• Title/Summary/Keyword: reliability cost evaluation

Search Result 271, Processing Time 0.029 seconds

Existing test data for the Act on Registration & Evaluation, etc. of Chemical Substances

  • Choi, Bong-In;Ryu, Byung-Taek;Na, Suk-Hyun;Chung, Seon-Yong
    • Environmental Analysis Health and Toxicology
    • /
    • v.30
    • /
    • pp.17.1-17.6
    • /
    • 2015
  • Objectives In this study, the possibility of using existing test data provided in Korea and elsewhere for the registration of chemical substances was examined. Data on 510 chemical substances that are among the first subject to registration under the "Act on the Registration and Evaluation, etc. of Chemical Substances (K-REACH)" were analyzed. Methods The possibility of using existing data from 16 reference databases was examined for 510 chemical substances notified in July 2015 as being subject to registration. Results Test data with the reliability required for the registration of chemical substances under the K-REACH constituted 48.4% of the required physicochemical characteristics, 6.5% of the required health hazards, and 9.4% of the required environmental hazards. Conclusions Some existing test data were not within the scope of this research, including data used for registration in the European Union (EU). Thus, considering that 350 of these 510 species are registered in EU Registration, Evaluation, Authorisation & Restriction of Chemicals, more test data may exist that can be utilized in addition to the data identified in this study. Furthermore, the K-REACH states that non-testing data (test results predicted through Read Across, Quantitative Structure-Activity Relationships) and the weight of evidence (test results predicted based on test data with low reliability) can also be utilized for registration data. Therefore, if methods for using such data were actively reviewed, it would be possible to reduce the cost of securing test data required for the registration of chemical substances.

Development of the Road Profiling System and Evaluation of Korean Roads Roughness Characteristics (도로면 측정 분석 시스템 개발 및 국내 도로면 특성평가 응용 연구)

  • 손성효;허승진
    • Transactions of the Korean Society of Automotive Engineers
    • /
    • v.11 no.3
    • /
    • pp.192-197
    • /
    • 2003
  • The ‘AEIPR’(Accelerometer Established Inertial Profiling Reference) method has been applied to measure the road profile. The dynamic road profiling method using AEIPR has the advantages of cost effectiveness, measuring speed and relatively high reliability. However, it is required to improve the double integration algorithm to get the measurement results with the accuracy of hither level. In the first part of this paper, the effective double integration algorithm is suggested and the ‘Road Profiler’ software is developed on the basis of the algorithm. Road profiling tests are performed using the developed ‘Road Profiler’ system on the specially designed tracks for the durability tests and the various types of pubic roads. Test results are shown and evaluated by the international road evaluation indicies and classification.

Empirical Evaluation of Wireless Mesh Networks for Construction IT in Tunnel Environments (건설-IT융합 기술을 위한 터널 환경에서 무선 메쉬 네트워크를 이용한 실험적 성능 검증)

  • Yang, Chang-Mo;Lee, Seung-Beom;Choi, Soo-Hwan;Eom, Doo-Seop
    • Journal of Information Technology Services
    • /
    • v.10 no.2
    • /
    • pp.271-279
    • /
    • 2011
  • This paper draws performance results through comparing WMNs' methods when the WMNs are used in tunnel construction sites. There are many advantages of WMNs : lower cost, easy to network maintenance, robustness and reliability within RF-ranges. As a result, using the WMNs would be suitable to employ as a network infrastructure for the construction sites. This paper evaluates the performance of WMNs which we have installed in a tunnel construction. Through the performance results, we conclude the performance of data throughputs gets lower when we perform the network in tunnel environments. We make attempts WMNs' two major methods which are SISC(Single Interface with Single Channel) and MIMC(Multi Interface with Multi Channel) to figure out which method will be better for the construction sites. Through the experiments, the WMN based on the MIMC method was comparatively suitable in network performance aspect for the tunnel Sites.

A Study on the Government's Investment Priorities for Building a Supercomputer Joint Utilization System

  • Hyungwook Shim;Jaegyoon Hahm
    • Asian Journal of Innovation and Policy
    • /
    • v.12 no.2
    • /
    • pp.200-215
    • /
    • 2023
  • The purpose of this paper is to analyze the Korean government's investment priorities for the establishment of a supercomputer joint utilization system using AHP. The AHP model was designed as a two-layered structure consisting of two areas of specialized infrastructure, a one-stop joint utilization system service, and four evaluation items for detailed tasks. For the weight of each evaluation item, a cost efficiency index considering the annual budget was developed for the first time and applied to the weight calculation process. AHP analysis conducted a survey targeting supercomputer experts and derived priorities with 22 data that had completed reliability verification. As a result of the analysis, the government's investment priority was high in the order of dividing infrastructure for each Specialized Center and building resources in stages. In the future, the analysis results will be used to select economic promotion plans and prepare strategies for the establishment of the government's supercomputer joint utilization system.

Comparative Study on the Performance of Finite Failure NHPP Software Development Cost Model Based on Inverse-type Life Distribution (Inverse-type 수명분포에 근거한 유한고장 NHPP 소프트웨어 개발비용 모형의 성능에 관한 비교 연구)

  • Seung-Kyu Park
    • The Journal of the Korea institute of electronic communication sciences
    • /
    • v.18 no.5
    • /
    • pp.935-944
    • /
    • 2023
  • In this study, the Inverse-type (: Inverse-Exponential, Inverse-Rayleigh) life distribution, which is known to be suitable for reliability research, was applied to a software development cost model based on finite failure NHPP(: Nonhomogeneous Poisson Process), and then the attributes that determine the model's performance were analyzed. Additionally, to evaluate the efficiency of the model, it was compared with the Goel-Okumoto basic model. The performance of the model was analyzed using failure time data, and MLE (: Maximum Likelihood Estimation) was applied to calculate the parameters. In conclusion, first, as a result of analyzing m(t), which determines the development cost, the Inverse-Exponential model was efficient due to its small error in the true value. Second, as a result of analyzing the release time along with the development cost, the Inverse-Rayleigh model was confirmed to be the best. Third, as a result of comprehensive evaluation of the attributes (m(t), cost, and release time) of the proposed model, the Inverse-Rayleigh model had the best performance. Therefore, if software developers can effectively utilize this research data in the early process, they will be able to proactively explore and analyze attributes that affect cost.

Evaluation Method Using Analytic Hierarchy Process for C4I SW Secure Coding Rule Selection (계층분석기법을 활용한 전장관리정보체계 소프트웨어 시큐어 코딩룰 선정 평가 방안)

  • Choi, June-Sung;Kim, Woo-Je;Park, Won-Hyung;Kook, Kwang-Ho
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.38C no.8
    • /
    • pp.651-662
    • /
    • 2013
  • In this study, we suggest the selecting evaluation method considering 6 major factors like Compliance system application (Development language conformance, Platform Compliance), threat evaluation (criticality of security incident, possibility of security incident), application benefit (Reliability / quality improvement, Modify Cost) for appropriate secure coding rule selecting evaluation. Using this method, we selected and make a set consist of 197 secure coding rules for Battlefield Management System Software. And calculated the application priority for each rules.

Draft Guideline Matching the Treatment Technology to the Soil Contaminated Site Based on the Site Properties in Korea (국내 부지 특성을 고려한 오염토양 정화기술매칭기준안)

  • Lee, Jae-young;Lee, Minhee;Yu, Mokryun
    • Journal of Soil and Groundwater Environment
    • /
    • v.21 no.6
    • /
    • pp.1-13
    • /
    • 2016
  • The programmable logic array to match the treatment technology to the soil contaminated site based on the site properties in Korea was developed. Based on the previous technology screening system of FRTR (Federal Remediation Technology Roundtable) in USA, total 9 evaluation factors indicating the site characteristics were used for the technology matching process and 8 factors among them were quantitatively weighed in the order of importance. The class interval for each evaluation factor was linearly distributed to give the weighed score and 8 scores were summed up to prioritize the treatment technology. The optimal treatment technology for a specific site was determined according to the total score acquired from 8 evaluation factors used in this technology matching process. The reliability test for the developed technology matching system was done by using information of two real cleanup sites in Korea, suggesting that this guideline will be available to determine the most effective treatment technology to cleanup the soil contaminated site and also to assist the government or the company to design a successful and cost-effective site cleanup plan in Korea.

Mechanical Reliability Evaluation on Solder Joint of CCB for Compact Advanced Satellite (Sherlock을 활용한 차세대 중형위성용 CCB 솔더 접합부의 기계적 신뢰성 평가)

  • Jeon, Young-Hyeon;Kim, Hyun-Soo;Lim, In-Ok;Kim, Youngsun;Oh, Hyun-Ung
    • Journal of the Korean Society for Aeronautical & Space Sciences
    • /
    • v.45 no.6
    • /
    • pp.498-507
    • /
    • 2017
  • Electronic equipments comprised of high density components with various packaging types have been recently applied to a satellite. Therefore, to guarantee high reliability of electrical equipment, a design approach, which can reduce the development period and cost through an early diagnosis in potential risks of failure, should be established. In the previous research, the reliability assesment of the electronic equipments have based on Steinberg's fatigue failure theory. However, this theory was not enough for further investigation of life prediction and reliability of the electronic equipments comprised of various sizes and packaging types due to its theoretical limitations and analysis results sensitivity with regard to different modeling technic. In that case, if detailed finite element model is established, aforementioned problems can be readily solved. However, this approach might arise disadvantage of spending much time. In this paper, to establish strategy for high reliability design of electronic equipment, we performed mechanical reliability evaluation of CCB (Camera Controller Box) at qualification level based on the approach using Sherlock unlike design techniques applied to existing business.

On Improving the Test and Evaluation Process by Incorporating the RAMS and Risk Management Processes (무기체계 개발에서 RAMS 및 위험 관리를 통한 시험평가 프로세스의 개선에 관한 연구)

  • Shin, Young-Don;Sim, Sang-Hyun;Lee, Jae-Chon
    • Journal of the Korea Safety Management & Science
    • /
    • v.16 no.2
    • /
    • pp.31-42
    • /
    • 2014
  • As weapon systems become complex in terms of the scale and functionality, the required time to complete the test and evaluation (T&E) process is inevitably getting longer. However, nowadays the reduction of T&E period becomes one of the core targets in the weapon systems acquisition programs. This is because the reduced time for T&E process can yield the reduction of defense budget and also faster deployment of the weapon systems, thereby having a competitive edge over rival countries. On the other hand, in weapon systems development the management of reliability, availability, maintainability and safety (RAMS), and risk is considered important to keep competitiveness and thus has been carried out separately. Thus, the objective of this paper is to study on improving the T&E process by integrating the RAMS and risk management process in it. To do so, the related processes are analyzed and modeled first. Then an integrated process model is developed. The resulting model is equipped with the traceability among the data and interfaces that are generated from the T&E and RAMS/risk processes. As a case study, the model developed is applied in tanks development. The effective use of the traceability is expected to reduce the time and cost required to complete T&E process.

Development of Overload Evaluation System of Distribution Transformers using Real-Time Monitoring (실시간 감시를 이용한 배전용변압기 과부하 평가 시스템 개발)

  • Park, Chang-Ho;Yun, Sang-Yun
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.59 no.10
    • /
    • pp.1741-1747
    • /
    • 2010
  • The development of overload management systems for distribution transformers offers new opportunities for improving the reliability of distribution systems. It allows network planners to optimize the system resource utilization and investment cost. Such an improvement in the flexibility of the distribution network is only possible if the operator has more accurate knowledge of the realtime conditions of distribution transformers. In this paper, we present an improved overload decision system for distribution transformers using realtime monitoring data. Our study can be categorized into two parts: (a) improvement in the criteria for judging the overload conditions of distribution transformers and (b) development of an overload evaluation system using realtime monitoring data. In order to determine the overload criteria, overload experiments are performed on sample transformers; the results of these experiments are used to define the relationship between the transformer overload and the increase in the top-oil temperature. To verify the accuracy of the experimental results, field tests are performed using specially manufactured transformers, the loads and top-oil temperatures of which can be measured. For arriving at online overload decisions, we propose methods whereby the measured load curve can be converted into an overload characteristic curve and the overload time can be calculated for any load condition. The developed system is able to evaluate the overload for individual distribution transformers and calculate the losses using realtime monitoring data.