Park, Byung-Seok;Ahn, Sung-Joon;Jang, Moon-Jong;Woo, Hee-Gon
Journal of Institute of Control, Robotics and Systems
/
v.6
no.3
/
pp.284-290
/
2000
The measurement of electric current using optical techniques provides a number of important practical advantages including effective isolation from high line potentials and freedom from the saturation effects observed in conventional current transformers. In this work the optical current sensor which uses thin YIG(Yittrium Ion Garnet) film as a Faraday element has been developed. We have characterized this optical current sensor and implemented it to the OOCR(Opto-electronic OverCurrent Realy) Performance of the OOCR shows the possibility of replacing the present overcurrent relays with OOCR.
KSII Transactions on Internet and Information Systems (TIIS)
/
v.9
no.1
/
pp.50-67
/
2015
The Cognitive Radio (CR) paradigm in tactical ad hoc networks is an important element of future military communications for network-centric warfare. This paper presents a novel Cognitive Link State Routing protocol for CR-based tactical ad hoc networks. The proposed scheme provides prompt and reliable routes for Primary User (PU) activity through procedures that incorporate two main functions: PU-aware power adaptation and channel switching. For the PU-aware power adaptation, closer multipoint relay nodes are selected to prevent network partition and ensure successful PU communication. The PU-aware channel switching is proactively conducted using control messages to switch to a new available channel based on a common channel list. Our simulation study based on the ns-3 simulator demonstrates that the proposed routing scheme delivers significantly improved performance in terms of average end-to-end delay, jitter, and packet delivery ratio.
The Transactions of The Korean Institute of Electrical Engineers
/
v.61
no.3
/
pp.491-496
/
2012
There are several protective relays used to protect DC traction power supply system for DC railway. These relays, however, are made by different manufactures and they have different ways for their operations. Therefore, there are difficulties for cooperation between the devices or the devices and an upper system. In order to increase interoperability and stability of the system composed of devices made by different manufactures, IEC 61850 international standards are applied to design logical nodes for modeling protective elements used in protective relays.
The Transactions of The Korean Institute of Electrical Engineers
/
v.65
no.12
/
pp.1979-1985
/
2016
A protection algorithm using a voltage-controlled overcurrent element for a looped collection circuit in a wind farm is suggested in this paper. Because the proposed algorithm uses voltage relaying signals as well as current relaying signals, any fault in the looped collection circuit can be cleared by voltage-controlled overcurrent relays located at the two adjacent relaying points, the nearest place in each direction from the fault point. The algorithm can also distinguish the external faults which occur at the outside of a wind farm from the internal faults. It means that the proposed algorithm can provide the proper ability of protection coordination to the relays in the looped collection circuits of a large wind farm. The performance of the proposed algorithm is verified under various fault conditions using PSCAD/EMTDC simulations.
KSII Transactions on Internet and Information Systems (TIIS)
/
v.13
no.1
/
pp.52-68
/
2019
Aiming at the optimal placement of communication relay nodes (OPCRN) problem in manned/unmanned aerial vehicle cooperative engagement system, this paper designed a kind of fully connected broadband backbone communication topology. Firstly, problem description of OPCRN was given. Secondly, based on problem analysis, the element attributes and decision variables were defined, and a bi-level programming model including physical layer and logical layer was established. Thirdly, a hierarchical artificial bee colony (HABC) algorithm was adopted to solve the model. Finally, multiple sets of simulation experiments were carried out to prove the effectiveness and superiority of the algorithm.
To restrain abnormal voltage and effective operation in protect system, some of customer in Korea earth their own transformer in 154kV power system. The above ground system has some problems if ground fault occurs in other related area such as ground relay errors, under count register in two element register system. There for most huge customers opens the ground neutral and it causes errors in insulate and protection coordination and register system. In this paper presents the solution for above system.
The Transactions of the Korean Institute of Electrical Engineers
/
v.39
no.5
/
pp.485-493
/
1990
The idea of expert control is to incorporate a rule based expert system in a feedback control system. In this paper, we present some heuristic rules based on relay experiment for the choice of controller structure and the setting of the controller parameters. Heuristic rules are used as an element of the feedback loop in an auto-tuning PID controller. The algorithms are coded in a form which is as pure as possible and the heuristic logic is implemented with the rules. This paper reports an implementation of an expert controller on microcomputer-based system, including an industrial programmable controller.
The Transactions of the Korean Institute of Electrical Engineers D
/
v.51
no.12
/
pp.542-548
/
2002
We consider an unknown linear time invariant plan with static load disturbance. A saturation function nonlinear element is sued to find th one point information in the frequency domain. We analyze an asymmetric self-oscillation caused by static load disturbance with relay feedback and saturation function feedback. We propose a new method to tune a PID controller using a saturation nonlinear feedback element in the presence of asymmetric oscillation. The proposed method does not require the knowledge of plant d.c. gain with an asymmetric oscillation in the plat output.
This paper describes the results of a study for the system characteristics, especislly for the abnormal frequency drop of power system, when a large generation unit such as Kori Nuclear 1 (595MW) pulls out from the system. The automatic load shedding method now adopted in our system was re-studied to ameliorate the above problem. From the results of the study, a new under-frequency relay with an element for detecting the slope of frequency change and with time delay element to raise the lowered frequency to a desired value, was found to be effective, and should be purchased and utilized. By this study, an optimal and concrete load shedding method was recommended for reliable operation of power system.
Proceedings of the Korean Institute of Information and Commucation Sciences Conference
/
2009.10a
/
pp.461-464
/
2009
The conventional electro-mechanical circuit break and relay are widely used in large-sized DC power system. However, recently due to high reliability, remote controllability and small power dissipation of a RSPC (Remote Solid State Power Controller), high-friendly DC power systems have increasingly adopted the RSPC as an essential element. In this paper, we have conducted the modeling of a RSPC circuit and the simulation analysis for $I^2t$ curve, respectively.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.