and analytical approach for the reliability assessment in radially operated distribution systems. The approach can estimate the expected reliability performance of distribution systems by a direct assessment of the configuration of the systems using the reliability indexes such as NDP (Non-Delivery Power) and NDE (Non-Delivery Energy). The indexes can only consider the number and configuration of the load, but can not consider the characteristics of the load which is the one of the most important factor in the investment cost for the distribution systems. Therefore, this paper presents the new performance indexes for the investment of the distribution facilities considering both the expected interruption cost for the load section and the operation characteristics of Energy Storage System. The results from a case study show that the proposed methods can be a practical tool for the reliability management in distribution systems including Energy Storage System.

Monte Carlo법에 의한 복합전력계통의 유효부하지속곡선 작성법 및 개발 및 신뢰도 해석 (Development of the ELDC and Reliability Analysis of Composite Power System by Monte Carlo Method)

  • 문승필;최재석;신흥교;이순영;송길영
    • 대한전기학회논문지:전력기술부문A
    • /
    • 제48권5호
    • /
    • pp.508-516
    • /
    • 1999
  • This paper presents a method for constructing composite power system effective load duration curves(CMELDC) at load points by Monte Carlo method. The concept of effective load duration curves(ELDC) in power system planning is useful and important in both HLII. CMELDC can be obtained from convolution integral processing of the probability function of unsupplied power and the load duration curve at each load point. This concept is analogy to the ELEC in HLI. And, the reliability indices (LOLP, EDNS) for composite power system are evaluated using CMELDC. Differences in reliability levels between HLI and HLII come from considering with the uncertainty associated with the outages of the transmission system. It is expected that the CMELDC can be applied usefully to areas such as reliability evaluation, probabilistic production cost simulation and analytical outage cost assessment, etc. in HLII, DC load flow and Monte Carlo method are used for this study. The characteristics and effectiveness of thes methodology are illustrated by a case study of the IEEE RTS.

  • PDF

전압품질을 고려한 배전계통의 신뢰도 평가 (Reliability Evaluation for Considering the Voltage Quality in Power Distribution Systems)

  • 윤상윤;김언석;배주천;김낙경;박중신;김재철
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2000년도 하계학술대회 논문집 A
    • /
    • pp.525-527
    • /
    • 2000
  • This paper presents a reliability evaluation method for considering the voltage quality. The proposed evaluation methods are contained the sustained interruption, momentary interruption and voltage sag. For momentary interruption, evaluation indexes are divided the duration based index and the interruption cost index. For voltage sag, the final result of evaluation method represents the magnitude for customers' risk due to the voltage sag. The proposed method is tested using the RBTS model and a reliability data in KEPCO's system.

  • PDF

Minimum life-cycle cost design of ice-resistant offshore platforms

  • Li, Gang;Zhang, Da-Yong;Yue, Qian-Jin
    • Structural Engineering and Mechanics
    • /
    • 제31권1호
    • /
    • pp.11-24
    • /
    • 2009
  • In China, the oil and natural gas resources of Bohai Bay are mainly marginal oil fields. It is necessary to build both ice-resistant and economical offshore platforms. However, risk is involved in the design, construction, utilization, maintenance of offshore platforms as uncertain events may occur within the life-cycle of a platform under the extreme ice load. In this study, the optimum design model of the expected life-cycle cost for ice-resistant platforms based on cost-effectiveness criterion is proposed. Multiple performance demands of the structure, facilities and crew members, associated with the failure assessment criteria and evaluation functions of costs of construction, consequences of structural failure modes including damage, revenue loss, death and injury as well as discounting cost over time are considered. An efficient approximate method of the global reliability analysis for the offshore platforms is provided, which converts the implicit nonlinear performance function in the conventional reliability analysis to linear explicit one. The proposed life-cycle optimum design formula are applied to a typical ice-resistant platform in Bohai Bay, and the results demonstrate that the life-cycle cost-effective optimum design model is more rational compared to the conventional design.

거시적인 접근방법을 통한 공급지장비 추정에 관한 연구 (A Study on the Outage Cost Assessment by using Macro Approach)

  • 박영신;전동훈;박정제;오태곤;조경희;최재석
    • 전기학회논문지
    • /
    • 제59권10호
    • /
    • pp.1703-1711
    • /
    • 2010
  • Electric power utilities are facing increasing uncertainties regarding the economic, political, societal, environmental constraints under they operate and plan their future systems. The utilities have to integrate consumers' interruption cost representing reliability worth of electricity into the process of determining the optimum investment level. In order to do so, the estimated outage cost must be included into quantitative index corresponding to system capital and operation investment cost to establish an optimal expansion plan. This paper is a study on the outage cost assessment by using macro approach for calculating IEAR(Interrupted Energy Assessment Rates) and the TRELSS(Transmission Reliability Evaluation for Large-Scale Systems) program was used to calculate EENS(Expected Energy Not Served).

Assessment of Reliability in the Distribution System of an Industrial Complex

  • Choi, Sang-Bong
    • Journal of Electrical Engineering and Technology
    • /
    • 제2권2호
    • /
    • pp.201-207
    • /
    • 2007
  • As the power industry moves towards open competition, there has been a need for methodology to evaluate distribution power system reliability by using customer interruption costs, particularly in power supply zones under the competitive electricity market. This paper presents an algorithm to evaluate system average interruption duration index, expected energy not supplied, and system outage cost taking into consideration failure rate of the distribution facility and industrial customer interruption cost. Also, to apply this algorithm to evaluate system outage cost presented in this paper, the distribution arrangement of a dual supply system consisting of mostly high voltage customers in an industrial complex in Korea is used as a sample case study. Finally, evaluation results of system interruption cost, system average interruption duration index, and expected energy not supplied in the sample industrial complex area are shown in detail.

8200호대 전기기관차용 기존품 보조전원장치의 수명주기비용 평가에 관한 연구 (A Study on the Life Cycle Cost Evaluation of the Conventional Auxiliary Power Unit for 8200 Series Electric Locomotive)

  • 이계승;김완일;김재문
    • 전기학회논문지
    • /
    • 제67권2호
    • /
    • pp.331-336
    • /
    • 2018
  • In this paper, the life cycle cost of the auxiliary power unit in the conventional 8200 series electric locomotive is evaluated and an effective life cycle cost reduction method is sought. For this, a life cycle cost evaluation model was proposed using IEC 60300-3-3 standard. As a result of analysis, material cost which accounted for a large percentage of preventive maintenance cost, accounted for 64% of total cost, and breakdown maintenance cost was as high as 27%. Except for the cost of preventive maintenance, the breakdown maintenance cost ratio was the highest. In order to reduce the LCC of the auxiliary power unit(APU) of the 8200 series in the future, it is necessary to reduce the material cost in case of development and to secure the high reliability according to the parts manufacturing so as to minimize the maintenance cost.