• Title/Summary/Keyword: reconstruction project

Search Result 183, Processing Time 0.024 seconds

FORECASTING THE COST AND DURATION OF SCHOOL RECONSTRUCTION PROJECTS USING REGRESSION ANALYSIS

  • Wei Tong Chen;Ying-Hua Huang;Shen-Li Liao
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.892-896
    • /
    • 2005
  • This paper collected 132 schools reconstruction projects in central Taiwan, which received the most serious damage from the Chi-Chi Earthquake. Regression analysis was implemented to build the prediction model of the cost and the duration for the collected projects. It is found that the cubic regression models are capable for predicting the cost and the duration of the projects contracted by the central agency of which the contracting awarding approach was based on the most advantageous tendering (MAT) approach. On the other hand, power regression models are capable for predicting the cost and the duration of the projects contracted through the low bid tendering (LBT) approach. It is also found that the performance of the regression prediction model differs in accordance with organizations that contracted the reconstruction projects.

  • PDF

A Study on Model Development of Cooperative Urban Housing by Neighborhood Agreement - Case Study on the Inner Residential Area, Sunchon City - (이웃협정에 의한 협조형 도시주택의 모델개발에 관한 연구 -순천시의 도심주택지에 있어서 케이스스터디 -)

  • 김영석
    • Journal of the Korean housing association
    • /
    • v.14 no.6
    • /
    • pp.193-204
    • /
    • 2003
  • In connection with the plan for improving the residential environment gradually by analyzing the present condition of the reconstruction and parcel form of the housing area in a inner area, the main objective of this research is to develop a cooperative urban housing model based on the neighborhood agreement. The parcel form has a structure that is inappropriate for individual reconstruction; thus, the substantial improvement only through the residential environment improvement project has its limitations. As an alternative plan to resolve such limitations, I proposed a system that enables step-by-step reconstruction within the small-scaled blocks through the annexation of the land based on the neighborhood agreement. Nonetheless, I realized that it is difficult to apply such reconstruction system to individual housing. Therefore, I presented a design concept on the cooperative urban housing project as a residential form for the reconstruction inside blocks. A model plan vouches for its effectiveness. To apply substantially the cooperative urban housing plan based on the neighborhood agreement, we need to supplement the sectional plan system.

A STUDY ON APPLICATION OF CONSTRUCTION MANAGEMENT(CM) TO HOUSING RECONSTRUCTION/RENEWAL PROJECT IN KOREA - Focused on Application of Construction Management (CM) in Professional Management of Renewal Business(PMRB)

  • Changgyo Kim;Jaeyoul Chun
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.649-654
    • /
    • 2005
  • A new law, the Urban and Living Environment Improvement Act, was established, promulgated, and entered into by the Ministry of Construction and Transportation as of 1st July 2003. This system under this law, which improves currently executed consulting process and upgrade its level, is to execute the legal process and procedures that are necessarily required for housing reconstruction/renewal project.. This system requires to be supplemented with addition of reasonable, logical, and systemized tools of system. Through concurrent application of professional management of renewal business(PMRB), more benefit will be provided to housing renewal associations that are constituted with residences concerned for execution of CM project.

  • PDF

A Study on the Feasibility Analysis for the Reconstruction Apartment Projects (아파트 재건축사업의 타당성분석절차에 관한 연구)

  • Lee Jae-Young;Jung Jung-Man;Kim Soo-Yong
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.267-272
    • /
    • 2001
  • The purpose of this study is to suggest the process and calculating method of feasibility study for the reconstruction apartment projects, and the results of this study is fundamental knowledge for the exact and exquisite plan. The process of this study are as following : 1. Research for the process and peculiar character of reconstruction project. 2. Investigate input and output item and suggest the calculating methods that are generally accepted. 3. Suggest the general process on feasibility study for reconstruction apartment project.

  • PDF

A Study on the Management of Construction Project for Preventing Accidents of Reclamation : basic on the collapse of Sangdo Kindergarten (도심지 소규모 재개발·재건축공사시 흙막이가시설 사고예방을 위한 건설사업관리 방안 연구 : 상도유치원 붕괴사고 중심으로)

  • Oh, Se-kil;Park, Joo-Moon
    • Journal of Urban Science
    • /
    • v.8 no.1
    • /
    • pp.33-44
    • /
    • 2019
  • The purpose of this study is to investigate the cause of repeated accidents through the investigation and analysis of the collapse cases of domestic earthquakes in order to prevent the earthquake disaster in the urban redevelopment and reconstruction. It is designed and constructed to draw out various problem factors and to find solutions to these problems. And the contents related to various laws and systems of the construction project management stage. Especially. In the management of the construction management centered on the safety management and quality control of the technical aspect design, supervision, construction phase through the cause of the accident and improvement measures based on the investigation report of the collapse of the construction site near Sangdo Kindergarten in Seoul. Supervisor. And constructors should be settled on the responsibility and responsibility of God. In order to achieve the purpose of the project, a system is established to link worker-centered occupational safety and health management with technology-based safety construction management, and analysis of how the quality control of the earthquake prevention affects safety construction management The purpose of this study is to prepare the optimum management plan of construction business.As a result of this study, it is aimed to accomplish the purpose of small scale redevelopment and reconstruction construction project by providing optimization method in the stage of construction project management in order to prevent collapse caused by differences in design,Is expected.

The Characteristics of Gwanghwamun reconstruction in the 1960's (1960년대 광화문 중건과정의 특성)

  • Kang, Nan-hyoung;Song, In-Ho
    • Journal of architectural history
    • /
    • v.24 no.6
    • /
    • pp.45-55
    • /
    • 2015
  • After the Korean war, two major attempts were made to reconstruct Gwanghwamun Gate as an important part of Korea's lost cultural heritage. In December 2006, the Korean government replaced the concrete gate with a wooden one, yet traces of the attempts made in the 1960s to transform Gwanghwamun Gate and the main road remain to this day. At the time, the Third Republic of Korea, sought to legitimize itself in the name of modernity, and went on to modernize the architecture and urban landscape of Seoul. The location and design selected for the rebuilt Gwanghwamun illustrated the symbolic relationship between historic heritage and urban development. The reconstruction of the gate began as part of the Third Republic's project to restore the Central Administration Building and culminated in the transformation of the main road in front of the gate. By reconstructing the traditional gate using concrete, the military government intended to convey the message that we could inherit our proud tradition using modern materials, and that we should actively adopt the new technologies of the modern era. This study begins with the premise that the Gwanghwamun reconstruction project of 1968 represents the application of new technological thinking to Korea's architectural style, and has two objectives. The first is to summarize the reconstruction process and method using the records and drawings from the 1968 project, which was then under the leadership of architect Kang Bong-jin. The second is to analyze the characteristics of the architectural style and structure of the reconstructed Gwanghwamun so as to reinterpret the relationship between Korean tradition and modern technology.

A Model on the Feasibility Analysis for the Apartment Reconstruction (재건축사업의 타당성분석 절차의 모델링)

  • Jung Jung-Man;Kim Soo-Yong
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.460-464
    • /
    • 2003
  • A reconstrucion project is very complex and requires technical knowledges and experiences, however due to not having any related knowledge consortium usually does not have any related knowledge. So in this study, we have suggested a systematic procedure to execute a reconstruction project focused on the profitability analysis. a model is developed to identify and calculate all relevant cost and revenue to the project using the IDEF0 methodology.

  • PDF

Automated Data Analysis of Floor Plans for the Remodeling of Apartment Housing

  • Seo, Wonseok;Kim, Seongah;Park, Junseok;Kim, Jinyoung
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.1059-1066
    • /
    • 2022
  • In 2020, it was estimated that more than 2.4 million households in South Korea are over 30 years old. That is, more than 40% of all houses in Korea are old and that they require proper rehabilitation. The two options to improve poor living conditions are reconstruction and remodeling. Compared to reconstruction, remodeling has advantages in terms of the construction period, cost, and environmental impact. As such, the current Korean regulations are more favorable for remodeling than reconstruction. Typically, several candidate floor plans are presented in the early stages of an apartment remodeling project. Extracting information about bearing walls and other structural elements from the multiple plans to compare those plans quantitatively is one of the essential tasks during the early stage of a project. To cope with this task, an automated data extraction method for walls and slabs from before and after remodeling plans is developed. Through the developed program, load-bearing walls, non-bearing walls, slabs, and weight changes after remodeling can be analyzed and visualized in a fast and automated manner.

  • PDF

A study of Construction Management for the Application to the Residential Environment Improvement Project (주거환경정비사업에서의 건설사업관리 적용 방안 연구)

  • Lee, Jeong-Bok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.2 s.30
    • /
    • pp.89-97
    • /
    • 2006
  • With the increased demand on housing quality and effective urban redevelopment, a new paradigm in reconstruction project is in need. Especially, the Urban and Residential Environment Improvement Law which initiated on July 1, 2003 has become a significant turning point. This code is expected to function as a consistent and systematic measure. This study will examine the code's major concepts and methods to progress reconstruction projects effectively. The application of construction management is examined carefully since the new code requires renewal project consulting firms to function as a professional complement rather than simply perform administration work, as in the past. Also, construction managing methods that can be related to renewal project consulting are examined and speculated. Lastly, methods to improve efficiency in reconstruction projects are introduced through case study and analysis on applicability and expected results.

Quantitative Measurements of 3-D Imaging with Computed Tomography using Human Skull Phantom

  • Kim, Dong-Wook;Kim, Hee-Joung;Haijo Jung;Soonil Hong;Yoo, Young-Il;Kim, Dong-Hyeon;Kim, Kee-Deog
    • Proceedings of the Korean Society of Medical Physics Conference
    • /
    • 2002.09a
    • /
    • pp.506-508
    • /
    • 2002
  • As an advancement of medical imaging modalities and analyzing software with multi-function, active researches to acquire high contrast and high resolution image being done. In recently, development of medical imaging modalities like as Computed Tomography (CT) and Magnetic Resonance Imaging (MRI) is aiming to display anatomical structure more accuracy and faster. Thus, one of the important areas in CT today is the use of CT scanner for the quantitative evaluation of 3-D reconstruction images from 2-D tomographic images. In CT system, the effective slice thickness and the quality of 3-D reconstructed image will be influenced by imaging acquisition parameters (e.g. pitch and scan mode). In diagnosis and surgical planning, the accurate distance measurements of 3-D anatomical structures play an important role and the accuracy of distance measurements will depend on the acquisition parameters such as slice thickness, pitch, and scan mode. The skull phantom was scanned with SDCT for various acquisition parameters and acquisition slice thicknesses were 3 and 5 mm, and reconstruction intervals were 1, 2, and 3 mm to each pitch. 3-D visualizations and distance measurements were performed with PC based 3-D rendering and analyzing software. Results showed that the image quality and the measurement accuracy of 3-D SDCT images are independent to the reconstruction intervals and pitches.

  • PDF