• 제목/요약/키워드: relative L-order

검색결과 256건 처리시간 0.03초

RELATIVE (p, q, t)L-TH ORDER AND RELATIVE (p, q, t)L-TH TYPE BASED SOME GROWTH ASPECTS OF COMPOSITE ENTIRE AND MEROMORPHIC FUNCTIONS

  • Biswas, Tanmay
    • 호남수학학술지
    • /
    • 제41권3호
    • /
    • pp.463-487
    • /
    • 2019
  • In the paper we establish some new results depending on the comparative growth properties of composite entire and meromorphic functions using relative (p, q, t)L-th order and relative (p, q, t)L-th type of entire and meromorphic function with respect to another entire function.

RELATIVE (p, q, t)L-TH TYPE AND RELATIVE (p, q, t)L-TH WEAK TYPE ORIENTED GROWTH PROPERTIES OF WRONSKIAN

  • Biswas, Tanmay;Biswas, Chinmay
    • 한국수학교육학회지시리즈B:순수및응용수학
    • /
    • 제29권1호
    • /
    • pp.69-91
    • /
    • 2022
  • In the paper we establish some new results depending on the comparative growth properties of composite transcendental entire and meromorphic functions using relative (p, q, t)L-th order, relative (p, q, t)L-th type and relative (p, q, t)L-th weak type and that of Wronskian generated by one of the factors.

COMPARATIVE GROWTH ANALYSIS OF DIFFERENTIAL MONOMIALS AND DIFFERENTIAL POLYNOMIALS DEPENDING ON THEIR RELATIVE pL* - ORDERS

  • Biswas, Tanmay
    • 충청수학회지
    • /
    • 제31권1호
    • /
    • pp.103-130
    • /
    • 2018
  • In the paper we establish some new results depending on the comparative growth properties of composite entire and meromorphic functions using relative $_pL^*-order$, relative $_pL^*-lower$ order and differential monomials, differential polynomials generated by one of the factors.

SOME RESULTS RELATING TO SUM AND PRODUCT THEOREMS OF RELATIVE (p, q, t) L-TH ORDER AND RELATIVE (p, q, t) L-TH TYPE OF ENTIRE FUNCTIONS

  • Biswas, Tanmay
    • Korean Journal of Mathematics
    • /
    • 제26권2호
    • /
    • pp.215-269
    • /
    • 2018
  • Orders and types of entire functions have been actively investigated by many authors. In this paper, we investigate some basic properties in connection with sum and product of relative (p, q, t) L-th order, relative (p, q, t) L-th type, and relative (p, q, t) L-th weak type of entire functions with respect to another entire function where $p,q{\in}{\mathbb{N}}$ and $t{\in}{\mathbb{N}}{\cup}\{-1,0\}$.

SLOWLY CHANGING FUNCTION ORIENTED GROWTH MEASUREMENT OF DIFFERENTIAL POLYNOMIAL AND DIFFERENTIAL MONOMIAL

  • Biswas, Tanmay
    • Korean Journal of Mathematics
    • /
    • 제27권1호
    • /
    • pp.17-51
    • /
    • 2019
  • In the paper we establish some new results depending on the comparative growth properties of composite entire and meromorphic functions using relative $_pL^*$-order, relative $_pL^*$-lower order and differential monomials, differential polynomials generated by one of the factors.

LH-모멘트의 적정 차수 결정에 의한 설계홍수량 추정(II) (Estimation of Design Flood by the Determination of Best Fitting Order of LH-Moments(II))

  • 맹승진;이순혁
    • 한국농공학회지
    • /
    • 제45권1호
    • /
    • pp.33-44
    • /
    • 2003
  • This study was conducted to estimate the design flood by the determination of best fitting order for LH-moments of the annual maximum series at fifteen watersheds. Using the LH-moment ratios and Kolmogorov-Smirnov test, the optimal regional probability distribution was identified to be the Generalized Extreme Value (GEV) in the first report of this project. Parameters of GEV distribution and flood flows of return period n years were derived by the methods of L, L1, L2, L3 and L4-moments. Frequency analysis of flood flow data generated by Monte Carlo simulation was performed by the methods of L, L1, L2, L3 and L4-moments using GEV distribution. Relative Root Mean Square Error. (RRMSE), Relative Bias (RBIAS) and Relative Efficiency (RE.) using methods of L, Ll , L2, L3 and L4-moments for GEV distribution were computed and compared with those resulting from Monte Carlo simulation. At almost all of the watersheds, the more the order of LH-moments and the return periods increased, the more RE became, while the less RRMSE and RBIAS became. The Absolute Relative Reduction (ARR) for the design flood was computed. The more the order of LH-moments increased, the less ARR of all applied watershed became It was confirmed that confidence efficiency of estimated design flood was increased as the order of LH-moments increased. Consequently, design floods for the appled watersheds were derived by the methods of L3 and L4-moments among LH-moments in view of high confidence efficiency.

LH-모멘트의 차수에 따른 설계홍수량 추정 (Estimation of Design Flood by the Determination of Best Fitting Order for LH-Moments)

  • 맹승진;이순혁
    • 한국농공학회:학술대회논문집
    • /
    • 한국농공학회 2002년도 학술발표회 발표논문집
    • /
    • pp.233-236
    • /
    • 2002
  • This study was conducted to estimate the design flood by the determination of best fitting order for LH-moments of the annual maximum series at fifteen watersheds. Parameters of GEV distribution and flood flows of return period n years were derived by the methods of L, L1, L2, L3 and L4-moments. Frequency analysis of flood flow data generated by Monte Carlo simulation was performed by the methods of L, L1, L2, L3 and L4-moments using GEV distribution. Relative Root Mean Square Error (RRMSE), Relative Bias (RBIAS) and Relative Efficiency (RE) using methods of L, L1, L2, L3 and L4-moments for GEV distribution were computed and compared with those resulting from Monte Carlo simulation. At almost all of the watersheds, the more the order of LH-moments and the return periods increased, the more RE became, while the less RRMSE and RBIAS became. Consequently, design floods for the applied watersheds were derived by the methods of L3 and L4-moments among LH-moments in view of high confidence efficiency.

  • PDF

몸통 운동시 지향각(Orientation angles)을 이용한 허리 근육의 3차원 위치 좌표 추정 기법 (The method to estimate 3-D coordinates of lower trunk muscles using orientation angles during a motion)

  • 임영태
    • 한국운동역학회지
    • /
    • 제12권1호
    • /
    • pp.125-133
    • /
    • 2002
  • The purpose of this study was to develop a method for estimating 3-D coordinates of lower trunk muscles using orientation angles during a motion. Traditional 3-D motion analysis system with DLT technique was used to track down the locations of eight reference markers which were attached on the back of the subject. In order to estimate the orientations of individual lumbar vertebrae and musculoskeletal parameters of the lower trunk muscle, the rotation matrix of the middle trunk reference frame relative to the lower trunk reference frame was determined and the angular locations of individual lumbar vertebrae were estimated by partitioning the orientation angles (Cardan angles) that represent the relative angles between the rotations of the middle and lower trunks. When the orientation angles of individual intervertebral joints were known at a given instant, the instantaneous coordinates of the origin and insertion for all selected muscles relative to the L5 local reference frame were obtained by applying the transformation matrix to the original coordinates which were relative to a local reference frame (S1, L4, L3, L2, or L1) in a rotation sequence about the Z-, X- and Y-axes. The multiplication of transformation matrices was performed to estimate the geometry and kinematics of all selected muscles. The time histories of the 3-D coordinates of the origin and insertion of all selected muscles relative to the center of the L4-L5 motion segment were determined for each trial.