• 제목/요약/키워드: railway signaling systems

검색결과 116건 처리시간 0.032초

The Influence of Coupling Coefficient between Wayside Transmitter and On-board Receiver upon Operation Characteristics of the ATS System

  • Kim, Min-Seok;Kim, Min-Kyu;Lee, Sang-Hyeok;Lee, Jong-Woo
    • International Journal of Railway
    • /
    • 제4권1호
    • /
    • pp.12-18
    • /
    • 2011
  • The ATS system is used to provide wayside signaling. Currently, the oscillation frequency is set at 78[kHz] in the normal state. As the on-board receiver crosses over the wayside transmitter, the oscillation frequency is changed by capacitors of the wayside transmitter in a manner dependent on the train speed. As the oscillation frequency is changed, the waveform is modified in the wayside transmitter as well as in the on-board receiver. When there are other signal systems such as a ATO system present near the wayside transmitter, frequency interference occurs. This phenomenon arises since other signals or communication frequencies present will be included in the waveform. Trains often stop due to these other frequencies included in the waveform. In this paper, a model of the interaction between the wayside transmitter and on-board receiver is suggested and frequency response in the wayside transmitter and on-board receiver in the presence of the other signals are estimated by the coupling coefficient. Also, the coupling coefficients are estimated, and the optimal value is proposed.

철도산업에서 AI기반 예측 유지보수를 위한 사례 연구 및 시사점 (Case study and implications for AI-powered predictive maintenance in the railroad industry)

  • 박은경
    • 한국전자통신학회논문지
    • /
    • 제19권4호
    • /
    • pp.693-700
    • /
    • 2024
  • 본 연구는 철도 산업에서 AI 기반 예측 유지보수의 개념과 적용 사례를 분석하고, 이를 통해 얻을 수 있는 시사점을 도출하는 것을 목적으로 한다. 한국철도공사와 서울교통공사의 AI 기반 유지보수 시스템 도입 사례를 중심으로, AI 기술이 철도 운영의 효율성과 안전성을 어떻게 향상시키는지 살펴보았다. 또한, 독일의 Deutsche Bahn과 프랑스 SNCF의 사례를 통해 유럽 철도 산업에서의 AI 기술 적용 현황을 비교 분석하였다. 연구 결과, AI 기반 예측 유지보수는 고장 발생 빈도를 줄이고, 유지보수 비용을 절감하며, 철도 운영의 신뢰성을 높이는 데 기여하는 것으로 나타났다.

Restarting Trains Under Moving Block Signaling - An Expert System Approach

  • K, K.-Wong;Akio, Katuki
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 제어로봇시스템학회 2001년도 ICCAS
    • /
    • pp.96.6-96
    • /
    • 2001
  • A high peak power demand at substations will result under Moving Block Signalling (MBS) when a dense queue of trains begins to start from a complete stop at the same time in an electrified railway system. This may cause the power supply interruption and in turn affect the train service substantially. In a recent study, measures of Starting Time Delay (STD) and Acceleration Rate Limit (ARL) are the possible approaches to reduce the peak power demand on the supply system under MBS. Nevertheless, there is no well-defined relationship between the two measures and peak power demand reduction (PDR). In order to attain a lower peak demand at substations on different traffic conditions and system requirements, an expert system is one of the possible approaches to procure the appropriate use of peak demand reduction measures ...

  • PDF

철도신호용 통신 프로토콜의 적합성 시험도구 개발에 관한 연구 (A Study on Conformance Test Tool of Communication Protocol for Railway Signaling Systems)

  • 이재호;황종규;서미선;김성운
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2004년도 하계학술대회 논문집 B
    • /
    • pp.1418-1420
    • /
    • 2004
  • 비정형적인 방법에 의해 설계되어진 프로토콜은 불확실성과 오류를 내포하고 있을 수 있으며, 이러한 특성은 프로토콜의 안전성에 매우 심각한 영향을 미치게 된다. 또한 구형되어진 프로토콜 명세에 만족하게 구현되어졌는지를 확인하는 것 또한 프로토콜 엔지니어링에서 매우 중요한 부분이다. 즉, 프로토콜 명세의 정형검정과 적합성 시험은 프로토콜 개발 과정에서 매우 중요한 부분이다. 본 논문에서는 유한상태 레이블 천이시스템(LTS Labeled Transition System)으로 명세화된 철도 신호제어용 프로토콜 Type 1 모델에 대한 적합성 시험을 위하여 프로토콜 제어흐름을 IOFSM으로 모델링하였으며, 이 명세로부터 UIO 방법에 의한 적합성 시험계열 생성방법을 제시하였다. 또한, 프로토콜 검정 및 적합성 시험 방법을 실제 프로토콜의 정확성을 분석하는 데 사용할 수 있도록 프로토콜 검정기와 시험기를Windows 환경하에서 GUI기능에 의해 Window상에 구현되도록 하여 프로토콜 명세의 정확성을 평가할 수 있게 하였다.

  • PDF

안전분석 기법과 SysML 기반의 아키텍처 산출물의 연계성 확보를 통한 BCT 시스템의 안전 무결성 확보에 관한 연구 (On Ensuring the Safety Integrity of the BCT System through Linkage Safety Analysis Techniques and SysML-based Architecture Artifact)

  • 김주욱;오세찬;심상현;김영민
    • 한국산학기술학회논문지
    • /
    • 제17권8호
    • /
    • pp.352-362
    • /
    • 2016
  • 오늘날 산업 기술의 발달에 따른 고도화로 인해, 최근 우리 사회에 고속열차에 이어 무인운영 도시철도에 이르기까지 다양한 열차 시스템들이 개발 및 운용되고 있는 추세에 있다. 특히, 본 연구에서 대상으로 다룬, 도시철도 도메인에서는 기존 철도차량에 대해서 신호 제어 시스템을 운용하는 환경에서 보다 복잡화된 운용개념을 지원하기 위한 신규 신호 시스템 체계의 도입이 필요로 하고 있다. 또한, 기존의 존재하지 않은 컨셉을 바탕으로 개발되는 신호 시스템은 철도를 이용하는 승객들의 인적 피해를 최소화하기 위한 노력이 필요로 하고 있다. 본 연구에서는 신규 시스템 개발에 참여하는 다양한 도메인 엔지니어로 하여금 동일한 시각 제공과 통합된 방법론을 바탕으로 효율적인 신호시스템 설계 및 안전 활동을 위한 방법론을 제시 하고자 한다. 따라서, 서로 상이한 도메인 영역의 연계성 확보를 통해 향후 신규 시스템 설계시 보다 안전성 확보를 통한 설계적 무결성을 확보할 수 있는 방법론이 될 수 있을 것이다.

한국형 틸팅차량 완화곡선 주행시 궤도작용력 발생경향 분석 (Analysis of Occurrence Tendency of Rail Force According to Running the Hanvit 200 Train on Transition Curve Track)

  • 박용걸;최승룡;김연태;최정열
    • 한국철도학회논문집
    • /
    • 제12권5호
    • /
    • pp.678-686
    • /
    • 2009
  • 국내에서 개발된 한국형 틸팅열차는 현재 시제차량 제작을 마치고, 충북선을 시작으로 시운전 시험이 단계적으로 진행되고 있다. 시운전 시험에서는 한국형 틸팅열차의 시스템 안정화를 위해 차량 외에 궤도, 구조물, 전차선, 신호 등 각 시스템 상호간의 인터페이스 검증이 필요하며, 선로구축물 분야에서는 개발차량의 증속이 궤도구조에 미치는 영향을 비롯한 궤도부담력 검토를 통해 궤도구조의 안정성과 주행안정성 평가가 수행되어야 한다. 따라서 본 연구에 서는 완화곡선구간을 주행하는 틸팅차량(한빛200호), 고속차량(KTX) 및 일반차량(무궁화)에 의해 궤도에서 발생하는 동적 윤중 및 횡압을 측정하였다. 측정데이터를 통해 차종별 주행패턴을 비교하고 윤중과 횡압의 증감율을 확률적으로 분석하였다. 분석결과, 고정식 대치구조를 갖는 기존 차량의 캔트변화에 따른 발생 윤중 및 횡압의 분포범위는 일정 범위 내에서 작은 편차로 분포하였다. 반면 진자식 대차구조인 틸팅차량의 경우 캔트변화에 따른 차체의 틸팅작용에 의해 비교적 넓은 범위에 큰 편차로 궤도작용력이 분포하는 것으로 나타났다.

시스템엔지니어링 기법 적용에 따른 경량전철시스템 요구사항체계 구축에 관한 연구 (A study on System Requirement Structure of LRT's System on the advanced Systems Engineering)

  • 허재훈;배준호;최원찬;배성훈;주지영
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2011년도 정기총회 및 추계학술대회 논문집
    • /
    • pp.1523-1529
    • /
    • 2011
  • Light Rail Transit is system that offer target Performance and function because various sub-system such as vehicles, power supply, signaling, communication, mechanical, track, civil is consisted as large complex system. Light Rail Transit and the complex system of safety, reliability to be a behavior, and target performance and function properly to system's configuration, design, manufacture, installation and test verification, through operations system requirements to accurately describe what It is more important. With this study, light rail system KSX ISO/IEC 15288 system life cycle process by applying engineering techniques utilizing light rail system in the early stages of construction from the concept, design, production, operation, maintenance and end-use to the disposal stage throughout the entire life cycle, from the beginning of construction until the end of construction of the stakeholder to define requirements, analyze the introduction of the system developers and system requirement of those who wish to be described accurately by selecting the best system and system requirement in order to achieve their purpose.

  • PDF

철도신호시스템에서 고신뢰성을 갖는 이더넷 기반 네트워크 (Reliable Ethernet-based Network for Railway Signaling Systems)

  • 조현정;황종규;이강미;이재호
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2006년도 춘계학술대회 논문집 전기기기 및 에너지변환시스템부문
    • /
    • pp.293-295
    • /
    • 2006
  • 철도 신호제어시스템은 철도의 선로변에 위치하면서 열차의 안전운행을 책임지는 매우 중대한 시스템이다. 이러한 신호제어장치들은 각자의 고유의 기능을 수행하면서 다른 제어장치들과 링크되어 하나의 신호제어시스템으로 구성되어진다. 요즘 철도신호시스템에 사용되는 각 장치들이 전자화되어감에 따라 철도신호장치들간 정보전송을 위한 네트워크에 대한 중요성이 증대되었다. 철도신호시스템과 같은 고신뢰성이 요구되는 시스템에서 실시간 요구조건과 신뢰도를 만족시킬 수 있는 네트워크 기술에 대한 필요성 또한 증대되고 있다. 가장 널리 쓰이는 기술인 이더넷은 프로토콜 자체의 랜덤 특성으로 인해 실시간 요구사항을 만족하지 못하였으나 최근 들어 스위치드 이더넷으로 진화하면서 산업용 제어시스템에 이더넷 기술이 적용되고 있다. 본 논문에서는 이러한 스위치드 이더넷의 이론적 해석을 통해 철도신호시스템에 적용 가능성을 확인하였고, 네트워크에 결함발생 시 결함검지 및 회복 알고리즘이 포함된 높은 신뢰성을 가진 이더넷 기반 네트워크 알고리즘과 모의시험을 통한 그 성능을 분석하였다.

  • PDF

Noise Prediction Based on Analysis of Noise Measured Near the Turnout System of Existing Railroad

  • Eum, Ki-Young
    • The Journal of the Acoustical Society of Korea
    • /
    • 제28권1E호
    • /
    • pp.23-28
    • /
    • 2009
  • At the crossings of turnout systems, noise is generated by the impact of train on the connection points. However, rapid movement changes between rail and wheels on connection point are inevitable on existing turnout section which may cause safety concern as well as noise problem caused by repeated impact load by passing train. And given the turnout is a complicated system which combines various functions such as rolling stock, trackbed, signaling, communication and electrical system, it's very difficult to expect to improve the overall performance of the turnout in such a way of optimizing only particular part of such integrated system. Since the turnout is the only movable section among the integrated parts and has complicated structure that inevitably brings about quick and sudden movement, safety has been still put on the top of the list. This study was aimed at comparing and analyzing the noise data obtained around the turnout of existing railway, by categorizing them into tilting train, high speed train and traditional train, and by distance, speed and type of turnout. And based on the data measured, the forecast of noise level when tilting train accelerates around a turnout was conducted in the study.

틸팅차량 증속에 따른 기존선 궤도의 거동 특성 (Characteristics of Track Behaviors according to Accelerated Tilting Train Speed)

  • 신태형;최정열;엄기영;박용걸
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2008년도 춘계학술대회 논문집
    • /
    • pp.1653-1661
    • /
    • 2008
  • A trial run of locally-developed tilting train has been in process on Chungbuk line since the test vehicle was first produced. For the system stabilization, interface verification among the systems including track, structure, catenary and signaling system, not to mention the rolling stock, is very crucial. In the area of wayside structure, the stability of track structure and train run shall be evaluated through the review of impact by increased speed by developed train on track structure. The study thus was intended to evaluate the impact on track while a tilting train is running the conventional line(ballast track), which is vulnerable to accelerated train speed. The evaluation of tilting train test running the part of Honam line was conducted to identify the impact on existing track performance by tilting train. To identify the performance of each part of track components while tilting train and high speed train were running the existing line, wheel load, rail bending stress, vertical displacement of rail and sleeper were compared so as to evaluate the expected impact by tilting train for improving the train speed.

  • PDF