Analysis on the Safety of Structure and Economics of Replacement Method Using Rock Debris in the Soft Ground - Case Study of Miho Stream Crossing Road in Cheongju City (연약지반 암버럭 치환공법의 구조물 안정성과 경제성 분석 - 청주시 미호천 횡단도로를 대상으로)

  • Heo, Kang Kug;Park, Hyung Keun;Ahn, Byung Chul;Min, Byeong Uk
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.36 no.4
    • /
    • pp.705-713
    • /
    • 2016
  • For the soft ground construction, the factors not considered in the design stage occurs in the construction stage so that they cause the increase of the construction cost due to the structural stability and the design change. The subject of the study is the construction section of the industrial complex access road made in the Ochang region of Chungcheongbuk-do. The study is concerned with selecting the soft ground handling method such as the replacement method using rock debris and the surcharge reflecting the service load as the soft ground handling measure and analyzing the effect of reducing the construction cost with the stability of structures and the reduction of the construction period. The soft ground in the study section consists of sandy and cohesive soil and is 2.4m to 5.5m deep. It is distributed unevenly between the 1.5m to 5.9m stratums under the ground surface. Settlement is not serious, but the future uneven settlement and difference are expected so that the future settlement behavior is estimated by analyzing the site measurement results after the soft ground treatment. Moreover, in consideration of the regional characteristics and economic efficiency, soil with good quality is replaced with rock debris as the replacement material so that 29% of the construction cost is reduced due to the increase of stability and the reduction of duration. If the estimation of the dispersion of the pore water pressure within the dam body and the change of the underground water level and the relation of the actually measured soft ground with consolidation is studied further on the basis of the study, it is expected that the behavior of the soft ground will be correctly estimated in various site conditions.

A Earth-Volume Estimate Model by System Dynamics (시스템 다이내믹스를 활용한 토공량 산정 모형 구축)

  • Hwang, Young-Jo;Won, Seo-Kyung;Han, Choong-Hee;Kim, Sun-Kuk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.467-470
    • /
    • 2006
  • The earth volume which is the basis of all the construction has gone through great development so far with the use of construction machine; however, systematic studies on the related area is in need since the appropriate compound engineering method of earth volume equipments which is a key factor for shortening the project duration and cost reduction is not systematically established and it is dependent on experience. Reasonable mechanical earth volume should take into consideration of performance and characteristics of the equipment, the kind of project, scale and conditions in advance. Also, the optimum compound engineering should be planned by selecting several available scales of equipment. In this study, the earth volume estimate model is established for optimum compound engineering of earth volume equipment for mechanized earth volume equipment loading and moving stage among many stages of earth volume task using system dynamics technique. The optimum compound engineering model of the earth volume equipment produced as a result of this is expected to make reasonable decisions in the shortest time in selecting earth volume facility.

  • PDF

Estimation of Areal Reduction Factors for the Youngsan River Basin (영산강유역의 면적우량감소계수 산정)

  • Lee, Jae-Hyung;Koh, Won-Joon;Lee, Yoon-Young;Kim, Dae-Geun
    • Journal of Korea Water Resources Association
    • /
    • v.39 no.10 s.171
    • /
    • pp.813-822
    • /
    • 2006
  • By analyzing the concurrent rainfall data from rainfall gauges positioned in the Youngsan River basin, the areal reduction factors related to the rainfall characteristics of the Youngsan River basin are estimated. The estimated values are compared with the values of the Han River basin, and show that the rate of decrease of the areal reduction factors of the Youngsan River basin are smaller than those of the Han River basin as the basin area is increasing. That is especially true for short-term duration storm events. These findings reveal that the spatial variations in the Youngsan River basin's storms are smaller than the spatial variations of the storms In the Han River basin, due to the size of the two basin areas in addition to the topological characteristics that affect the rainfall distributions.

A Study on the Establishment of Housing Performance Criteria for Modular Building (모듈러 건축물의 거주환경 성능기준 설정에 관한 연구;음환경 성능을 중심으로)

  • Ko, Kwang-Il;Kim, Yong-In;Lee, Chan-Sik
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.628-631
    • /
    • 2006
  • Modular Construction is a method, which factory-produced units are transferred to on-site and assembled to form complete buildings. It is expected that its demand will increase gradually. Because it has some advantages such as duration reduction, movement, reuse and environmental friendliness etc. For the Modular Construction to be introduced and applied, we needs the objective and reasonable performance criteria. This study presents the acoustic performance criteria of the modular building. For this one, this paper reviews legal standard related to performance, analyzes the performance evaluation and survey on pilot projects. The presented performance criteria can be specifically asked the demand by owner in a design guideline. In addition, it makes designer and general contractor accomplish target performance. Eventually, it can improve the performance of Modular Building.

  • PDF

Impact Analysis of Construction of Small Wastewater Treatment Plant Under Climate Change (기후변화를 고려한 소규모 하수처리장 건설에 대한 영향 분석)

  • Park, Kyungshin;Chung, Eun-Sung;Kim, Sang-Ug;Lee, Kil Seong
    • Journal of Korean Society on Water Environment
    • /
    • v.26 no.2
    • /
    • pp.268-278
    • /
    • 2010
  • This study derived the effectiveness analysis results of construction of wastewater treatment plant under climate change scenarios. Canadian Global Coupled Model (CGCM3) was used and A1B and A2 of Special Report on Emission Scenario (SRES) were selected. Regional climate change data for this application were downscaled by using Statistical Downscaling Model (SDSM) and the flow and BOD concentration durations were obtained by using Hydrological Simulation Program - Fortran (HSPF). The criteria for low flow and water quality were chosen as $Q_{99}$, $Q_{95}$, $Q_{90}$ and $C_{30}$, $C_{10}$, $C_1$. The numbers of days to satisfy the instreamflow requirements and target BOD concentration were also added to the criteria for comparison. As a results, small wastewater treatment plant improved the water cycle due to the increase of low flow and the decrease of BOD concentration. But climate change affected the reduction of effectiveness significantly. Especially in case of construction of small waste water treatment plant in the upstream region, it is necessary to take climate change impact into consideration since it is usually related to the low flow and the water quality of the stream.

A Case Study of the Improvement of the Structural Work of a Logistics Facility by Using PC Member (PC부재에 의한 물류시설의 골조공사 개선사례 연구)

  • Kim, Seon-Hyung;Choi, Eun-Gyu;Kim, Sun-Kuk;Lee, Sung-Ho
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.6
    • /
    • pp.127-135
    • /
    • 2010
  • As logistics facilities have a high ceiling height, simple structure, and the need for a quick return on investment, it is usually essential to advance the construction schedule of such facilities. Accordingly, PC structures, which require less labor, cost and schedule, can be more competitive than RC structures. However, most construction companies in Korea are familiar with RC structure design, have negative perceptions regarding PC structures, and do not sufficiently adopt new construction techniques. The structure that this research features has 110 columns that are 14 m high and are built to the same specification, and applying an RC design to the structure will lead to issues related to constructibility, economic viability, project duration and safety. Therefore, this study intends to feature PC design as an alternative to the RC warehouse design, and perform a comparative analysis of the reduction in labor, cost and construction schedule to highlight benefits. The research outcomes herein will provide inputs to subsequent studies on new construction strategies to advance the construction schedule, improve quality and constructibility, enhance safety and save costs.

Indoor Air Quality Evaluation of Commercial Urban Regeneration Modular Structure According to Space Usage (상업용 도시재생 모듈러 건축물의 공간이용에 따른 실내공기질 평가)

  • Nam, So-Jeong;Kim, Sea-Ryon;Pyung, Woo-Jin;Kang, Yujin;Kim, Sumin
    • Journal of the Korea Furniture Society
    • /
    • v.27 no.3
    • /
    • pp.246-252
    • /
    • 2016
  • From 2000s, modular construction has gained more attention due to many advantages such as reduction of duration, recycling. The modular structure is being used for urban regeneration recently. However, even though most facilities in the modular structures which are used as urban regeneration building are commercial spaces, exhibition spaces, eating and drinking spaces, there are lack of natural or mechanical ventilation systems. Also, there are relatively limited spaces on modular structure characteristic. Therefore, indoor environment performance of four buildings, which are performed as urban regeneration in Seoul, was evaluated by HCHO and $CO_2$ emissions. Consequently, the HCHO and $CO_2$ emissions of the commercial and exhibition spaces were confirmed that can influence on health of occupants. Therefore, the urban regeneration modular structure needs to add local ventilation systems for improvement of indoor air quality to more healthy and comfortable.

Characteristics of Strength Development of Ultra-High Performance Concrete according to Curing Condition (초고성능 콘크리트의 양생 조건에 따른 강도 발현 특성)

  • Park, Jong-Sup;Kim, Young-Jin;Cho, Jeong-Rae;Jeon, Se-Jin
    • Journal of the Korea Concrete Institute
    • /
    • v.25 no.3
    • /
    • pp.295-304
    • /
    • 2013
  • Ultra-High Performance Concrete (UHPC) has recently been one of the most active research fields in Korea as well as in foreign countries, because it can contribute to a longer life and economic efficiency of structures. Although precast-type UHPC fabricated in a factory is preferable in terms of quality control and reduction of construction period, there exist, even in the precast structure, some parts that need to be cast in-place such as the joints between precast segments. In the cast-in-place UHPC, however, it is probable that an optimum curing condition can hardly be realized in contrast to the factory production. In this study, therefore, the trend of compressive strength development of UHPC was experimentally investigated by assuming various inferior curing conditions that may be anticipated at a construction site. Concrete specimens were fabricated and cured under different conditions with the variables such as curing temperature, delay time before the initiation of curing, duration of curing time and moisture condition. The strengths were compared with those of the specimens cured by standard high temperature steam. Through the analysis of the test results, some minimum requirements for curing have been proposed that are required when the UHPC is cast in-place. It is expected, through this study, that practical use of UHPC in construction sites can be increased.

Development of an Automated Gangform Climbing System for Apartment Housing Construction - Structural Stability and Tower Crane Lifting Load Analysis - (공동주택 전용 갱폼 인양 자동화 기술의 개발 - 구조적 안정성 및 타워크레인 양중부하 분석 -)

  • Lee, Jeong-Ho;Yang, Sang-Hoon;Kim, Young-Suk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.4
    • /
    • pp.48-59
    • /
    • 2012
  • Gangform, compared to the traditional forms, is a systemized form which can reduce construction duration and cost by the advantage of using it repeatedly. However, transportation and climbing process of the Gangform is highly dependant on the performance of tower crane. Gangform climbing process takes one day out of six to seven days of a structural work cycle. Tower cranes can not be used in other lifting works when they lift the Gangform during the structural work cycle, causing the delay in the construction project. Numerous efforts and researches have been done in domestic and international industry to solve such limitations of Gangform climbing process. Especially, "A Study on the Development of Automatic Gangform Climbing System for Apartment Housing Construction"has suggested a conceptual model which can climb the Gangform system without a tower crane. In this paper, the technical and economical feasibilities of previously proposed Automatic Gangform climbing system are examined by evaluating its structural stability and lifting load reduction effect.

Comparative Analysis of Column Connection Characteristics of Green Frame (그린 프레임의 기둥접합부 특성 분석)

  • Kim, Keun-Ho;Lee, Taick-Oun;Lee, Sung-Ho;Kim, Sun-Kuk
    • Journal of the Korea Institute of Building Construction
    • /
    • v.12 no.4
    • /
    • pp.415-425
    • /
    • 2012
  • Green Frame was developed to embody a Green structural system that can provide long life, resource reduction, and availability of remodeling in apartment buildings. Composite precast concrete column and beam, the major structural material of Green Frame, can be installed precisely and promptly through connection of steels and concrete. The connection of Green Frame can be divided into four types, based on the method and characteristics of connection. To select an appropriate type for the site, a comparative analysis of the four types is necessary. The objective of this study is to compare the duration, cost, quality, and safety of four types. The findings of this study can be applied during the selection that appropriate composite precast concrete column reflected project characteristics in design phase.