International conference on construction engineering and project management
/
2005.10a
/
pp.892-896
/
2005
This paper collected 132 schools reconstruction projects in central Taiwan, which received the most serious damage from the Chi-Chi Earthquake. Regression analysis was implemented to build the prediction model of the cost and the duration for the collected projects. It is found that the cubic regression models are capable for predicting the cost and the duration of the projects contracted by the central agency of which the contracting awarding approach was based on the most advantageous tendering (MAT) approach. On the other hand, power regression models are capable for predicting the cost and the duration of the projects contracted through the low bid tendering (LBT) approach. It is also found that the performance of the regression prediction model differs in accordance with organizations that contracted the reconstruction projects.
In connection with the plan for improving the residential environment gradually by analyzing the present condition of the reconstruction and parcel form of the housing area in a inner area, the main objective of this research is to develop a cooperative urban housing model based on the neighborhood agreement. The parcel form has a structure that is inappropriate for individual reconstruction; thus, the substantial improvement only through the residential environment improvement project has its limitations. As an alternative plan to resolve such limitations, I proposed a system that enables step-by-step reconstruction within the small-scaled blocks through the annexation of the land based on the neighborhood agreement. Nonetheless, I realized that it is difficult to apply such reconstruction system to individual housing. Therefore, I presented a design concept on the cooperative urban housing project as a residential form for the reconstruction inside blocks. A model plan vouches for its effectiveness. To apply substantially the cooperative urban housing plan based on the neighborhood agreement, we need to supplement the sectional plan system.
International conference on construction engineering and project management
/
2005.10a
/
pp.649-654
/
2005
A new law, the Urban and Living Environment Improvement Act, was established, promulgated, and entered into by the Ministry of Construction and Transportation as of 1st July 2003. This system under this law, which improves currently executed consulting process and upgrade its level, is to execute the legal process and procedures that are necessarily required for housing reconstruction/renewal project.. This system requires to be supplemented with addition of reasonable, logical, and systemized tools of system. Through concurrent application of professional management of renewal business(PMRB), more benefit will be provided to housing renewal associations that are constituted with residences concerned for execution of CM project.
Proceedings of the Korean Institute Of Construction Engineering and Management
/
autumn
/
pp.267-272
/
2001
The purpose of this study is to suggest the process and calculating method of feasibility study for the reconstruction apartment projects, and the results of this study is fundamental knowledge for the exact and exquisite plan. The process of this study are as following : 1. Research for the process and peculiar character of reconstruction project. 2. Investigate input and output item and suggest the calculating methods that are generally accepted. 3. Suggest the general process on feasibility study for reconstruction apartment project.
The purpose of this study is to investigate the cause of repeated accidents through the investigation and analysis of the collapse cases of domestic earthquakes in order to prevent the earthquake disaster in the urban redevelopment and reconstruction. It is designed and constructed to draw out various problem factors and to find solutions to these problems. And the contents related to various laws and systems of the construction project management stage. Especially. In the management of the construction management centered on the safety management and quality control of the technical aspect design, supervision, construction phase through the cause of the accident and improvement measures based on the investigation report of the collapse of the construction site near Sangdo Kindergarten in Seoul. Supervisor. And constructors should be settled on the responsibility and responsibility of God. In order to achieve the purpose of the project, a system is established to link worker-centered occupational safety and health management with technology-based safety construction management, and analysis of how the quality control of the earthquake prevention affects safety construction management The purpose of this study is to prepare the optimum management plan of construction business.As a result of this study, it is aimed to accomplish the purpose of small scale redevelopment and reconstruction construction project by providing optimization method in the stage of construction project management in order to prevent collapse caused by differences in design,Is expected.
After the Korean war, two major attempts were made to reconstruct Gwanghwamun Gate as an important part of Korea's lost cultural heritage. In December 2006, the Korean government replaced the concrete gate with a wooden one, yet traces of the attempts made in the 1960s to transform Gwanghwamun Gate and the main road remain to this day. At the time, the Third Republic of Korea, sought to legitimize itself in the name of modernity, and went on to modernize the architecture and urban landscape of Seoul. The location and design selected for the rebuilt Gwanghwamun illustrated the symbolic relationship between historic heritage and urban development. The reconstruction of the gate began as part of the Third Republic's project to restore the Central Administration Building and culminated in the transformation of the main road in front of the gate. By reconstructing the traditional gate using concrete, the military government intended to convey the message that we could inherit our proud tradition using modern materials, and that we should actively adopt the new technologies of the modern era. This study begins with the premise that the Gwanghwamun reconstruction project of 1968 represents the application of new technological thinking to Korea's architectural style, and has two objectives. The first is to summarize the reconstruction process and method using the records and drawings from the 1968 project, which was then under the leadership of architect Kang Bong-jin. The second is to analyze the characteristics of the architectural style and structure of the reconstructed Gwanghwamun so as to reinterpret the relationship between Korean tradition and modern technology.
Proceedings of the Korean Institute Of Construction Engineering and Management
/
autumn
/
pp.460-464
/
2003
A reconstrucion project is very complex and requires technical knowledges and experiences, however due to not having any related knowledge consortium usually does not have any related knowledge. So in this study, we have suggested a systematic procedure to execute a reconstruction project focused on the profitability analysis. a model is developed to identify and calculate all relevant cost and revenue to the project using the IDEF0 methodology.
Seo, Wonseok;Kim, Seongah;Park, Junseok;Kim, Jinyoung
International conference on construction engineering and project management
/
2022.06a
/
pp.1059-1066
/
2022
In 2020, it was estimated that more than 2.4 million households in South Korea are over 30 years old. That is, more than 40% of all houses in Korea are old and that they require proper rehabilitation. The two options to improve poor living conditions are reconstruction and remodeling. Compared to reconstruction, remodeling has advantages in terms of the construction period, cost, and environmental impact. As such, the current Korean regulations are more favorable for remodeling than reconstruction. Typically, several candidate floor plans are presented in the early stages of an apartment remodeling project. Extracting information about bearing walls and other structural elements from the multiple plans to compare those plans quantitatively is one of the essential tasks during the early stage of a project. To cope with this task, an automated data extraction method for walls and slabs from before and after remodeling plans is developed. Through the developed program, load-bearing walls, non-bearing walls, slabs, and weight changes after remodeling can be analyzed and visualized in a fast and automated manner.
Korean Journal of Construction Engineering and Management
/
v.7
no.2
s.30
/
pp.89-97
/
2006
With the increased demand on housing quality and effective urban redevelopment, a new paradigm in reconstruction project is in need. Especially, the Urban and Residential Environment Improvement Law which initiated on July 1, 2003 has become a significant turning point. This code is expected to function as a consistent and systematic measure. This study will examine the code's major concepts and methods to progress reconstruction projects effectively. The application of construction management is examined carefully since the new code requires renewal project consulting firms to function as a professional complement rather than simply perform administration work, as in the past. Also, construction managing methods that can be related to renewal project consulting are examined and speculated. Lastly, methods to improve efficiency in reconstruction projects are introduced through case study and analysis on applicability and expected results.
Kim, Dong-Wook;Kim, Hee-Joung;Haijo Jung;Soonil Hong;Yoo, Young-Il;Kim, Dong-Hyeon;Kim, Kee-Deog
Proceedings of the Korean Society of Medical Physics Conference
/
2002.09a
/
pp.506-508
/
2002
As an advancement of medical imaging modalities and analyzing software with multi-function, active researches to acquire high contrast and high resolution image being done. In recently, development of medical imaging modalities like as Computed Tomography (CT) and Magnetic Resonance Imaging (MRI) is aiming to display anatomical structure more accuracy and faster. Thus, one of the important areas in CT today is the use of CT scanner for the quantitative evaluation of 3-D reconstruction images from 2-D tomographic images. In CT system, the effective slice thickness and the quality of 3-D reconstructed image will be influenced by imaging acquisition parameters (e.g. pitch and scan mode). In diagnosis and surgical planning, the accurate distance measurements of 3-D anatomical structures play an important role and the accuracy of distance measurements will depend on the acquisition parameters such as slice thickness, pitch, and scan mode. The skull phantom was scanned with SDCT for various acquisition parameters and acquisition slice thicknesses were 3 and 5 mm, and reconstruction intervals were 1, 2, and 3 mm to each pitch. 3-D visualizations and distance measurements were performed with PC based 3-D rendering and analyzing software. Results showed that the image quality and the measurement accuracy of 3-D SDCT images are independent to the reconstruction intervals and pitches.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.