하천설계기준의 만곡부 수면형 결정 방법에 대한 적용성 검증 (Compatibility inspection for the way for Decision about Bight Flow Profile of Standard River Design)

  • 최한규;채홍기;백효선
    • 산업기술연구
    • /
    • 제26권B호
    • /
    • pp.43-51
    • /
    • 2006
  • Through the result of calculating the deviation between the value calculated from two-dimensional number formula, one-dimensional number interpretation, and curving part water surface type calculation method, we could confirmed that the deviation is reduced more than 50% when we use curving part water surface type calculation method. Also it was confirmed that there occurs the reduction rate of maximum 59% as the result of comparing with one-dimensional number interpretation since the reduction rate of safe room height was 20%, in 500 CMS of flood water quantity when we planted the construction of levee by curving part water surface type calculation method. And therefore, we have confirmed that the curving water surface type calculation method can be used as a simple formula in rivers with water quantity less than 500 CMS that flows in and out in Jess than 90 degree angle.

  • PDF

건물 골조수량 산출 시 BIM모델 기반 수량과 2D도면 기반 수량 차이 요인 분석 (Difference Factors Analysis of between Quantity Take-off Using BIM Model and Using 2D Drawings in Reinforced Concrete Building Frame)

  • 김광희
    • 한국건축시공학회지
    • /
    • 제23권5호
    • /
    • pp.651-662
    • /
    • 2023
  • 최근에 BIM을 여러 건설관리 활동에 활용하는 연구가 활발히 진행되고 있으며, 3D모델 기반 견적은 3D모델의 속성 정보를 사용하여 자동으로 수행할 수 있다는 장점이 있어 이에 대한 관심이 증대되고 있다. 따라서 본 연구에서 한 건축물을 2D 도면 기반으로 수량을 산출하는 소프트웨어와 Revit 소프트웨어로 생성된 3D 모델에서 추출한 수량의 차이를 비교하고 그 원인을 알아보고자 하였다. 두 가지 방법의 산출한 수량의 차이는 거푸집이 가장 크고, 다음으로 철근과 콘크리트 수량 순으로 작았다. 이러한 차이가 발생하는 이유는 3D모델에서 수량 추출이 수량산출기준에 적합하지 않은 부분이 있고, 특히 거푸집의 경우 필요한 부분의 수량만 분리해 내는데 어려움이 있었다. 또한 철근수량은 부재별로 분리가 되지 않아 정확한 수량 비교와 차이 원인을 밝히는 것이 불가능하였다. 따라서 3D모델에서 수량산출에 필요한 수치정보만 가져오고 별도의 계산식을 적용하는 응용소프트웨어를 사용하는 것이 가장 합리적일 것으로 사료된다.

구조설계정보 통합 관리에 의한 철근 물량 산출 자동화 기초 연구 (Basic study about Automatic Rebar Quantity Estimation Integrated with Structural Design Information)

  • 성수진;임채연;김선국
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2015년도 춘계 학술논문 발표대회
    • /
    • pp.109-110
    • /
    • 2015
  • Estimation of rebar quantity may be used as an index to evaluate the economic feasibility of structural designs. However, when using the software to estimate the rebar quantity, there may be some limitations such as data loss caused by human errors and estimation delays caused by increased input time, since the information on arrangement of rebar is inserted manually. To solve the problems of such quantity estimation software, it is necessary to develop a method on automatic input/output of structural design information for quantity estimation and an algorithm for accurate estimation of rebar quantity. The purpose of this study is to improve the existing rebar quantity estimation by connecting with the database on information related to rebar estimation and the algorithm for rebar estimation, in order to develop an algorithm to estimate an accurate, net rebar quantity. The study result can be used as basic data for development of software for efficient structural designs and automatic framework estimation of buildings.

  • PDF

BIM 기반 물량 산출의 정확성 검증 - 마감공사 공종을 중심으로 (A Verification of the Accuracy in BIM-Based Quantity Taking-Off - Focusing on Finishing Work)

  • 김지현;윤수원
    • 한국BIM학회 논문집
    • /
    • 제3권2호
    • /
    • pp.1-9
    • /
    • 2013
  • Currently, various studies and applications related BIM based quantity take-off have been attempted, because of the accuracy of cost estimating and reliability by using the BIM model information in automatical calculation. Finishing works that have a large number of various types and materials need the higher accuracy and reliability on the BIM-based quantity take-off. Therefore, this study compared and analyzed 2D and 3D based quantity through Test-bed and determine the cause of the quantity difference. This verified the accuracy and efficiency in the BIM-based quantity take-off for finishing works. Also this study has been proposed opinions for calculating the exact BIM-based quantity take-off.

BIM 기반 견적을 위한 창호공사 내역 작성체계 개선 방안 (Improvement of Bill of Quantities of Door and Window Work for BIM-based Cost Estimation)

  • 김미현;조찬원;윤석헌
    • 한국BIM학회 논문집
    • /
    • 제10권2호
    • /
    • pp.12-20
    • /
    • 2020
  • Recently, interest in BIM technology has been growing in the domestic construction market as the number of construction projects requiring the application of BIM technology has increased. The use of BIM allows the use of various visualization functions through 3D models as well as drawing interference review, quantity calculation and integrated management of information. In particular, estimates of construction costs based on BIM can increase work efficiency by reducing the burden of calculating construction costs and managing them. In order to increase the efficiency of BIM-based cost estimates, it is necessary to improve the correlation between the BoQ(Bill of Quantity) information and the BIM model. For this purpose, the ratio of the amount and item to the detailed construction of the current BoQ was analyzed, especially the problem of the calculation of construction cost in the window work in this study. In addition, we would like to suggest a method for systematically linking the BoQ information with the BIM model by improving the BoQ information structure of the window work. It is expected that this will increase the efficiency of the quantity calculation and analysis work of construction cost of window work. In addition, it is expected that this method will help to analyze and predict changes in construction cost of windows and doors by facility characteristics and type.

3차원 형상·지식정보를 활용한 마감공사 개산견적 프로세스 (Schematic Estimation Process for Finishing Work using 3D Geometry-Knowledge Information)

  • 박상헌;박형진;구교진
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2013년도 춘계 학술논문 발표대회
    • /
    • pp.210-212
    • /
    • 2013
  • The construction cost estimates during the design phase becomes the standard to judge profitability and validity, and is very important in various decision-makings by project owner. However, since approximate costs are quoted when many parts are undecided in the early stage of project, differences are bound to occur between the construction cost calculated through approximate quotation and that put into construction actually. Also, since in existing quotation works, quantity calculations have been dependent on the staff's manual work, involving error potential, and thus differences are likely in quantity calculation depending on the quotation staff's method of calculation. In this study, the process of creating space model to deduce 3D geometry information for approximate quotation in association with knowledge information and the expression for calculation of finishing area were proposed.

  • PDF

도면정보 기반 건축공사 콘크리트 물량산출 성과물 검증방안 개발 (Verification Method for Quantity Takeoff Results of Concrete Works using Design Drawing Information)

  • 임해진;최창훈;한충희;이준복
    • 한국건설관리학회논문집
    • /
    • 제21권5호
    • /
    • pp.20-28
    • /
    • 2020
  • 견적업무는 공사비를 산출하는 것을 목적으로 수행되며, 단가정보와 물량정보의 곱으로 산출되므로 성공적인 건설 프로젝트의 수행을 위해 정확한 물량산출이 선행되어야 한다. 또한 현재 견적 전문가를 대상으로 한 설문조사에 의하면, 물량산출 성과물에 대한 만족도가 높음에도 불구하고 이에 대한 검증작업이 필요하다는 의견이 다수이다. 그러나 현재는 견적 작업자의 경험도에 의존하는 등 객관적인 검증방안이 미비한 실정이다. 따라서 본 연구는 작업자 개개인의 업무능력에 의존하지 않고 검증할 수 있는 검증방안을 제안하였다. 제안하는 검증방안은 산출서 물량과 비교하여 ±5%의 오차를 가지는 검증물량을 산출하여 산출한 물량에 대한 가이드 라인을 제시하였다. 이를 위해 기존에 수행된 프로젝트 데이터를 활용하여 도면 및 산출서를 분석하고, 도면으로부터 정보를 추출하여 검증물량을 산출할 수 있는 산식을 개발하여 검증물량산출 산식이라고 정의하였다. 본 연구의 결과인 검증물량산출 산식은 최단기간 내에 최소인원으로 물량산출 성과물에 대한 검증업무를 수행할 수 있게 하는 것을 목적으로 한다. 이로 인해 작업자가 산출한 물량에 대한 신뢰도를 확보할 수 있을 것으로 생각되며, 오류가 발생한 항목에 대한 검토가 수행됨에 따라 효율적인 견적업무가 가능하게 될 것으로 기대된다.

실시설계단계에서 수량산출을 위한 복합벽체 자동분할에 관한 연구 (A Study for Automated Division of Composite Walls for Quantity Take-off in Construction Document Phase)

  • 박승화;김흥수;윤두영
    • 한국CDE학회논문집
    • /
    • 제20권2호
    • /
    • pp.124-132
    • /
    • 2015
  • When Building Information Modeling (BIM) was introduced at the early stage, it was only utilized as a three-dimensional visualization tool. Nowadays, however, BIM is being studied for increasing design productivity and managing enormous information on building life cycle. One of the representative research is developing 'common prototype BIM libraries'. BIM data made of common prototype libraries should be utilized in various ways, quantity takeoff, code checking, energy analysis and so on. However, common prototype BIM libraries are not enough to estimate accurate cost. For example, composite wall libraries should be divided into several single objects, wall structure and finishes, for the quantity takeoff and construction cost calculation. In this paper, we are suggesting an automated division algorithm of composite wall and developing a system prototype for it. This study is expected to reduce extra modeling work and contribute to fast and accurate cost calculation in the construction.

시계열 모델을 이용한 계절별 수요관리량 산정 (Calculation of Seasonal Demand Side Management Quantity Using Time Series)

  • 이종욱;위영민;이재희;주성관
    • 전기학회논문지
    • /
    • 제60권12호
    • /
    • pp.2202-2205
    • /
    • 2011
  • Demand side management is used to maintain the reliability of power systems and to increase the economic benefits by avoiding power plant construction. This paper presents a systematic method to calculate the quantity of seasonal demand side management using time series. A numerical example is presented to calculate the quantity of demand side management in winter season using time series.

Computer나 Calculator를 이용한 계산에서 오류 교정을 위한 어림셈 지도에 관한 연구

  • 강시중
    • 한국수학교육학회지시리즈A:수학교육
    • /
    • 제29권1호
    • /
    • pp.21-34
    • /
    • 1990
  • This is a study on an instruction of estimation for error correction in the calculation with a computer or a calculator. The aim of this study is to survey a new aspect of calaulation teaching and the teaching strategy of estimation and finally to frame a new curriculum model of estimation instruction. This research required a year and the outcomes of the research can be listed as follows: 1. Social utilities of estimation were made clear, and a new trend of calculation teaching related to estimation instruction was shown. 2. The definition of estimation was given and actual examples of conducting an estimation among pupils in lower grades were given for them to have abundant experiences. 3. The ways of finding estimating values in fraction and decimal fraction were presented for the pupils to be able to conduct an estimation. 4. The following contents were given as a basic strategy for estimation. 1) Front-end strategy 2) Clustering strategy 3) Rounding strategy 4) Compatible numbers strategy 5) Special numbers strategy 5. In an instuction of estimation the meaning, method. and process of calculation and calculating algorithm were reviewed for the cultivation of children's creativity through promoting their basic skill, mathematical thinking and problem-solving ability. 6. The following contents were also covered as an estimation strategy for measurement 1) Calculating the sense of quantity on the size of unit. 2) Estimating the total quantity by frequent repetition of unit quantity. 3) Estimating the length and the volume by weighing. 4) Estimating unknown quantity based on the quatity already known. 5) Estimating the area by means of equivalent area transformation. 7. The ways of instructing mental computation were presented. 8. Reviews were made on the curricular and the textbook contents concerning estimation instructions both in Korea and Japan. and a new model of curriculum was devised with reference to estimation instruction data of the United States.

  • PDF