• Title/Summary/Keyword: railroad construction

Search Result 646, Processing Time 0.028 seconds

effects of the Iron Silk Road construction on Northeast sia's economy (국제철도(철의실크로드)운송이 동북아 경제역교에 미치는 영향과 효과에 관한 연구)

  • Park Heong-Soon
    • Proceedings of the KSR Conference
    • /
    • 2005.11a
    • /
    • pp.494-499
    • /
    • 2005
  • Transportation routes by land like a human being blood vessel should exist for economic and trade exchange in Northeast Asia. Thinking from this point of view. I believe that TSR(Trans Siberian Railroad) and TCR(Trans Chinese Railroad). which will be connected with I would like to talk about .not only the effects of various international railroads and their connections but also economic activation TKR(Trans Korean Railroad). can play important roles. In this study, and effects in Northeast Asia which will be resulted from various international railroads construction. I tried to figure out comparative superiority and comparative advantage of the trade structure and industries in South and North Korea to find out the possibility of economic unification in East Asia. especial1y in Northeast Asia. This study also includes the effort to find out how trade exchange between South and North Korea can be expanded as a result of being a member of East Asia economic zone.

  • PDF

Applying BIM and GIS to Railway Maintenance Works in Taiwan

  • Liu, Li-Shih;Shr, Jin-Fang
    • International Journal of Aerospace System Engineering
    • /
    • v.2 no.1
    • /
    • pp.18-23
    • /
    • 2015
  • Based on real jobs, this study was carried out the Railway maintenance works in Taiwan. It hopes to use Geographic Information System(GIS) and Building Information Modeling(BIM) for changing the maintenance model from "post-damage repair" to "preventive maintenance". Accordingly, this research will build a Railway Repairing Database that installs all repair data. This database will also connect to GIS so that can be the source of analysis and statistic for repair paln. The main results of research are as follows: I. All data stored on cloud space that raises the ability to manage and plan on repair. II. Simplify the file work and increase the quantity of case data to the manager who can get more reliable source. III. The data offer objective judgment to avoid subjective argument. IV. Add the GIS information to improve the maintenance because of good analisis.

Controlled Low Strength Material for Emergency Restoration Using Bottom Ash and Gypsum (저회와 석고를 활용한 지반함몰 긴급복구용 고유동성 채움재 연구)

  • Lee, So-Yeon;Yoon, Hwan-Hee;Son, Min;Kong, Jin-Young;Jung, Hyuk-Sang
    • Journal of the Korean Geosynthetics Society
    • /
    • v.17 no.2
    • /
    • pp.19-31
    • /
    • 2018
  • Recently the ground subsidence which seriously weakens the safety of cities tends to increase. The purpose of this paper is to develop the materials by using industrial by-products for the application to emergency restoration process in case of ground subsidence. In this paper the laboratory tests including pH test, initial setting test, unconfined compressive strength test, and flow test were performed in order to evaluate the design properties of Controlled Low Strength Material (CLSM). The field test was carried out for evaluating the performance for the early strength of CLSM and the workability for emergency restoration. Test results showed that the strength will be too high to re-excavate the ground when the cement ratio is more than 4%. The optimum mixing ratio appears to be most effective when the mixing ratio of the bottom ash and the gypsum is approximately 50:50 and the cement content is 2%.

Standard Work Process to Reduce a Risk of Track Exchange Work for Railroad (철도 운행선 변경작업의 리스크 저감을 위한 표준작업 프로세스 도출)

  • Yoon, Chang Geun;Park, Su Yeul;Kim, Seok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.6
    • /
    • pp.131-137
    • /
    • 2021
  • Since many resources are put into the work of changing the railway operation within limited time, it is important to have a specific work plan and safety management. For this reason, the work schedule is shared in advance, and parallel work is being carried out simultaneously by rail system, such as tracks, trolly wires, and signals. However, due to the nature of the transfer work, the work is carried out at night when the railway operation is finished, and many resources are put into the limited area of the operating line, so the risk of safety accidents and failure to change the operating line is recognized as high. Nevertheless, there is still not enough research done in korea regarding the operation line change construction. Therefore, this study is conducted a survey on the track exchange work of railroad for working people, and analyzed the results of the survey. Finally, a standard work process was suggested to reduce the risk of track exchange work.

Risk analysis for sidetrack construction during subway tunnel operation (기존 지하철 터널 운영 중 대피선 건설 시공 리스크 분석)

  • Jun, Jonghun;Chung, Heeyoung;Koh, Sung-Yil;Yoon, Hee Taek;Yi, Na Hyun;Choi, Hangseok
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.22 no.4
    • /
    • pp.401-417
    • /
    • 2020
  • As an increasing demand for rapid railway transportation, the construction of sidetrack is inevitable to operate local and express trains simultaneously. However, the current technologies for the sidetrack construction method require a long construction period by interrupting the operation of the existing subway line, as well as cause a huge economic loss. Thus, it is necessary to study the sidetrack construction method under the special situation that the subway is in operation and to analyze the risk of the existing tunnel enlargement process for the sidetrack construction. Therefore, in this paper, the Government Complex Gwacheon station on Subway Line 4 was considered as a target station for the virtual sidetrack construction and the optimal sidetrack construction plan was derived. Subsequently, the application of risk management process was carried out in the order of identifying risk, risk response planning, performing a risk analysis, risk monitoring and control for potential risk events during the construction of sidetrack under the subway operation. A total of eight potential risk events and risk mitigation methods were selected, and a risk assessment matrix was established using the five-step risk probability and impact level criteria to perform the risk assessment including residual risks. Based on the results of the risk assessment, the risk grade and the reduction effect of each risk mitigation method were confirmed.

The Study of Tilting Control System for Curve Line Speed-Up (곡선선로 속도향상을 위한 열차틸팅제어장치에 관한 연구)

  • Lee, Su-Gil;Han, Seong-Ho;Song, Yong-Soo;Han, Young-Jae;Lee, Woo-Dong
    • Proceedings of the KIEE Conference
    • /
    • 2004.10a
    • /
    • pp.248-250
    • /
    • 2004
  • Tilting trains are now an established feature of railway operations throughout the world. For intercity traffic, tilt provides operators with increasing speeds, and therefore enhanced competitiveness, on existing routes where insufficient traffic or a lack of funds precludes the construction of a dedicated new high-speed railway. Appling the tilting train, we can expect 30% of speed up on existing lines, but the stability of the electric current would be low because of tilting the train. Also, the spark between the catenary and pantagraph cause environmental problems such as noise, radio wave malfunction. Therefore, the tilting on pantagraph for the power suppling device is very essential for stable electric power supply.

  • PDF

A Study on the Life Cycle Cost Analysis of Railroad Bridges (철도교량의 생애주기비용분석에 관한 연구)

  • Park Mi-Yun;Na Ok-Pin;Hwang Young-Min;Kim Dae-Young;Cho Hyo-Nam
    • Proceedings of the KSR Conference
    • /
    • 2005.05a
    • /
    • pp.574-580
    • /
    • 2005
  • Recently, the number of bridges and tunnels in railway is increasing due to the super high-speedy of train. Also, because of successively accidents of civil structures such as bridges and dams, the importance of maintenance become influential. The purpose of this study is to show the probabilistic life cycle cost analysis technique(PLCC) of the railroad bridge as pubic-infrastructures, and reasonably to indicate the economy in life cycle cost(LCC) through a case study. Rationally for life cycle cost analysis, the data gathered through many materials considered the uncertainty such as covariance. As a result, it is indicated that prestressed concrete bridge is pretty more cost-effective during life-cycle than preflex as well as steel box bridge. In future, if the construction of database and maintenance materials for railroad infrastructure is actualized, the life cycle cost analysis for railroad can be conducted easily and practically.

  • PDF

The Study of Tilting Control System for Tilting Vehicle (틸팅차량용 틸팅제어시스템 기술개발에 관한연구)

  • Lee, Su-Gil;Han, Seong-Ho;Han, Young-Jae;Lee, Woo-Dong;Song, Yong-Soo
    • Proceedings of the KIEE Conference
    • /
    • 2004.04a
    • /
    • pp.229-231
    • /
    • 2004
  • Tilting trains are now an established feature of railway operations throughout the world. For intercity traffic, tilt provides operators with increasing speeds, and therefore enhanced competitiveness, on existing routes where insufficient traffic or a lack of funds precludes the construction of a dedicated new high-speed railway. Appling the tilting train, we can expect 30% of speed up on existing lines, but the stability of the electric current would be low because of tilting the train. Also, the spark between the catenary and pantagraph cause environmental problems such as noise, radio wave malfunction. Therefore, the tilting on pantagraph for the power suppling device is very essential for stable electric power supply.

  • PDF

A Study on the Urban Transit Railway CALS System Construction (I) (도시철도 운영유지체계 정보화 시스템 구축에 관한 연구 (I))

  • Park, K.J.;Lee, H.Y.;Ahn, T.K.;Kim, W.K.;Lee, K.S.
    • Proceedings of the KIEE Conference
    • /
    • 2001.04a
    • /
    • pp.407-409
    • /
    • 2001
  • 도시철도 공사, 지하철 공사, 철도청 등 각각의 운영기관이 독자적으로 정보화를 추진함으로서 국가적으로 중복투자 및 예산이 낭비되고 각 시스템간 호환성이 부족하여 정보를 공유할 수 없어 비효율적인 시스템 구축이 이루어지고 있는 실정이며 표준화된 정보의 부재 및 부정확한 표준에 의한 업무의 비효율성이 가중되고 사고예방 및 신속한 복구지원을 통한 대국민 안전서비스 제공 및 열차운행의 안전성 확보에 미흡한 실정이다. 본 논문은 국내 도시철도분야를 세계적인 경쟁력을 가진 분야로 육성하고 수명주기비용(Life Cycle Cost)을 최소화 및 최적화하여 경제성을 극대화시킨 도시철도 정비유지체계 정보화 시스템의 개발 및 시범적용을 위해 정보전략계획 (ISP)을 수립하기 이전에 수행한 선행연구 결과이다.

  • PDF

The Study of Tilting Control System for EMU Tilting Vehicle (전기식 틸팅차량의 틸팅제어장치 구성방안 연구)

  • Lee Su-Gil;Han Seong-Ho;Song Yong Soo;Lee Woo-Dong;Han Young-Jae
    • Proceedings of the KIEE Conference
    • /
    • summer
    • /
    • pp.1457-1459
    • /
    • 2004
  • Tilting trains are now an established feature of railway operations throughout the world. For intercity traffic, tilt provides operators with increasing speeds, and therefore enhanced competitiveness, on existing routes where insufficient traffic or a lack of funds precludes the construction of a dedicated new high-speed railway. Appling the tilting train, we can expect $30\%$ of speed up on existing lines, but the stability of the electric current would be low because of tilting the train. Also, the spark between the catenary and pantagraph cause environmental problems such as noise, radio wave malfunction. Therefore, the tilting on pantagraph for the power suppling device is very essential for stable electric power supply.

  • PDF