• Title/Summary/Keyword: reconstruction project

Search Result 179, Processing Time 0.031 seconds

Approach of establishing As-Is BIM Model Process in Apartment Remodeling project using 3D Laser Scanning. (공동주택 리모델링 사업에서 3D 레이저스캐닝 기술을 활용한 기존 구조체 As-Is BIM모델 구축 프로세스 제안)

  • Park, Ji-Eun;Yu, Jung-Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.11a
    • /
    • pp.183-184
    • /
    • 2015
  • More than 50% of the existing buildings in Korea are over 15 years old. Therefore it is necessary to be held reconstruction or remodeling deteriorated buildings more efficiently. Especially, since remodeling project reserves existing structures, it requires less period of project and construction period compare to reconstruction. It is possible to minimize uncertainty in communication between participants and able to manage information and construct efficiently in remodeling projects. This paper is first step of integrated BIM-based whole lifecyle management of apartment remodeling process. It suggests 3D laser scanner specification factors and site constraint factors for mapping between two groups. Therefore it will contribute to develop mapping algorithm of two groups and find optimal combination for apartment remodeling.

  • PDF

A Study on the Change of Architecture Density and Residential Environment according to Reconstruction (재건축에 따른 건축밀도 및 주거환경의 변화 연구)

  • Kim, Hong-Bae
    • Journal of the Korean Institute of Rural Architecture
    • /
    • v.19 no.1
    • /
    • pp.35-42
    • /
    • 2017
  • This study aims to investigate the change in building density and residential environment after the reconstruction of decrepit public rental housing complexes formed in accordance with the Land Readjustment Project during the 1970s-80s. The results of this study can be summarized as follows: First, in terms of change in residential environment after the reconstruction, floor plans that were limited to two to four types and to small apartments measuring $42.9m^2$(13py)-$56.1m^2$ (17py) became varied, presenting 5-6 types of floor plans and various sizes of apartments. In particular, the reconstructed apartments were mainly built in a size smaller than 85($m^2$) and in the 3LDK floor plan and staircase-style unit architectural structure in order to reflect the lifestyle of residents. Second, in terms of change in building density after the reconstruction, the building coverage ratio did not change a lot, but the floor area ratio showed great change depending on the complex, ranging from a minimum of 2.9 times (Singdong Complex) to a maximum of 5.4 times (Eoyangdong Complex). Such change is attributable to the reconstruction policy that aims to improve the residential environment for original residents, secure economic feasibility and efficiency, and reflect the lifestyle of residents while incorporating dividends assigned to the existing housing project members as well as the maximum floor area ratio allowed by the regulation. Additionally, in terms of change in the number of floors and building density after the reconstruction, the former 5-story apartments were changed to apartments with 16-28 stories. Accordingly, the number of households in each complex has also increased by 20%. Third, according to the characteristics of parking facilities in terms of the size and density of parking spaces, former apartment complexes had only aboveground parking lots, not underground parking area. The newly constructed apartment complexes have underground parking space, and the parking-housing ratio is 1.1-1.3 cars.

An Integrated Environment and Economic Evaluation Model for Building Reconstruction and Remodeling Projects (재건축과 리모델링 사업의 환경성${\cdot}$경제성 통합평가모델)

  • Lee Ju-Heon;Park Chan-Sik
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.327-330
    • /
    • 2002
  • Recently, the environmental sustainability has showed up one of the important considerations in the construction industry. However, the effective evaluation method for the decision-making on either reconstruction or remodeling of a project has not been developed so far. This paper presents an integrated evaluation model considering both environment and economic factors of a building project for which the decision making on either remodeling or reconstruction is needed. In order to develop the model, the characteristics of both types of projects were investigated and analyzed through the related literature review, and then appropriate evaluation criteria and analysis methodology to be used in the model were developed.

  • PDF

Structure-From-Motion Approach to the Reconstruction of Surfaces for Earthwork Planning

  • Nassar, Khaled;Jung, Young-Han
    • Journal of Construction Engineering and Project Management
    • /
    • v.2 no.3
    • /
    • pp.1-7
    • /
    • 2012
  • The reconstruction of surfaces from unorganized point clouds can provide very useful information for construction managers. Although point clouds are generally created using 3D scanners, they can also be generated via the structure-from-motion technique using a sequence of images. Here we report a novel surface reconstruction technique for modeling and quantifying earthworks that can be used for preliminary planning, project updates and estimating of earthwork quantities, as well as embedded planning systems in construction equipment. The application of structure-from-motion techniques in earth works is examined and its advantages and limitations identified. Data from 23 earthwork excavation construction sites were collected and analyzed. 3D surface reconstructions during the construction phase were compared to the original land form. Similar experiments were conducted with piles of earth and the results analyzed to determine appropriate ranges of use for structure-from-motion surface reconstructions in earthwork applications. The technique was found to be most suited to pile of materials with volumes less than 2000 m3. Piles up to 10 m in height and with base areas up to $300m^2$ were also successfully reconstructed. These results should be of interest to contractors seeking to utilize new technology to optimize operational efficiency.

Reconstruction of Mandibular Bone Defect Using a Titanium Mesh with Autogenous Particulate Cortical Bone Graft by an Intraoral Approach: A Case Report (구강내 접근으로 자가 분쇄 피질골과 Titanium Mesh를 이용한 광범위한 하악골 골결손부 재건: 증례보고)

  • Choi, Seok-Tai;Leem, Dae-Ho
    • Maxillofacial Plastic and Reconstructive Surgery
    • /
    • v.34 no.6
    • /
    • pp.466-472
    • /
    • 2012
  • The loss of mandibular continuity due to trauma, neoplasm, or infection results in major esthetic and biologic compromise. The reconstruction of the mandibular bone defect still poses a challenge to oral and maxillofacial surgeons. There have been a number of variety graft materials. Among them, free block bone graft with rigid fixation has been widely used. However, cases using free block bone grafts may lead to a marked invasion of the donor site, mal-union, and absorption of the block bone. In this respect, particulate cortical bone using a titanium mesh tray can be an effective alternative option in order to achieve a proper bone contour and good oral rehabilitation. We have developed an intraoral approach for the mandibular reconstruction method using a titanium mesh tray with autogenous particulate cortical bone graft.

A Case Study on Elementary School Teachers' Reconstruction Experience of Science Curriculum (초등 교사의 과학과 교육과정 재구성 경험에 대한 사례 연구)

  • Lim, Hwa Young;Yoon, Hye-Gyoung
    • Journal of Korean Elementary Science Education
    • /
    • v.38 no.1
    • /
    • pp.102-115
    • /
    • 2019
  • This study investigated how elementary school teachers reconstruct science curriculum and how they perceive about their experiences. In-depth interviews were conducted with four elementary school teachers who had experience in restructuring science curriculum. Two distinct types of reconstruction were found; restructuring within the subject and integrating between subjects. The teachers who were restructuring science curriculum from personal needs usually substitute, delete, add some contents or activities and change the order of unit within science subject. In contrast, the teachers who were participating in research school usually integrated science with other subjects, developing a new unit or project. The latter recognized the need of teachers' reconstruction of science curriculum more strongly and the importance of teacher's voluntary learning community in implementing the reconstruction. Though they had some difficulties in identifying students' interests and level of understanding and lack of time, all teachers valued curriculum reconstruction by relating it to teacher professional development, identity as a teacher, and job consciousness.

The Study on Socioeconomic role of one dollar campaign project initiated by Rwandan diaspora

  • Emmanuel, Ntegamahererzo;Lee, Chun Ho
    • Asia-pacific Journal of Multimedia Services Convergent with Art, Humanities, and Sociology
    • /
    • v.8 no.10
    • /
    • pp.471-479
    • /
    • 2018
  • This paper on the socioeconomic role of One Dollar Campaign project initiated by Rwanda Diaspora in the reconstruction of the country after 1994 genocide against Tutsi tends to show how Rwanda Diaspora contributes to the socioeconomic development of their home country. The 1994 genocide against Tutsi in Rwanda has destroyed the country and the Rwandan society; and rebuilding the trust, unity, hope and socioeconomic status of genocide survivors in particular and of all Rwandans in general had to engage all Rwandans wherever they were. The focus of this paper is to assess the change on socioeconomic status of the beneficiaries of the one dollar campaign project initiated by Rwanda Diaspora which aimed to help genocide survivor orphans to have a shelter. The results showed that the amount of money contributed by Rwanda Diaspora for this project is of paramount importance as it exerts a positive impact on genocide orphan survivors' daily life, change of their socioeconomic status and to the country's development in general.