1 |
S.C. Yang (2008) A study on the improvement of performance for concrete track interface, Research Report, Korea Railroad Research Institute, Korea Rail Network Authority, Korea.
|
2 |
H.K. Park (2009) An analysis of parameters on serviceability of concrete slab track fasteners at railway bridge deck ends, Ph.D. Thesis, Dept. of Railway Construction Engineering Graduate School of Railroad, Seoul National University of Technology, Seoul, Korea .
|
3 |
J.H. Choi (2013) Analysis of the internal forces of the rail supports for the serviceability of concrete slab track bridge, Journal of the Korean of Civil Engineers, 33(4), pp. 1303-1313.
과학기술학회마을
DOI
|
4 |
D. K. Arnold, S.B. Seo(translation) (2009) Fundamental of track dynamics 1, 2, Book Gallery, Seoul, Korea. pp. 79-105
|
5 |
D.Y. Sung, Y.H. Kim, Y.G. Park, S.I. Kim (2008) The parameter study of serviceability review of end track on railway bridge installed concrete slab track, 2008 Autumn Conference of Korean Society for Railway, Daegu, Korea, pp. 117-124.
|
6 |
DS 804 App. 29. (2009) Bridge deck ends, check for serviceability limit state of superstructure, Regulation for Railway Bridges and Other Civil Constructions, Deutch Bahn.
|
7 |
H.K. Park, S.Y. Jang, S.C. Yang, Y.G. Park (2009) A parametric study on the serviceability of concrete slab track on railway bridges, Journal of Korean Society for Railway, 12(1), pp. 95- 103.
과학기술학회마을
|