• Title/Summary/Keyword: railway truss bridge

Search Result 35, Processing Time 0.024 seconds

Connection stiffness reduction analysis in steel bridge via deep CNN and modal experimental data

  • Dang, Hung V.;Raza, Mohsin;Tran-Ngoc, H.;Bui-Tien, T.;Nguyen, Huan X.
    • Structural Engineering and Mechanics
    • /
    • v.77 no.4
    • /
    • pp.495-508
    • /
    • 2021
  • This study devises a novel approach, namely quadruple 1D convolutional neural network, for detecting connection stiffness reduction in steel truss bridge structure using experimental and numerical modal data. The method is developed based on expertise in two domains: firstly, in Structural Health Monitoring, the mode shapes and its high-order derivatives, including second, third, and fourth derivatives, are accurate indicators in assessing damages. Secondly, in the Machine Learning literature, the deep convolutional neural networks are able to extract relevant features from input data, then perform classification tasks with high accuracy and reduced time complexity. The efficacy and effectiveness of the present method are supported through an extensive case study with the railway Nam O bridge. It delivers highly accurate results in assessing damage localization and damage severity for single as well as multiple damage scenarios. In addition, the robustness of this method is tested with the presence of white noise reflecting unavoidable uncertainties in signal processing and modeling in reality. The proposed approach is able to provide stable results with data corrupted by noise up to 10%.

Static and Free Vibration Analyses of Hybrid Girders by the Equivalent Beam Theory (등가보 이론을 이용한 복합 거더의 정적 및 자유진동 해석)

  • Choi, In-Sik;Ye, In-Ho
    • Journal of the Korean Society for Railway
    • /
    • v.10 no.5
    • /
    • pp.600-606
    • /
    • 2007
  • 3D finite element analyses of a corrugated steel web girder and a steel truss web girder are conducted to investigate the static and dynamic behaviour of the hybrid girders. And the analyses results are compared with those by the equivalent beam theory. The equivalent theory is a theory that all section properties of a truss structure are replaced by section properties of a beam including a shear coefficient. When applying the equivalent beam theory, the shear coefficient of the corrugated steel web girder is estimated as the area ratio of flange section to web section and that of the steel truss web girder is calculated by the equation proposed by Abdel. Static deflections and natural frequencies by 3D finite element analyses and those by the equivalent beam theory are in good agreement.

Fatigue Crack Propagation in Coped Stringers of Steel Railway Bridges (강철도교 바닥판 세로보 절취부의 피로균열 진전해석)

  • Choi, Dong-Ho;An, Woo-Sung;Choi, Hang-Yong
    • Proceedings of the KSR Conference
    • /
    • 2003.10b
    • /
    • pp.557-562
    • /
    • 2003
  • The responses of the floor system of a railway bridge are investigated for fatigue life prediction of damaged members using fracture mechanics approach. Numerical analysis of the structure is performed in order to see the influence of track-structure interaction and continuity of the truss connection on the response of the bridge members. Fatigue crack growth analysis is carried through equivalent stress obtained from time-history analysis. The results of time-history analysis agree with measured responses. The fatigue propagation life increases as the curvature in the coped stringer increases.

  • PDF

The Plan & Design for Through Plate Girder Bridge of Variable Section (변단면 하로판형교의 계획 및 설계)

  • Min, Young-Taek;Kim, Sung-Yeol;Ko, Seung-Young;Kim, Young-Sang
    • Proceedings of the KSR Conference
    • /
    • 2006.11b
    • /
    • pp.530-537
    • /
    • 2006
  • Recently, the railroad route plan is trying to minimize the damage of the local resident which is caused by railroad construction. For this reason, reducing the banking height of soil roadbed, lowering the bridge girder height of a solid intersection and a part of cross river, the through bridge type which can achieve a required span length must apply. The representative through bridges of railroad are arch bridges, truss bridges and plate girder bridges, the through plate girder bridge of variable section can apply that the span length of these bridges is about $30{\sim}50m$, namely, middle span length bridge types, and that can satisfy structural capacity and beauty of railroad at the same time. This paper introduces plan and design process of the Su-eo cheon bridge applied by a through plate girder bridge type of the Jinju-Gwangyang double track 6th construction ordered at Korea Rail network Authority in 2005.

  • PDF

Measurement during Construction of Nakdong Bridge by Incremental Launching Method (낙동강교 ILM 가설에 따른 시공 중 계측)

  • Kim, Hyung-Tae;Cho, Nam-So;Jung, Ji-Man;Yang, Sung-Man
    • Proceedings of the KSR Conference
    • /
    • 2007.11a
    • /
    • pp.575-580
    • /
    • 2007
  • As the volume of traffic in southern part of the republic of Korea grew, expansion of transportation was required. In that purpose, the railway between Samnangjin and Gwangyang is being extended to a double-track line. This construction includes Nakdong bridge located across Nakdong river. This truss bridge is constructed in incremental launching method (ILM) and composed of two sections, straight line and curved one. Bridge construction in the method goes with the shift of roller supports which results in the change of structural system. To accomplish safe construction, the measurement during the whole launching stages. The locations of member in severe condition and the corresponding response values were estimated through the preliminary construction stage analysis. Based on the analysis, the measurement during construction was planned. Several sensors and measurement devices were installed at appropriate locations. During the whole launching stages, the measurement was performed and the corresponding data were monitored and stored in real time. The comparison of the responses from the analysis and the measurement showed no indication of yielding of the structural members. Consequently, the construction of Nakdong bridge was concluded to be relevant.

  • PDF

Analysis of Track-Bridge Interaction and Retrofit Design for Installation of CWR on Non-ballasted Railway Bridge (무도상 철도교 레일 장대화를 위한 궤도-교량 상호작용 해석 및 개량방안 분석)

  • Yoon, Jae Chan;Lee, Chang Jin;Jang, Seung Yup;Choi, Sang Hyun;Park, Sung Hyun;Jung, Hyuk Sang
    • Journal of The Korean Society For Urban Railway
    • /
    • v.6 no.4
    • /
    • pp.383-392
    • /
    • 2018
  • This study investigated the change of additional axial stress of rail and reaction force at bridge bearings due to the track-bridge interaction when laying CWR on non-ballasted railway bridges including truss bridges with relatively long span. According to the results of the present study, additional axial stresses of rail and reaction forces at bridge bearings showed a large increase when CWR is installed on the non-ballasted railway bridge. The additional axial stress of rail can be acceptable if sufficient lateral resistance can be obtained. However, if the reaction force increases, there is a risk of damage of the bearing or pier, and therefore, it is necessary to take measures to mitigate the reaction force. It is found that additional axial stress of rail decreases when considering the frictional resistance of the bridge movable support, but its effect on the bearing reaction force is very small. On the other hand, when the longitudinal track restraint decreases, both additional axial stress of rail and bearing reaction force are reduced to a large extent. Also, when the ZLR fastening devices are applied to the region where the additional axial stress of rail is highest, bearing reaction force as well as additional axial stress of rail greatly decreased. Therefore, the application of ZLR fastening devices with the reduction of the longitudinal track restraints is very effective for installing CWR on non-ballasted railway bridges.

A Study on Hot Spot stress in welded joints of steel Tubular truss (강관 트러스 연결부 Hot Spot 응력에 관한 연구)

  • Jang, Woo-Sun;Chung, Jee-Seung;Ahn, Young-Soo;Yoon, Sik-Jae;Yang, Seong-Don;Park, Gyeong-Jun
    • Proceedings of the KSR Conference
    • /
    • 2010.06a
    • /
    • pp.1430-1436
    • /
    • 2010
  • Tubular member is hollow and is an excellent source of structural member with great buckling resistance and tortional resistance. With its development and simplicity in structure, steel tubular truss has the ability to be structured in long span bridges, without a stiffener. Recently, it has been used in many countries in Europe, Canada, Japan, and the US with the help of international committees such as CIDECT(International Committee for the Development and Study of Tubular Structures and International Institute of Welding). The most important problem when using the tubular member is the fact that it is difficult to test the fatigue stress determined by nominal stress, since geometrical stress concentration occurs due to the welded joint's nod of complexity. The purpose of this study is to compare and examine current theories and widely applied Hot Spot stress determinations through finite element analysis, which is about welded joints of steel tubular truss. We would like to suggest a way of design practice which involves a bridge plan with rarely domestically used steel tubular truss` basic research data as well as considering the future of tubular member.

  • PDF

A Study on the Expection of the Stress to the Stiffness Variation of Members on Truss Railway Bridge (부재의 강성변화에 따른 강철도 트러스 교량의 발생응력 예측에 관한 연구)

  • Cho, Sun Kyu
    • Journal of Korean Society of Steel Construction
    • /
    • v.9 no.4 s.33
    • /
    • pp.535-541
    • /
    • 1997
  • It is proper that the load distribution and the actual stress of members is analyzed by field measurement in estimating to the behavior of truss railway bridges, but those procedures are very difficult. So, the studies for the deduction of the stress, using the indirect data which are able to get from the research and investigation without field measurement, are needed. In this study, to investigate quantitically the variation of the stress of members, the stresses are obtained from the simulation which is considered the the reduction of the section area and the stiffness due to the corrosion and the degree of the stress ratio and the distribution is calculated. As the results, the stress of truss members is almost lineary increased to the decreasing of the area and the lower chord is greatly affected. And the increasing of the stress is predicted by the superposition to the results of the amount of that in each members.

  • PDF

Long Term Behavior and Analysis of Full Span Precast Segmental Bridge (풀스팬 프리캐스트 세그먼트 교량의 해석 및 장기거동 해석)

  • 오병환;채성태;정상화;박지언
    • Proceedings of the KSR Conference
    • /
    • 1999.05a
    • /
    • pp.434-441
    • /
    • 1999
  • The newly proposed Precast Segmental Mettled (PSM), which makes use of precast elements for election, is relatively new, efficient and fast mettled for the construction of prestressed box girder bridges. A precast segment of 25m long pretensioned in the fabrication yard is transported by a special trailer and a launching truss to its final position. The segments are then connected in the site by post-tensioning to make a continuous prestressed concrete box girder bridges. The purpose of this parer is to analyze and evaluate the design of precast prestressed concrete box girder bridges. The detailed analyses including time-dependent behavior of PSM bridges are conducted. The major results and findings, which have been obtained from finite element analysis of PSM bridge, are discussed in this paper and these results will be a good base for the design and analysis of a new precast bridges.

  • PDF

Identification of moving train loads on railway bridge based on strain monitoring

  • Wang, Hao;Zhu, Qingxin;Li, Jian;Mao, Jianxiao;Hu, Suoting;Zhao, Xinxin
    • Smart Structures and Systems
    • /
    • v.23 no.3
    • /
    • pp.263-278
    • /
    • 2019
  • Moving train load parameters, including train speed, axle spacing, gross train weight and axle weights, are identified based on strain-monitoring data. In this paper, according to influence line theory, the classic moving force identification method is enhanced to handle time-varying velocity of the train. First, the moments that the axles move through a set of fixed points are identified from a series of pulses extracted from the second derivative of the structural strain response. Subsequently, the train speed and axle spacing are identified. In addition, based on the fact that the integral area of the structural strain response is a constant under a unit force at a unit speed, the gross train weight can be obtained from the integral area of the measured strain response. Meanwhile, the corrected second derivative peak values, in which the effect of time-varying velocity is eliminated, are selected to distribute the gross train weight. Hence the axle weights could be identified. Afterwards, numerical simulations are employed to verify the proposed method and investigate the effect of the sampling frequency on the identification accuracy. Eventually, the method is verified using the real-time strain data of a continuous steel truss railway bridge. Results show that train speed, axle spacing and gross train weight can be accurately identified in the time domain. However, only the approximate values of the axle weights could be obtained with the updated method. The identified results can provide reliable reference for determining fatigue deterioration and predicting the remaining service life of railway bridges.