• Title/Summary/Keyword: reduction of construction duration

Search Result 68, Processing Time 0.025 seconds

Performance Elements for Schedule Compression in Slab Form Work for High-rise Buildings (초고층 바닥거푸집 공사 공기단축을 위한 현장 요구 성능도출)

  • Lim, Hyun-Su;Kim, Tae-Hoon;Cho, Hun-Hee;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2010.05a
    • /
    • pp.167-170
    • /
    • 2010
  • In tall building construction, It is important to reduce construction duration of slab form work. Therefore, the purpose of this study is to assess the required performance for reduction of construction duration in slab form work of tall buildings. We surveyed the required performance and their degrees of importance and economical efficiency through the interview and questionnaire survey by related experts. This study proposes the guideline to develop improved formwork system for reduction of construction duration.

  • PDF

A Competitive Advantage Analysis of Construction Duration through the Comparison of Actual Data of Domestic Construction Firms - Focused on Mix-Use Residential Building and Officetel Building - (건설사별 공기비교를 통한 공기경쟁력 분석 - 주상복합 및 오피스텔 건물을 중심으로 -)

  • Ryu, Han-Guk;Kim, Sun-Kuk;Lee, Hyun-Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.1 s.29
    • /
    • pp.138-147
    • /
    • 2006
  • Construction companies have been interested in the construction duration which importantly affects the performance and the success of the construction projects in accordance with the systemic changes such as five days per week system, introduction of construction duration reduction bidding system and post sale system nowadays. It is also very important to estimate and forecast properly the construction duration as the construction companies compete for the projects in the situation of construction market reduction and the lowest bidding system. Recognizing the importance about the construction duration, the researches about comparing and analyzing or estiamting the construction duration have been performed. However, comparing studies about the construction duraion have been limited to the apartment and office building in domestic area. Many studies about forecasting construction duration have been performed through stochastic analysis and simulations. Little research has been addressed the comparison analysis of the real construction duration about the mix-use building and officetel building which occured according to the changes of the building requirements. Therefore, the objective of this study is to compare and analyze the real construction duration and the hypothetical construction duration about the mix-use building and officetel building of the domestic companies. Moreover, we select the most competitve construction company to get the strengths and analyze the competitive advatages of the construction companies about construction duration.

Competitive Advantage Strategy of Construction Duration by SWOT Analysis (SWOT 분석을 통한 건설기업의 공기경쟁력 강화 전략)

  • Kim, Sun-Kuk;Lee, Hyun-Soo;Ryu, Han-Guk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.2 s.30
    • /
    • pp.109-117
    • /
    • 2006
  • Recent rapid changes such as construction market reduction, lowest bidding system of construction cost, five days per week system, and post-construction sale system are inevitably accelerating the competitiveness between construction companies. Those rapid changes of construction environment require construction companies, which are main participants of construction industry, to adapt to the changes and more to lead new construction environment. However, there are many construction uncertainties which could delay construction completion. Without the proper identification of construction uncertainties, structured strategy establishment and management of construction schedule, the competitive advantages of construction duration could not be made. Thus this paper limited the research boundary to construction duration competitiveness instead of general strategy establishment. Recognizing the importance of proper calculation of construction duration, requirements of construction duration reduction and limited researches related to construction schedule strategy, we established the 25 strategies for construction duration competitivenss by internal and external construction environment analysis and SWOT analysis, and then elicited the first considerations to accomplish the strategies through concensus of all the staffs by questionnaire, brainstroming and face-to-face interviews.

Evaluation of Construction RCB Exterior Wall Formwork according to Placing Height on Nuclear Power Plant

  • Song, Hyo-Min;Sohn, Young-Jin;Shin, Yoonseok
    • Journal of the Korea Institute of Building Construction
    • /
    • v.15 no.6
    • /
    • pp.653-660
    • /
    • 2015
  • Technologies for reducing construction duration are key factors in nuclear power plant construction projects, as a reduction in construction duration at the construction phase leads to a reduction in construction cost and an increase in profits through the early operation of the nuclear power plant. To analyze the constructability of the height of single-layer placement of formwork for the Reactor Containment Building (RCB) exterior wall through lateral pressure according to the height of concrete placement, the deformation criteria for formwork, and a new form design, 'MIDAS GEN (hereinafter referred to as MIDAS)' is used in this study. The cost and workload of formwork are derived according to the unit of height of the RCB exterior wall. Based on the result, it was found that the higher the RCB exterior wall, the higher the material cost, and the less the construction duration and the less the total number of formwork layers. Based on this result, it is believed that the material cost and the construction duration can be appropriately determined according to the formwork height.

A Study on the Estimate Criteria and Influence Factors of Construction Duration of Domestic Firms -Focused on the Apartment Building Firms- (국내 건설 업체 공기산정 기준 및 영향요인 연구 -공동주택 중심으로-)

  • Kim Sun-Yeop;Kim Sun-Kuk;Han Choong-Hee
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.447-450
    • /
    • 2004
  • The domestic construction industry have focus on duration than construction cost. But recently it have interesting to The domestic construction industry, social requirement is changing. At the moderate speed duration has other angle of reducing cost and management of efficiency. specially Apartment building construction process is similar to other construction industry so it Is obtain a strong Point. This study on, A Target of construction industry is short duration than other it, general construction duration in summary schedule of level is studied, is based and construction duration for the point it is indicated reduction duration

  • PDF

The State of Schedule Management and the Recognition of Duration Shortening (공정관리의 실태 및 공기 단축에 대한 인식정도)

  • Kim, Ja-Yeon;Kim, Eui-Sik
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.5
    • /
    • pp.87-94
    • /
    • 2010
  • Construction projects are based on the actual field, so if the construction schedule that is established in the construction plan is delayed or extended for various reasons, construction companies are vulnerable to claims, and thus strive to complete a building within the planned timeline by shortening the construction time. Therefore, this study surveyed technicians in apartment construction in Gwangju, and studied their perceptions of the actual conditions of process control, construction time needs, goals, and methods. The results showed that the organization of the process control department and professional employees was lacking compared to other regions. The need for construction time was perceived as high, while the reduction of the construction cost was perceived as low. Regarding the reduction goal, they perceived highly the preparation for the delay of construction time and various claims, and for the reduction method, they mentioned the extension of working hours and the increase in employees. Based on the results of this study, technicians should consider that a reduction of construction time not only can make up for a delay in construction, but is also closely related to improvements in production through reduction of cost, and increased international competitiveness.

An Assessment of Field Application of Elementary Technology for Reducing Construction Duration in the Apartment Housing Construction (공동주택 골조공기단축을 위한 요소기술의 현장 적용성 평가)

  • Kim, Kyu-Hoi;Park, Moon-Seo;Lee, Hyun-Soo;Park, Song-Woo;Joo, Sun-Woo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.368-372
    • /
    • 2007
  • Recently, construction companies prefer to use large scale system forms to prepare for lacking of skilled workers, aging and the chances of application of pre-build&post-sale policy. In result of the effort and interest, the duration for framework of domestic high rise buildings has been accomplished to 3-4days per floor but for the apartment housing which form over 90% of the domestic construction industry, and especially the middle story RC apartments which is the main part, the duration for framework is only about 6-8days per level. This is only about 50% of the duration per level of RC residential buildings in North America. In previous researches elementary technology, which has potential of duration reduction, was proposed and this research suggest the applicability in construction sites and ways to improve it using elementary technology applied Mock-up Test. Furthermore, we analyze the productivity and T/C usage rate of the 6day-Cycle and suggest an improved model.

  • PDF

Analysis of Actual Duration by Effecting Elements to Duration Estimate - Focused on Standard Duration of the Office Building Construction - (공기산정 영향요인별 실적공기 비교분석 - 사무소 건축공사 공기산정기준을 중심으로 -)

  • Hwang Hyo-Sang;Kim Kyung-Rai;Suh Sang-Wook;Kim Chang-Duk;Shin Dong-Woo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.3 no.3 s.11
    • /
    • pp.84-93
    • /
    • 2002
  • It is important to reduce construction duration in private sales and lease business for management of cash now in the owner's aspect. However, because the concept of standard duration hasn't been established in the domestic construction industry, it is difficult to present the standard of duration estimate. To solve this problem, this paper (1) grasped the effecting elements considered in the duration estimate through referring the existing literature related to the schedule management, (2) accomplished a comprehensive research on actual duration based on office buildings through the questionnaire survey and the expert interview, (3) presented the collected research data analyzed by effecting elements as standard duration, (4) compared standard duration with actual duration of countries advanced in construction projects as well as analyzed them, and then (5) raised the necessity of duration reduction in the domestic construction industry.

Schedule Risk Management of Reinforced Concrete Construction at the Preconstruction Phase (착공전 단계에서의 철근콘크리트 공사 공정리스크 관리 방안)

  • Ryu, Han-Guk;Kim, Sun-Kuk;Lee, Hyun-Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.5 s.27
    • /
    • pp.119-127
    • /
    • 2005
  • According to the recent systemic changes such as construction market reduction, five days per week system, introduction of construction duration reduction bidding system and post-construction sale system, the bidding competition have been enhanced. However, there are many construction schedule risks which could delay construction completion. Without the proper identification of construction schedule risks and the structured construction schedule risk management, the competitive advantages of construction project could not be made. Previous researches to solve the problem have been focused on the construction schedule categorization, construction schedule management, and the system development to manage the construction schedule risk. Therefore, this study selected the reinforeced concrete construction as the studied work due to the major impact characteristics on the total construction duration and the quite accident rate, and then proposed the real construction schedule risks of reinforced concrete construction and the construction risk management method based on the previous studies, many times of expert interviews and brainstorming.

Impact of Balance between Productivities on Repetitive Construction Projects

  • Shim, Euysup;Yoo, Wi Sung
    • Journal of the Korea Institute of Building Construction
    • /
    • v.13 no.4
    • /
    • pp.360-371
    • /
    • 2013
  • Fast delivery of construction projects provides more value to project owners. Batch production, which is production not in single pieces, but in batches, is a common approach in repetitive construction projects such as multi-unit residential building construction projects. In batch production, the use of a small batch size allows the early start of subsequent activities, and thus can lead to early completion of projects. In addition to batch size, balance between productivities in construction activities can affect project duration. However, the impact of the balance between productivities with regard to their order on project duration has not been studied. The main goal of this study is to test a hypothesis, which is that the order of construction activities' unbalanced productivities affects the amount of time reduction that can be achieved by using a small batch size. A computer-based simulation model was developed, and five different cases were simulated to test the hypothesis. The conclusion of the simulation result is that the order of productivities does not affect the time reduction achieved by using a small batch size. It is expected that the findings of this study can help general contractors make decisions in terms of batch size.