• 제목/요약/키워드: railway maintenance

검색결과 1,064건 처리시간 0.03초

공항철도의 운영가용도 향상을 위한 RCM 활동 (RCM Activities for Improvement of Availability of AREX Railway System)

  • 이창환;임성수;송미옥
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2008년도 춘계학술대회 논문집
    • /
    • pp.742-747
    • /
    • 2008
  • This paper is described the systematic activities of RCM to improve the availability for AREX railway system. The purpose of these activities are to maintain and enhance the reliability, availability, maintainability and safety, and to implement the effective maintenance for electrical and mechanical system including rolling stock, signalling, telecommunication, power supply, overhead catenary and platform screen door with impact to train operation.. The main activities consist of systematic failure and repair recording by integral information system, analysis and corresponding countermeasure. As applying these activities in opeartion and maintenance works, the availability of AREX railway system is going on improvement gradually, and maintenacne works are improved with these results.

  • PDF

고속철도 궤도검측 자료 분석기법에 관한 연구 (A Study of Analysis Method for the Track Geometry Measuring Data on High Speed Railway)

  • 강기동
    • 한국철도학회논문집
    • /
    • 제7권4호
    • /
    • pp.291-295
    • /
    • 2004
  • The Track geometry measuring on High-speed railway is the most important subject for the track construction and track maintenance work. Also the measuring accuracy is so significant part because it provides principle data for the maintenance plan and the assesment of working quality and can control the train speed limitation. From this point of view, it is very important to verify for the track recording coach(EM120) in KNR. According to the result of spectrum analysis, the noise near 1m waveband was found on the track recording data from EM120. So, New filter has been applied to remove the noise form track recording data. and it makes possible to acquire resembling result to real track geometry.

영상처리를 이용한 가동브래킷 변형 검사 기법에 대한 연구 (A Study on Cantilever Deformation Inspection Method Using Image Processing)

  • 한승훈;조민수;유영기;이병곤
    • 전기학회논문지
    • /
    • 제66권6호
    • /
    • pp.988-994
    • /
    • 2017
  • The risk of facilities in catenary is increasing because the railway section extension and high-speed train service. And visual check of workforce is not enough time to maintain the extensive railway facilities. Accordingly, The technical development trend of maintenance of railway facilities can be seen by automation and application of IT technology, especially the mechanization work and the information technology are spreading in the maintenance work of the train line solved by manpower. In this paper, we describe the method by obtaining the cantilever image using acquisition device and pole inspection system in high speed vehicle, to check the variation of the cantilever component using image processing.

차륜 낭비요인 개선을 위한 경제적 차륜관리방안 연구 (A study on economical wheel maintenance process to improve waste factors)

  • 허현무;권성태;김형진;윤춘한
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2003년도 춘계학술대회 논문집
    • /
    • pp.656-662
    • /
    • 2003
  • The rolling-stocks used in conventional line have suffered wheel problems due to lack of adaptability with track. These brought out severe wheel wear and inefficiency of wheel maintenance. Especially, tight wheel maintenance criteria have caused waste factors of wheel machining, these increases rolling-stock maintenance costs. Thus, this study was started to Propose the wheel maintenance plans to improve maintenance efficiency in respect to wheel maintenance process in rolling-stock workshop. Here, we describe some results

  • PDF

실동하중에 의한 강판형철도교의 응력빈도해석 (Stress Histogram Analysis of Steel Plate Girder Railway Bridge due to Service Load Histories)

  • 황인구;김연태
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2004년도 추계학술대회 논문집
    • /
    • pp.928-933
    • /
    • 2004
  • Despite the number of steel bridges being under in service more than 50 years reaches about 50$\%$ in present, the quantitative estimation in maintenance on steel railway bridges is not possible because a ton of the field data in the bridges have not been plentifully accumulated. Therefore, a series of field tests on the steel plate girder bridge, the typical types of steel railway bridges, are executed, and the stress characteristics of main members in steel plate girder railway bridges are quantitatively estimated in this study.

  • PDF

고속철도 시스템의 레일 전위 상승 해석 (Analysis on Voltage Rise of Rail in High speed Railway System)

  • 이종우
    • 대한전기학회논문지:전력기술부문A
    • /
    • 제52권8호
    • /
    • pp.481-485
    • /
    • 2003
  • In electric railway system, potential of rail has been risen, for return-current flows through rail. The magnitude of rising voltage is different to railway feed system, ground admittance of rail and the load current. If rising voltage of rail is large, electric shock can be occurred to passengers and maintenance- worker, In this paper, we estimate the rising voltage of rail in high speed railway system and check the safety to human beings.

Worn Wheel/Rail Contact Simulation and Cultivated Shear Stresses

  • Noori, Ziaedin;Shahravi, Majid;Rezvani, Mohammad Ali
    • 한국철도학회논문집
    • /
    • 제16권2호
    • /
    • pp.93-98
    • /
    • 2013
  • Railway system is today the most efficient way for transportation in many cases in several forms of application. Yet, wear phenomenon, profile evolution, fatigue, fracture, derailment are the major worries (financial and safety) in this system which force significant direct and indirect maintenance costs. To improve the cyclic maintenance procedures and the safety issues, it can be very satisfactory to be informed of the state of wheel/rail interaction with mileage. In present paper, an investigation of the behavior of the shear stresses by logged distance is approached, by implementing the field measurement procedure, in order to determine the real conduct of the most important cause of defects in wheel/rail contact, shear stress. The results coming from a simulation procedure indicate that the amounts of shear stresses are still in high-magnitudes when the wheel and rail are completely worn; even though in simulation based on the laboratory measurements of profile evolutions, the stresses become significantly reduced by logged distance.

철도 위험도 통합 평가 방법 및 도구 개발 (Development of Integrated Method and Tool for Railway Risk Assessment)

  • 한상훈;안광일;왕종배;이호중
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2006년도 추계학술대회 논문집
    • /
    • pp.1132-1139
    • /
    • 2006
  • Railway risk is evaluated by a method of linking event trees and fault trees as the general PSA(Probabilistic Safety Assessment) model for the risk assessment of complex systems. Accident scenarios causing undesirable events are modeled by event trees comprised of several accident sequences. Each branch located in the accident progression of the event tree is modeled by an fault tree or can be represented by some value too simply. We usually evaluate the frequency of the whole sequence by adding them after calculating the frequency of each sequence at a time. However, since there are quite a number of event trees and fault trees in the railway risk assessment model, the number of sequence to evaluate increases and preparation for the risk assessment costs much time all the more. Also, it may induce errors when analysts perform the work of quantification. Therefore, the systematic maintenance and control of event trees and fault trees will be essential for the railway risk assessment. In this paper we introduce an integrated assessment method using one-top model and develop a risk assessment tool for the maintenance and control of the railway risk model.

  • PDF

선로전환기 예방정비 현황 및 개선 방안에 관한 연구 (A Study on the Existing State of Preventive Maintenance and the Improvement Measures for a Point Machine)

  • 이인현;김대현;김민호;서정욱;김두일;정호형
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2011년도 춘계학술대회 논문집
    • /
    • pp.1174-1181
    • /
    • 2011
  • This paper investigates the current established preventive maintenance and its corresponding data on a point machine among railway signalling facilities and suggests a part of considerable plans when the policy of the preventive maintenance is modified. It is not appropriated to apply the optimized preventive replacement period considered with the cost simply. In that case, it is suggested that the reliability should be analyzed failure mode and effects through collecting the on-site failure data sufficiently. Then, that result can be proposed to adjust the proper criteria into the rational way by comparing the initial maintenance criteria. In this paper, the alternative way to determine the feasibility of the inspection period using failure probability is introduced.

  • PDF

CAMS에 의한 고속선 열차제어시스템의 장애 분석 (Failure Analysis of Train Control System for Hign Speed Line by CAMS)

  • 김용규;백종현;김종기;신덕호
    • 대한전자공학회:학술대회논문집
    • /
    • 대한전자공학회 2006년도 하계종합학술대회
    • /
    • pp.973-974
    • /
    • 2006
  • In this paper, Computer-aided Maintenance Equipments, which are being used in maintenance, are applied to analyze failures in train control systems, resulting in long time delays of trains. It can be expected to extend and apply CAMS (Computer Aided Maintenance System) in the hereafter efficient operation and maintenance of high-speed railway train control systems, by comparison between the analysis result of fundamental causes, from high-speed railway train control system failures occurred during the operational process, and predictive result of failure causes, based on the recording data of CAMS when failures were occurred.

  • PDF