• 제목/요약/키워드: quantity calculation

검색결과 256건 처리시간 0.023초

월경량 평가 기준에 관한 연구 (A Study on the Measured Method of Menstrual Quantity)

  • 이인선;김미진;김규곤
    • 대한한방부인과학회지
    • /
    • 제18권1호
    • /
    • pp.242-252
    • /
    • 2005
  • Purpose : This study carried out to develop the questionnaires that can measure objectively menstrual quantity and determine quantity index. Method : First, we made questionnaires to measure menstrual quantity by six question. Then we investigated 1309 women's questionnaires who has the menses. Conclusion : 1. the questionnaires that can measure objectively menstrual quantity and determine quantity index was high a correlation coefficient therefore those were used Method of Menstrual Quantity(here after MMQ) calculation. Those were added and averaged. 2. We examined correlation of calculated MMQ and women's questionnaires who has the menses therefore we got 0.30~0.47 correlation. 3. MMQ 1~3(hypomenorrhea) was 39 persons 3.19%, MMQ 4~6(normal menorrhea) was 1050 persons 85.85% and MMQ 7~10(hypermenorrhea) was 134 persons 10.96%. MMQ 4 tended to be little and MMQ 6 tended to be much. 4. MMQ confidence was high as 82% comparatively so we thought MMQ was appropriate as the measured method of menstrual quantity.

  • PDF

합성 PC 부재의 철골 물량산출 알고리즘 기초연구 (Basic study of algorithm for steel quantity analysis of composite precast concrete members)

  • 김경주;임채연;김선국
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2014년도 추계 학술논문 발표대회
    • /
    • pp.96-97
    • /
    • 2014
  • Green Frame is a column-beam structure built by steel frame joints embedded in the columns and beams. Here, the steel frame embedded in the columns and beams is not a standardized product, instead it needs to be order-produced. The quantity for each steel frame size should be calculated to estimate the quantity of steel frames to be manufactured. However, it is highly time-consuming and requires a lot of effort in calculating the quantity of steel frames, for there are a wide range of steel frame types that are embedded in the columns and beams. To solve this problem, the study proposes an algorithm for calculation of the amount of steel frames with ease and promptness. When a program is developed using the algorithm proposed in the study in connection to the information on precast concrete members prepared in the design phase, it is anticipated that the manpower required as well as the manufacturing time will be decreased.

  • PDF

BIM기반 물량 및 내역정보 생성을 위한 내역서 개선방안 (Improvement of BoQ Documents for the BIM based Quantity Takeoff)

  • 안지원;윤석헌
    • 한국BIM학회 논문집
    • /
    • 제7권2호
    • /
    • pp.16-24
    • /
    • 2017
  • It is very important to estimate accurate construction total cost needed early in the project. In the initial phase of the design, the project cost estimates are determined by total quantity from design documents and the variables that affect the calculation of the total cost of the project. In order to determine accurate total construction cost, the contractor has to produce detailed quantity information based on the drawings and specifications. The process of preparing quantification and cost estimation documents is still being worked out manually, and a lot of errors have been occurred in many cases. Recent advances in information technology have led to the BIM based quantity takeoff and cost estimation. However, there are some limits to the extent to which the current specifications for BoQ documents are computed from BIM model. This research analyze the current BoQ cases and analyze how to make quantity takeoff possible through BIM. The study defined five levels of quantity category that could be produced by BIM. Only about 40% or indirectly usable items can be used when information is extracted to BIM modelling. This is very insufficient to fill out the BoQ. The BoQ document structure quantity takeoff specifications should be simplified in order to BIM based cost estimation more efficiently.

단일모드 스펙트럼해석법에 의한 교량의 효율적 내진해석 (Efficient Seismic Analysis of Bridge by Single Mode Spectrum Analysis Method)

  • 박윤봉;국무성;유승운;김선훈
    • 한국전산구조공학회:학술대회논문집
    • /
    • 한국전산구조공학회 2003년도 가을 학술발표회 논문집
    • /
    • pp.487-494
    • /
    • 2003
  • Recently it is used seismic analysis like single mode spectrum analysis, multi mode spectrum analysis and time history analysis in Korea. Because bridges are not special form of them but regular and simple form of them in our country, we must develope seismic analysis program of bridge based on single nude spectrum analysis. The program developed by this study reduces a Quantity and a time of calculation compared to SAP90 and gives accurate answers without errors. In the case of commercial program if we look for seismic load(P/sub e/(x)), we must increase the number of node and the larger the number of node the more a quantity and a time of calculation. But this program is exactly solved with basic node compared to commercial program.

  • PDF

BIM기반 철근콘크리트구조의 물량산출 비교 (A Comparison of Quantity Take-Offs of RC Structures based on BIM)

  • 윤종덕;조현식;이재홍;신재용;김은석
    • 한국전산구조공학회논문집
    • /
    • 제33권1호
    • /
    • pp.35-44
    • /
    • 2020
  • 최근 건설업계에서 설계시의 수량산출 및 예정공사비의 정확도에 대한 요구가 높아지고 있으며, 설계변경 시에 즉각적인 물량의 변화와 공사비의 변화를 파악하는 것이 중요한 이슈가 되고 있다. 또한, 수량과 공사비와 관련한 각종 소송들이 빈번하게 발생하면서 이를 해결하기 위한 방안으로 BIM기반의 물량산출 및 견적이 대안으로 등장하였다. 그러나 현재 BIM기반의 물량산출 및 견적은 2D 기반의 기존 방식보다 활용이 원활하지 못하다. 이는 물량산출 및 내역에 대한 국가적인 표준이나 기준이 마련되어 있지 못하고, 산출 작업자의 경험이 중요한 요소로 작용하기 때문이다. 하지만, 이는 견적의 관점이고 설계자의 관점에서 BIM을 이용한 즉각적이고 비교적 정확도가 우수한 수량과 공사비의 파악이 예산에 맞는 설계를 진행하기 위하여 필요하다. 본 연구에서는 서울시 ◯◯타운 생활관의 철근콘크리트 구조의 콘크리트, 철근, 거푸집의 수량을 사례로 2D기반의 설계수량과 BIM을 기반으로 한 계획설계, 실시설계 시의 수량과 실제 시공수량을 비교·분석하고 차이가 발생하는 원인을 분석하여 향후 설계자 관점에서 BIM기반의 수량산출에 도움이 되고자 하였다.

DGPS/EchoSounder 조합에 의한 호퍼준설량 산정 (Calculation of Hopper Dredging Capacity by Combination of DGPS and Echo Sounder)

  • 이종출;이용희;김종원;강윤성
    • 한국측량학회:학술대회논문집
    • /
    • 한국측량학회 2004년도 춘계학술발표회논문집
    • /
    • pp.77-82
    • /
    • 2004
  • This study deals with the estimation of dredged soil-quantity using DGPS&Echo-Sounder method. In measurement of topography, surveyors have been surveying the depth with rod and sounding lead. This method, however, is not effective because of long time and a lot of human power, in addition it is incorrect. This paper has studied on the solution of those problems using DGPS&Echo-sounder data to calculate the dredged soil-quantity. This paper says the effective and economical methods using DGPS&Echo-Sounder data there.

  • PDF

Application of rock mass index in the prediction of mine water inrush and grouting quantity

  • Zhao, Jinhai;Liu, Qi;Jiang, Changbao;Defeng, Wang
    • Geomechanics and Engineering
    • /
    • 제30권6호
    • /
    • pp.503-515
    • /
    • 2022
  • The permeability coefficient is an essential parameter for the study of seepage flow in fractured rock mass. This paper discusses the feasibility and application value of using readily available RQD (rock quality index) data to estimate mine water inflow and grouting quantity. Firstly, the influence of different fracture frequencies on permeability in a unit area was explored by combining numerical simulation and experiment, and the relationship between fracture frequencies and pressure and flow velocity at the monitoring point in fractured rock mass was obtained. Then, the stochastic function generation program was used to establish the flow analysis model in fractured rock mass to explore the relationship between flow velocity, pressure and analyze the universal law between fracture frequency and permeability. The concepts of fracture width and connectivity are introduced to modify the permeability calculation formula and grouting formula. Finally, based on the on-site grouting water control example, the rock mass quality index is used to estimate the mine water inflow and the grouting quantity. The results show that it is feasible to estimate the fracture frequency and then calculate the permeability coefficient by RQD. The relationship between fracture frequency and RQD is in accordance with exponential function, and the relationship between structure surface frequency and permeability is also in accordance with exponential function. The calculation results are in good agreement with the field monitoring results, which verifies the rationality of the calculation method. The relationship between the rock mass RQD index and the rock mass permeability established in this paper can be used to invert the mechanical parameters of the rock mass or to judge the permeability and safety of the rock mass by using the mechanical parameters of the rock mass, which is of great significance to the prediction of mine water inflow and the safety evaluation of water inrush disaster management.

토공수량계산 자동화를 위한 스케치 도면 요소의 그래프 위상 자동 구성 및 형태 패턴 인식에 대한 연구 (The Recoginition of Pattern of Shape and Composing the Graph Topology of Sketch Drawing Element for the Automation of Earthwork Quantity Calculation)

  • 강태욱;김봉석
    • 대한토목학회논문집
    • /
    • 제30권2D호
    • /
    • pp.171-179
    • /
    • 2010
  • 본 연구에서는 토목 설계 엔지니어링에서 공사비 산출에 50%이상을 차지하는 토공 공종 분류 및 수량산출을 위한 스케치 도면 요소의 위상 자동 추출 및 토공 형태 패턴 자동인식 모델을 제시하였다. 이를 위해 횡단면도에서 자동으로 폐영역을 인식해 vertex(정점), edge(모서리), face(면)로 위상요소를 추출하고, 각 위상요소간의 관계를 자동 설정할 수 있도록 알고리즘을 연구하였다. 이 위상구조를 이용해 형태 패턴을 수학적으로 정의하고 형태를 자동 인식할 수 있는 모델을 제안하였다. 연구 결과로 기존 토공엔진에서 처리하기 어려웠던 토공 형태도 토공 형태 패턴 모델을 확장함으로써 쉽게 처리할 수 있었으며, 횡단면도에서 수량을 산출할 수 있는 일반적인 형태 패턴 인식 모형을 얻을 수 있었다. 개발된 모형을 이용한다면, 토목에서 다양한 분야의 토공 분류 및 수량 산출 업무를 자동화해 비용을 줄이고 수량 산출의 정확도는 높일 수 있다고 판단된다.

도로분야 BIM 라이브러리를 활용한 실적공사비 산정모델 구축 (An Estimation Model of Historical Cost Using BIM Library for Road Project)

  • 문현석;주기범
    • 한국CDE학회논문집
    • /
    • 제20권4호
    • /
    • pp.431-442
    • /
    • 2015
  • Currently, a BIM-based quantity takeoff (QTO) system is mainly focused on architectural projects. To perform this, diverse quantity takeoff methods such as an object-based automatic quantity takeoff, manual quantity and base functions of calculation have widely been utilizing. However, since BIM library for road projects includes structural elements associated with alignment, it is necessary to establish cost estimation system interlocked with historical cost using 3D library by each unit length. Accordingly, the aim of this study is to develop cost estimation model with using a historical cost approach so that it can be utilized in construction planning based on the BIM library for road projects. For this, based on the BIM library for road, the standardized quantity is estimated, and a process for calculating historical cost and a verification model with a 5D simulation was developed by mapping a WBS code with each BIM library object. This can be applied during the approximate cost estimation process in a project planning and an initial design phase for road projects. Besides, it is expected that these results will be utilized in constructing an optimal historical cost estimation process for project libraries.