• Title/Summary/Keyword: re-bar work

Search Result 22, Processing Time 0.024 seconds

Productivity Improvement through the Waste Elimination of Construction Process (건설공정의 낭비제거를 통한 생산성 향상 방안)

  • Mun Jeong-Mun;Kim Chang-Duk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.3 no.4 s.12
    • /
    • pp.93-103
    • /
    • 2002
  • The reinforcement concrete work is the work affected by structural safety, durability, and schedule with form work. The domestic reinforcement concrete works have mainly worked the process of re-barfabrication/assembly on site. Finally it have low productivity. Then this paper analyzed waste factors and the process of re-bar fabrication/assembly on site for the productivity improvement and value-added productivity improvement. Waste factor analysis aims at maximizing value-added by the value analysis of re-bar fabrication and assembly on site. Finally, Value-AddingActivity(VAA)ismuchlessthan non-value adding activity. Especially, Non-Value-Adding Activity(NVAA) generates waste such as the activity steps, labors, equipments, materials, time, and soon. And it was non-flow production, over production, and analyzed into having to shift value. This paper aimsat maximizing value-addingactivity and minimizingnon value-addingactivity through waste factor analysis in process for the improvement of value added productivity.

Application Possibility of Folding Pre-fabricated Rebar Cage in Domestic Construction Fields (접이식 철근 선조립 공법의 적용 가능성 검토에 관한 연구)

  • Jung, Young-Chul;Lee, Byung-Yun;Kim, Gwang-Hee
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.2
    • /
    • pp.125-132
    • /
    • 2010
  • Recently, construction companies have had difficulty in managing their business due to economic hardship domestically and abroad, decreased orders, and low profitability due to intensified competition. To address these issues, construction companies need to develop or introduce construction methods that improve productivity. The purpose of this study is to investigate a re-bar construction method that reduces the high expenses of transport by folding a pre-fabricated re-bar cage. It was concluded that the application of rebar pre-fabrication would be activated and the productivity of construction sites improved by adopting the folding rebar pre-fabrication method.

Effect of the Piling Work Noise on the Behavior of Snakehead (Channa argus) in the Aquafarm (양식 가물치 (Channa argus)의 행동에 미치는 파일작업 소음의 영향에 관한 연구)

  • SHIN Hyeon Ok
    • Korean Journal of Fisheries and Aquatic Sciences
    • /
    • v.28 no.4
    • /
    • pp.492-502
    • /
    • 1995
  • This paper describes the relationship between the behavior of the snakehead ( Channa arps) of 44cm long and the environmental noise levels due to the piling work. The experiment is conducted in the aquafarm located near Asan lake, Pyongtaek in 1993. The fish trajectory is obtained by a biotelemetry system in which a pulsed ultrasonic pinger attached onto the dorsal is tracked three dimensionally, and the noise and the vibration levels both in air and in water are measured. The results of this study are as follows: 1) The noise levels in water and in air and the vibration level measured at a distance of 90m from the noise source, increased by 36.5dB $(re\;l{\mu}Pa)$, 2308$(re\;0.0002{\mu}bar)$ and $5.9{\mu}m$ repectively compared to the levers before piling. 2) The highest variation of the swimming speed was observed right after the piling works and the width of variation decreased with the elapsed time. The average speeds of the fish before and during the works were measured as 0.8 times and 1.1 times of the body length, respectively. 3) It is found that the fish escapes into the mud of the aquafarm when a heavy shock wave occurred. Consequently, the heavy shock by the piling works could produce a considerably unfavorable effect to the fish.

  • PDF

A Study on the Survey of Worker's Satisfaction with Safety Gear in Structural Frame Work (골조공사 관련 공종 근로자의 안전보호구별 만족도 조사)

  • Shin, Han-Woo;Kim, Tae-Hui;Kim, Gwang-Hee
    • Journal of the Korea Institute of Building Construction
    • /
    • v.8 no.2
    • /
    • pp.131-136
    • /
    • 2008
  • Safety management is the most important factor in the construction industry. If the construction company don't control the risk, it causes the accident which give the company fatal loss. According to the Korea industrial safety analysis reports, the 25.72% of the disasters are from the construction industry, and the 13.6% construction disasters are caused by not properly using the safety gears. Therefore, this study is to investigate the Wearing Safety Gear by Occupational Classification and the Satisfaction in the Construction Field. The results are ; Carpenters are dissatisfied with the safety shoes and belt, re-bar workers are dissatisfied with the safety helmet and shoes, Concrete workers are dissatisfied with the safety helmet and goggles.

An Experimental Study on the Characteristics and Lateral Pressure of Super-Workable Concrete (초유동 콘트리트의 재료적 특성과 거푸집 측압에 관한 실험적 연구)

  • 이준구
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.42 no.1
    • /
    • pp.83-91
    • /
    • 2000
  • The purpose of this study is to estimate quantitatively lateral pressure of super-workable fresh concrete applied to form-work of prototype structures, such as tall wall, retaining wall and beam. As a result of this experiment, a function applicable to design a form work system and to predict lateral pressure curve is formulated . Super-workable concrete may be used for the structures reinforced with dense re-bar like box culvert to place concrete at a time, and this study for lateral pressure of super-workable concrete may be useful for form design.

  • PDF

A Method of All-Weather Construction Application in Construction Sites (건설분야 전천후 공법 적용방안)

  • Lee, Han-Woo;Lee, Byung-Soo;Bang, Chang-Joon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.11a
    • /
    • pp.193-194
    • /
    • 2012
  • Construction work is affected by the weather; e.g. snowfall, rainfall and low-high ambient temperature, especially at a site in a severe climate. The influence of the weather is one of the possible reasons for delays in a construction schedule and quality deterioration. To protect the worksite from severe weather conditions, the temporary roof and wall could be installed on the outside of main structures designed in advance and the temporary structures could be took down after a period use. The greater coverage all-weather construction method is applied, the larger the effect. so, it is important and needs that the temporary roof and wall can be widely applied, designed to effectively about structure and layout.

  • PDF

Anchor plate design for mechanical anchorage of large diameter reinforcement in nuclear containment buildings (원전 구조물용 대구경 철근의 기계적 정착을 위한 정착판 설계)

  • 이성호;천성철;오보환;박형철;나환선;김상구
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2003.11a
    • /
    • pp.136-139
    • /
    • 2003
  • The re-bar work in the construction of nuclear power plants is difficult, due to the large diameter and the congestion of reinforcements. The mechanical anchorage offers a potential solution for this problem. However, the requirements or the standards for the shape of anchor plate of mechanical anchor has not been clearly established up to now. In this paper, the required performance of the mechanical anchorage for large diameter reinforcements in nuclear power plants are proposed, and the anchor plates are designed through nonlinear finite element analysis. The diameters of anchor plate are determined to be $\sqrt{5}$ times of reinforcement diameter for longitudinal reinforcements and $\sqrt{10}$ for shear reinforcements. The thickness of anchor plates is optimized as 0.3-0.35 times of reinforcement diameter for longitudinal reinforcements and 0.5~0.56 times for shear reinforcements.

  • PDF

Experimental Study on the Performance Characteristics of Air Hybrid Engine (Air hybrid 엔진의 구동 특성에 관한 실험적 연구)

  • Lee, Yong-Gyu;Kim, Yong-Rae;Kim, Young-Min;Park, Chul-Woong;Choi, Kyo-Nam;Jeong, Dong-Soo
    • Journal of the Korean Institute of Gas
    • /
    • v.15 no.5
    • /
    • pp.50-56
    • /
    • 2011
  • A preliminary experimental study of new concept air hybrid engine, which stores compressed air in the tank during braking and re-use it to propel vehicle during crusing or acceleration, was carried out in this study. A single cylinder engine was modified to realize the concept of air hybrid engine. Independent variable valve lift system was adopted in one of the exhaust valves to store the compressed air into the air tank during compression period. An air injector module was installed in the place of spark plug, and the stored compressed air was supplied during the expansion period to realize air motoring mode. For air compression mode, the tank with volume of 30 liter could be charged up to more than 13 bar. By utilizing this stored compressed air, motoring work of 0.41 bar of IMEP(Indicated mean effective pressure) at maximum can be generated at the 800rpm conditions, which is higher than the case of normal idle condition by 1.1 bar of IMEP.

A Study on the Improvement of the Prefab Form Re-Bar Method (PF/R 공법의 문제점 분석을 통한 개선방안에 관한 연구)

  • Choi, Hyoung-Kyu;Suh, Jo-Seph;Park, Keun-Joon;Cho, Young-Jun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.377-380
    • /
    • 2007
  • Formwork is a very important work in the construction. Various research and development about formwork has been going on, many methods are developed. And the effort to reduce the cost has been progressed at oversea. And a lot of attempts have been in motion in domestic field. But the systematic researches to apply to field are scarced. So, some problems pointed out at the stage of application. Therefore through comparison analysis of other formwork problems are derived and it's solution were suggested in this study.

  • PDF

Comparison of Pure Reinforcement Quantity to Development & Splice Reinforcement Quantity using High-strength Reinforcing Bars (고강도 철근 사용에 따른 순수 철근량에 대한 정착 및 이음 철근량 비교)

  • Cho, Seung-Ho;Na, Seung-Uk;Roh, Young-Sook
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.22 no.1
    • /
    • pp.72-80
    • /
    • 2018
  • Whilst it is common to construct high-rise buildings and long-span structures in the construction and building industry, there might be a number of problems such as excessive re-bars arrangement, deterioration of concrete quality, unnecessary quantity take-off and so forth. As these types of buildings and structures are getting more popular, it is widespread to apply high-strength materials such as high-strength concrete and re-bars to sustain durability and stability. This research aims to investigate the effectiveness of the high-strength reinforcing bars on the underground parking in a rigid-frame structure. In this study, the reinforcing bars with different yield strength were applied to corroborate the usefulness and practicability of the high-strength re-bars on the underground parking in a rigid-frame structure. The test results show that the quantity of reinforcement bars is lowered, as the yield strength of the re-bars are grown in general. However, the quantity of reinforcement bars on the development and splice has a tendency to increase slightly. Despite of the increase of the development and splice, the total quantity of reinforcing bars was reduced since the increasing ration of the pure quantity is higher than the development and splice. Base on the test results, it would be possible to achieve the reduction of reinforcing bars arrangement and lowering the amount of work to be done during a construction phase. Moreover, the reduced amount of bar arrangement will make it possible to improve workability and constructability of reinforced concrete structures. Ultimately, we will be able to attain improved quality and efficiency of construction using reinforced concrete.