• Title/Summary/Keyword: quantity calculation

Search Result 256, Processing Time 0.025 seconds

A Study on the Development of the Guidelines for Supervision and Inspection of Earthworks Quantity Using 3D Scanning Technology (3D 스캐닝 기술을 이용한 토공사 기성관리 감독 및 검사 가이드라인 개발)

  • Lee, Young-ho;Yun, Won Gun;Park, Jae-woo
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.23 no.5
    • /
    • pp.735-746
    • /
    • 2020
  • Recently, in Korea, various technology developments have been made to utilize 3D space and facility data such as unmanned aerial vehicles (UAV) and laser scanners with the goal of improving productivity at construction sites. However, the lack of related regulations for 3D laser scanner surveying has been a barrier to using the technology across the surveying industry. As a result, owners, contractors, and construction supervisors are reluctant to introduce and apply technology to the site. In this study, the guidelines (drafting and inspection work to be supervised by construction supervisors when constructing earthworks using laser scanners) was developed and presented so that the earth surveying and quantity calculation technology using a laser scanner could be applied and diffused in a construction site. Through the development of this guideline (proposal), it is judged that the supervision and inspection of earthworks quantity using a laser scanner will be activated in the field.

Probabilistic GMP Calculation Method based on BIM (BIM기반 확률론적 GMP 산정방안에 관한 연구)

  • Go, Gun-Ho;Jin, Zheng-Xun;Kim, Hyun-Joo;Hyun, Chang-Taek
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.05a
    • /
    • pp.122-123
    • /
    • 2018
  • Recently, CM at Risk delivery system(CM@R) that could solve the problems of Design Bid Build delivery(DBB) system has been emerging. In the CM@R delivery system, the contractor negotiates for a maximum guaranteed price(GMP) with the client at the design stage, and the contractor carries out the construction within the GMP. In CM @ R, the construction company with expertise in construction participates from the design stage to reflects the construction know-how in the design. On the other hand, the modification design frequently occurs due to the change of the construction cost when negotiating the GMP. In addition, uncertainties are inherent in the GMP calculation because the calculation is based on unfinished drawings and documents. This study proposes a probabilistic GMP estimation method applying MCS to the BIM - based cost prediction model, in order to extract the accurate quantity information when estimating the GMP and to cope with the change of the construction cost inherent in uncertainty.

  • PDF

Deposition Characteristics of the Sandbar and Estimation of the Mass Transport Flux in the Nakdong Estuary (낙동강 하구역의 사주 퇴적특성과 물질수송플럭스 산정)

  • YOON RAN-SAM;LEE IN-CHEOL;Ryu CHEONG-RO
    • Proceedings of the Korea Committee for Ocean Resources and Engineering Conference
    • /
    • 2004.05a
    • /
    • pp.131-137
    • /
    • 2004
  • This paper is intended as an investigation of the deposition characteristics and mass transport flux estimation in the Nakdong estuary. In order to understand the effects of the tidal current circulation which influenced to an estuary terrain change, the seawater circulation calculation by the use of 2D numerical model for the three cases of without riverflow, mean and flood riverflow quantity condition practiced and each sectional net-flux of water quantity between sandbars(so called, dung) estimated. It may be that an estuary terrain change due to the large scale construction and reclamation at the Nakdong estuary influence to the long-time deposition characteristics. by the revim for the old research, we know that the development of the local sandbars has been moved toward the east-side from the west-side estuary area after the construction of the Nakdong river dike, at present the strong-acted location is the Bakhap-dung of the front sea of Tadea. The seawater circulation pattern at this large scale area of tidal flat bring on a change due to the water quantity outflowing from the Nakdong river. Base on the calculated results for the section net-flux of water quantity, we see that the accumulating action very strong at the local sea around Jangjado, Bakhapdung and Tadae for the case of flood riverflow quantity condition, but at the local sea around Jinudo for the another cases. Consequently, it is emphasized that in the Nakdong estuary the main sensitive regions which influenced from the discharge of riverflow were the local sea around Jangjado, Bakhapdung, Tadae and Jinudo.

  • PDF

A Study on the Simplification of Quantity Calculation of Reinforcing Bar (철근 수량산출 간소화 방안)

  • Jo, Yeong-Ho;Yun, Seok-Heon
    • Journal of the Korea Institute of Building Construction
    • /
    • v.19 no.6
    • /
    • pp.521-527
    • /
    • 2019
  • Quantity takeoff and cost estimates in Korea are carried out in practice without any clear standards or standards. Especially, quantity takeoff of Reinforcing bar and BoQ documentation process is very complex using 2D drawings. In this study, 10 case sites were analyzed for the status of inefficient quantity takeoff and how the statement was prepared. In order to solve this problem, this study presented a method for calculating the quantity of rebars through the ratio of concrete volume for schools, offices, and apartment buildings, and analyzed the accuracy of results. In the future, it is expected that the error range can be reduced by defining the factors affecting the results and calculating the correction value for them.

Developing An Automatic System for Quantity Taking-off Cut and Bent Re-Bar and Making a Placing Drawing (가공철근 물량산출 및 배근시공상세도 작성시스템 개발)

  • Park, Hyeon-Yong;Lee, Seung-Hyun;Kang, Tai-Kyung;Lee, Yoo-Sub
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.358-363
    • /
    • 2007
  • Reinforcing steel work plays an important role in terms of its structural performance or weight of construction cost for reinforced concrete structures. Precise estimation of re-bar quantity gives a basis for managing the reinforcing steel work effectively. However, the estimation process is still performed ineffectively based upon the expert's experience or manpower in spite of the advanced technology or improvement efforts. Therefore, the purpose of this research is to develop a prototype system for taking-off the quantity of reinforcing steel bars quickly and accurately in an order consistent with the specific members identified on the drawings. An estimate algorithm considering the connection, settlement and coating thickness of re-bars was suggested regarding to their replacement conditions which places more emphasis on constructibility. Also, this system produces the shop drawings automatically with the calculation results.

  • PDF

A Study on the Estimation Process of Material handling Equipment for Offshore Plant Using System Engineering Approach (시스템엔지니어링 기반 해양플랜트 Material handling 장비 수량산출 프로세스에 관한 연구)

  • Han, Seong-Jong;Seo, Young-Kyun;Cho, Mang-Ik;Kim, Hyung-Woo;Park, Chang-soo
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.22 no.6
    • /
    • pp.785-795
    • /
    • 2019
  • This paper is a study on the modeling of the quantity estimation model for offshore plant Material handling equipment in FEED(Front End Engineering Design) verification stage using system engineering approach which is an engineering design methods. The relevant engineering execution procedure is not systemized although the operation method and Material handling equipment selection with weight and space constraints is a key part of the FEED. Using the system engineering process, the stakeholder requirements analysis process, the system requirements analysis, and the final system architecture design were sequentially performed, and the process developed through the functional development diagram and Requirement traceability matrix (RTM) was verified. In addition, based on the established process, we propose a Material handling quantity estimation model and Quantity calculation verification Table that can be applied at the FEED verification stage and we verify the applicability through case studies.

A Study on Calculation of Interior Construction Area Using 3D Modeling Program (3D 모델링 프로그램을 활용한 인테리어 공사면적 산출에 대한 연구)

  • Ha, Seung-Beom
    • The Journal of the Convergence on Culture Technology
    • /
    • v.9 no.1
    • /
    • pp.531-537
    • /
    • 2023
  • Interior construction is required to estimate the quantity of material and the cost expected from 2D drawing in design phase and look for the reasonable method of work. Therefore, exact estimation for quantity and budgeting are very important processes, as a measure of judging the profitability of interior construction. These processes are mostly based on 2D drawing, so time and experienced staff are required. Error and omission can occur because the experienced staff also calculates the area using 2D based drawing. Interior market is currently based on 3D modeling from planning to final design. Accordingly, estimating quantity based on 3D modeling is emerging as a way of reducing error and omission. This paper will present the methodology on calculating area, the basic element of estimating quantity based on 3D Modeling in interior field.

Development of Solution Algorithm for Multi-dimention Road Alignment Design Considering Low-Carbon (탄소저감형 다차원 도로선형설계를 위한 솔루션 알고리즘 개발)

  • Kang, Jeon-Yong;Shim, chang-su
    • Journal of KIBIM
    • /
    • v.5 no.4
    • /
    • pp.11-22
    • /
    • 2015
  • Government efforts for green growth policy initiatives demand low-carbon technologies in the road construction industry. The purpose of this paper is to develop an algorithm of a road alignment design solution for establishing the multi-dimensional information, and to calculate carbon emission quantity due to the geometric design elements in the planning phase of road alignment. The paper developed a calculation method for carbon emission quantity by drawing a speed profile reflected in the operating speed, acceleration and deceleration, which are majors factor of carbon emissions while driving and by applying a carbon emission factor. From this effort, it enabled alignment planning to reduce carbon emission. Object-based parametric design methods of the cross-sections were proposed for alignment planning, and the paper demonstrated a BIM-based road alignment planning solution. The proposed solutions can provide multi-dimensional information on carbon emission quantity and cross section elements through driving simulation. It is expected to allow construction of eco-friendly roads by deriving optimal road alignment to minimize environmental costs.

Eatimation of the Quantity of Watershed Evapotranspiration considering soil moisture contents (토양수분량과 지하수량변화 측정에 의한 유역증발산량 추정)

  • Seo, Soung-Pil;Han, Young-Min;Kim, Tai-Cheol
    • Proceedings of the Korean Society of Agricultural Engineers Conference
    • /
    • 2002.10a
    • /
    • pp.241-244
    • /
    • 2002
  • A formula of watershed evapotranspiration by Penman or Thonthwaite or Lowry-Johnson was used to measure its quantity of evapotranspiration until now. These formula were derived for Foreign country and, it is rather difficult to apply the above formulas to the Korean watershed. These measuring methods are merely used to measure the monthly quantities of evapotranspiration. At the research CE of a coefficient of evapotranspiration for a watershed were newly presented, which was utilized for the calculation of Beken's formula in the DAWAST model.

  • PDF

Algorithm of effective GOP structure select by Macro Block base (Macro Block 기반의 효과적인 GOP구조 선택 알고리즘)

  • Jeon Min-Jeong;Moon Young-Deuk;Chung Hee-Tae
    • Proceedings of the Korea Contents Association Conference
    • /
    • 2005.05a
    • /
    • pp.470-474
    • /
    • 2005
  • There are many suggestion of methods which get good quality images by controling the GOP structure. But the existing algorithm should have not good to deal the real time adaptive processing determine the GOP structure because which check the fixed quantity of image in advance and require high capacity of frame memories and have delay time by increasing calculation quantity. This paper propose the algorithm which adapt the real time by the basic of macro block. We show the good simulation results using the proposed GOP structure based on macro block.

  • PDF