• Title/Summary/Keyword: rail-bridge interaction analysis

Search Result 64, Processing Time 0.025 seconds

Analysis of Track-Bridge Interaction and Retrofit Design for Installation of CWR on Non-ballasted Railway Bridge (무도상 철도교 레일 장대화를 위한 궤도-교량 상호작용 해석 및 개량방안 분석)

  • Yoon, Jae Chan;Lee, Chang Jin;Jang, Seung Yup;Choi, Sang Hyun;Park, Sung Hyun;Jung, Hyuk Sang
    • Journal of The Korean Society For Urban Railway
    • /
    • v.6 no.4
    • /
    • pp.383-392
    • /
    • 2018
  • This study investigated the change of additional axial stress of rail and reaction force at bridge bearings due to the track-bridge interaction when laying CWR on non-ballasted railway bridges including truss bridges with relatively long span. According to the results of the present study, additional axial stresses of rail and reaction forces at bridge bearings showed a large increase when CWR is installed on the non-ballasted railway bridge. The additional axial stress of rail can be acceptable if sufficient lateral resistance can be obtained. However, if the reaction force increases, there is a risk of damage of the bearing or pier, and therefore, it is necessary to take measures to mitigate the reaction force. It is found that additional axial stress of rail decreases when considering the frictional resistance of the bridge movable support, but its effect on the bearing reaction force is very small. On the other hand, when the longitudinal track restraint decreases, both additional axial stress of rail and bearing reaction force are reduced to a large extent. Also, when the ZLR fastening devices are applied to the region where the additional axial stress of rail is highest, bearing reaction force as well as additional axial stress of rail greatly decreased. Therefore, the application of ZLR fastening devices with the reduction of the longitudinal track restraints is very effective for installing CWR on non-ballasted railway bridges.

Development of Reliability-Based Optimum Design of High-Speed Railway Bridges Considering Structure-Rail Longitudinal Interaction and Structure-Vehicle Interaction Using Heuristic Decision Method (Heuristic Decision Method를 이용하여 구조물-궤도 종방향 상호작용 및 구조물-차량 상호작용을 고려한 고속철도 교량의 신뢰성 최적설계 기법 개발)

  • Ihm, Yeong-Rok
    • Journal of the Korean Society of Hazard Mitigation
    • /
    • v.10 no.3
    • /
    • pp.31-38
    • /
    • 2010
  • In this study, it is suggested that it has to reliability-based design methodology with respect to bridge structure-rail longitudinal interaction and bridge structure-vehicle interaction. For the structural analysis, commercial package, ABAQUS, are used for a three-dimensional finite element analysis. The optimization process utilizes a well-known optimizer, ADS(Automated Design Synthesis). Optimization technique is utilized the ALM-BFGS method for global area search and Golden Section Method for 1-D search. In general, ALM-BFGS method don't need the 1-D search, and that algorithm converge a 0.1~0.2 of Push-Off factor. But in this study, value of Push-Off factor is used 90, therefore 1-D search should be needed for effective convergency. That algorithm contains the "heuristic decision method". As a result of optimum design of 2-main steel girder birdge with 5${\times}$(1@50m), design methodology suggested in this study was demonstrated more economic and efficient than existing design and LCC optimization not considering bridge-rail longitudinal interaction and bridge-vehicle interaction.

A Study on the Dynamic Interaction Analysis of Curved Bridge-AGT Vehicle (곡선교량-AGT 차량의 상호작용에 의한 동적 거동에 관한 연구)

  • Lee An-Ho;Kim Ki-Bong;Kim Jae-Min
    • Proceedings of the KSR Conference
    • /
    • 2003.05a
    • /
    • pp.376-381
    • /
    • 2003
  • This study is focused on the dynamic response of curved bridge when the rubber tired AGT vehicles is running with alternative articulations. For the analytic approach, there is necessary for the three dimensional vehicle model with 11 degree of freedom and the three dimensional curved bridge model by means of finite element method. It can be described by conventional Lagrangian formula with respect to the dynamic interactions between vehicles and its met bridge. The formula is implemented by Fortran language on the simulation program designated BADIA II(Bridge-AGT Dynamic Interaction Analysis II). The solutions of the formula are derived by Newmark- ${\beta}$ method. The BADIA II is for the dynamic interactions between vehicle and curved bridge in terms of the roughness of running surface and guide rail. The applicability of the BADIA II is verified in terms of displacement and modal frequency. This study is described that the dynamic interactive behaviors between the rubber tired AGT vehicle and curved bridge in terms of the radius of curvatures of curved bridge, vehicle articulations, vehicle speeds, vehicle weights, flatness of running surface and roughness of guide rail using BADIA II.

  • PDF

Rail-Structure Interaction Analysis for Simple Span Bridges of the Taiwan High Speed Railway (대만 고속전철 단순교의 레일-구조물 상호작용 해석)

  • Yong-Gil Kim
    • Journal of the Korean Society of Safety
    • /
    • v.16 no.2
    • /
    • pp.130-135
    • /
    • 2001
  • The additional stresses and displacements produced by the use of long rail, typical of the high-speed railway, are investigated for the Taiwan high-speed railway bridges. In addition, an important special feature of the Taiwan high Speed Railway Design Specifications specifies that service earthquake has to be considered during the rail-structure interaction analysis before evaluating the stresses and relative displacements of the bridge. As pound motion is taken into account under seismic event the seismic response of the structure is applied as displacement in the rail-structure interaction analysis. The stresses and relative displacements of the structure are checked according to the consideration of seismic loading.

  • PDF

Influence of Rail Supporting Spacing of Railway Bridge Deck Ends on Bridge-Track Interaction Forces (교량-궤도 작용력에 대한 교량 단부에서의 레일지지점간격의 영향)

  • Choi, Jun-Hyeok
    • Journal of the Korean Society for Railway
    • /
    • v.17 no.4
    • /
    • pp.245-250
    • /
    • 2014
  • This paper, as a study for the serviceability design of railway bridges with concrete track, presents the effects of design parameters of tracks and bridges on the forces acting on the rail supports of the track. To calculate the forces acting on the track, an unequal spacing discrete supported model with different spacing of rail supports was induced. Design parameters are the rail support spacing of expansion joints above abutments or piers of bridges, the distance from the support of a girder to the last rail support on the end of the girder, and the number of additional rail supports. The causes of the displacement of track are axial force, unit vertical displacement, and unit rotation. From the analysis, the maximum compressive force and the maximum uplifting force acting on the rail supports were determined and the effects of the rail support spacing on the forces acting on the track were presented.

Effects of Expansion of Sleeper Span at the Deck End of a Long Continuous Bridge on Train Safety and Track Stability (장대교량 신축부에서 침목간격 확대가 차량의 주행안전성 및 궤도의 구조안정성에 미치는 영향)

  • Yang, Sin-Chu
    • Transactions of the Korean Society for Noise and Vibration Engineering
    • /
    • v.25 no.9
    • /
    • pp.620-627
    • /
    • 2015
  • Long continuous bridge deck can become contracted considerably as temperature drops, which can lead to a large expansion of sleeper span at the end of it. Since this huge sleeper span then can cause problems both with safety of train operation and structural stability of tracks, it is necessary to take the issue into consideration systematically in the designing process of the bridge. In this paper, an evaluation process through the analysis of train-track interaction was presented which can basically review the effects of the expansion of sleeper span at the end of long continuous bridge deck on the safety of the train and the structural stability of the track. The analyses of the interaction between the light rail train and tracks were carried out targeting the sleeper span as a main parameter. The safety of train operation and structural stability of tracks in a light rail system due to the expansion of the sleeper span were evaluated by comparing the numerical results with the related criteria.

Evaluation of Behavior of Direct Fixation Track and Track Girder Ends on Yeongjong Grand Bridge (영종대교 강직결 궤도 및 종형거더 단부의 거동 분석)

  • Choi, Jung-Youl;Chung, Jee-Seung;Kim, Jun-Hyung;Lee, Kyu-Yong;Lee, Sun-Gil
    • Journal of the Korean Society of Safety
    • /
    • v.31 no.6
    • /
    • pp.45-51
    • /
    • 2016
  • The purpose of this study is to investigate the influence of train-induced end rotation of simple supported track girder on the performance of a direct fixation track system (DFTS) in Yeongjong grand bridge. In this study, the influences of deflection of a DFTS and track girder on dynamic rail-track girder interaction forces for the track girder ends currently employed in airport express lines were assessed by performing field tests using actual vehicles running along the service lines. Therefore, the dynamic displacement of rail and track girder and the fastener stress on the center and ends sections of DFTS were measured for two different trains (AREX and KTX) running in Yeongjong grand bridge. A three-dimensional finite element analysis (FEA) model using the time-history function based on the design wheel load was used to predict the train-induced track and track girder displacement, and the FEA and field test results were compared. The analytical results reproduced the experimental results well within about 3-7% difference in the values. Therefore, the FEA model of DFTS on track girder is considered to provide sufficiently reliable FEA results in the investigation of the behavior of DFTS. Using the analytical and experimental results, the influence of train-induced end rotation of simple supported track girder on the interaction behavior of rail and track girder installed on a simple supported track girder ends, i.e., upward displacement of rail-track girder and the fastener stress, was investigated. It was found that the train-induced end rotation effect of track girder was not significantly affected by the upward displacement of rails and the fastener stresses of track girder ends. Further, the interaction behavior of rail and track girder were similar to or less than that of the general railway bridge deck ends, nevertheless the vertical displacement of track was higher than that of conventional DFTS on the general railway bridge. From the results, the dynamic responses of the DFTS on track girder ends were not significantly affected by the safety and stability of DFTS ends.

Ground Vibration Analysis for Light Rail Transit on Bridges (교량구간에서의 경량전철에 의한 지반진동 해석)

  • 김두기;이종재;윤정방;김두훈
    • Journal of the Korean Geotechnical Society
    • /
    • v.16 no.4
    • /
    • pp.71-82
    • /
    • 2000
  • Ground vibration analysis methods for Light Rail Transit(LRT) on bridges are studied. LRT loads acting on the piers are evaluated considering interactions between trains and a bridge. Two dimensional in-plane and axisymmetric wave propagations are used in ground vibration analyses, and then the results of them are compared one another. A modified axisymmetric method is presented, which can consider the effect of the train loadings on a series of piers as the train moves. Parametric studies are carried out for various train speeds, bridge types and geotechnical conditions to investigate the characteristics of ground vibrations.

  • PDF

Additional Axial Stress of CWR Track on the Bridge according to the Variation of Design Vehicle Load (설계차량하중 변화에 따른 교량상 장대레일 궤도의 부가축응력)

  • Yun, Kyung-Min;Jeon, Byeong-Heun;Choi, Shin-Hyung;Lim, Nam-Hyou
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.16 no.1
    • /
    • pp.807-813
    • /
    • 2015
  • The CWR(Continuous Welded Rail) on a bridge shows complex structural behavior compared to those on the roadbed. The influence factors on the track-bridge interaction are the variation of temperature and vehicle load. The analysis methods for track-bridge interaction, material property, modeling method, loads and combination method are indicated in the domestic railway design principle, KR C-08080. The vehicle load in KR C-08080 was changed in 2014. In this study, to evaluate the effect of the changed vehicle load on the track-bridge interaction, the track-bridge interaction analyses were performed for 22 bridges by using finite element method.

Experimental Study on Applying a Transition Track System to Improve Track Serviceability in Railway Bridge Deck Ends (철도교량 단부 궤도의 사용성 향상을 위한 횡단궤도시스템 적용에 관한 실험적 연구)

  • Lim, Jongil;Song, Sunok;Choi, Jungyoul;Park, Yonggul
    • Journal of the Korean Society for Railway
    • /
    • v.16 no.3
    • /
    • pp.207-216
    • /
    • 2013
  • The components of concrete track (rail and rail fastening system) in railway bridge deck ends are damaged and deteriorated by track-bridge interaction forces such as uplift forces and compression forces owing to their structural flexural characteristics (bridge end rotation). This had led to demand for alternatives to improve structural safety and serviceability. In this study, the authors aim to develop a transition track to enhance the long term workability and durability of concrete track components in railway bridge deck ends and thereby improve the performance of concrete track. A time-history analysis and a three-dimensional finite element method analysis were performed to consider the train speed and the effect of multiple train loads and the results were compared with the performance requirements and German standard for transition track. Furthermore, two specimens, a normal concrete track and a transition track, were fabricated to evaluate the effects of application of the developed transition track, and static tests were conducted. From the results, the track-bridge interaction force acting on the track components (rail displacement, rail stress, and clip stress) of the railway bridge deck end were significantly reduced with use of the developed transition track compared with the non-transition track specimen.