• Title/Summary/Keyword: protection facility

Search Result 411, Processing Time 0.026 seconds

Fracture Toughness Evaluation of Natural Gas Pipeline under the Cathodic Protection

  • Kim, Cheol-Man;Baek, Jong-Hyun;Kim, Young-Pyo;Kim, Woo-Sik
    • Corrosion Science and Technology
    • /
    • v.8 no.4
    • /
    • pp.133-138
    • /
    • 2009
  • For the corrosion protection of the natural gas transmission pipelines, two methods are used, cathodic protection and coating technique. In the case of cathodic protection, defects are embrittled by occurring hydrogen at the crack tip or material surface. It is however very important to evaluate whether cracks in the embrittled area can grow or not, especially in weld metal. In this work, on the basis of elastic plastic fracture mechanics, we performed the CTOD testing with various test conditions, such as testing rate and potential. The CTOD of the base metal and the weld metal showed a strong dependence of the test conditions. The CTOD decreased with decreasing testing rate and with increasing cathodic potential. The morphology of the fracture surface showed the quasi-cleavage at low testing rate and cathodic overprotection. The low CTOD was caused by hydrogen embrittlement at crack tip.

Evaluation of Pressure Effects on Blast Valves for Facility Protection of Underground Computing Center (지하 전산센터의 시설보호를 위한 방폭밸브에 미치는 폭압 평가)

  • Pang, Seung-Ki;Shin, Jin-Won;Kim, Wae-deuk
    • Journal of the Korean Society for Geothermal and Hydrothermal Energy
    • /
    • v.14 no.3
    • /
    • pp.21-28
    • /
    • 2018
  • This paper presents two-step simulations to calculate the influence of blast-induced pressures on explosion-protection valves installed at the boundary between a protection facility and a tunnel entering the facility. The first step is to calculate the respective overpressure on the entrance and exit of the tunnel when an explosion occurs near the tunnel entrance and exit to approach the protection facility. Secondly, the blast pressures on the explosion-protection valves mounted to walls located near the tunnel inside approaching the protection facility are analyzed with a 0.1 ms time variation using the results obtained from the first-step calculations. The following conclusions could be derived as a results: (1) The analysis of the entrance tunnel scenario, P1, leads to the maximum overpressure of 47 kPa, approximately a half of the ambient pressure, at the inner entrance due to the effect of blast barrier. For the scenario, P2, the case not blocked by the barrier, the maximum overpressure is 628 kPa, which is relatively high, namely, 5.2 times the ambient pressure. (2) It is observed that the pressure for the entrance tunnel is effectively mitigated because the initial blast pressures are partially offset from each other according to the geometry of the entrance and a portion of the pressures is discharged to the outside.

Electromagnetic Wave Shielding Effectiveness Measurement Method of EMP Protection Facility (EMP 방호시설의 전자파 차폐효과 측정 방법)

  • Seo, Manjung;Chi, Seongwon;Kim, Youngjin;Park, Woochul;Kang, Hojae;Huh, Changsu
    • The Journal of Korean Institute of Electromagnetic Engineering and Science
    • /
    • v.25 no.5
    • /
    • pp.548-558
    • /
    • 2014
  • EMP(Electromagnetic Pulse) protection facility was evaluated according to standard of shielding effectiveness. To comply with the standard, transmitting antenna was placed on outside of protection facility and receiving antenna was placed on inside of protection facility. However, measurement is impossible that place does not have enough space between protection facility and external concrete structure. In this paper, we performed a various of tests that put transmitting antenna inside the EMP protection facility in order to find out test method for measuring the shielding effectiveness of electromagnetic wave. Transmitting antenna was placed on inside of the EMP protection facility for measuring the shielding effectiveness to compare and analyze the impact of the position regarding to the transmitting and receiving antenna. As a result of test, in case that transmitting antenna was placed on inside of the EMP protection facility, it was found that test frequency range 10 kHz~1 GHz were occurred overall average difference of ${\pm}4$ dB level.

Study on Propriety Evaluation for Protection of Rock Revetment (석축호안 보호공의 적정성 평가에 대한 연구)

  • Park, Moo-Jong;Choi, Sung-Wook;Baek, Chun-Woo
    • Journal of the Korean Society of Hazard Mitigation
    • /
    • v.8 no.5
    • /
    • pp.111-117
    • /
    • 2008
  • Recent climate changes have increased flood damage on bank and revetment. However design standard for revetment that is the one of the most important facility for flood protection is not enough in Korea. In this study, destruction of rock revetment in Guryecity caused by the flood on Aug 2007 was inquired by analysis using 2D hydraulic simulation model SMS and the propriety of established plan for protection of rock revetment was evaluated. For this purpose, the ranges of protection facility for revetment was calculated by two methods. The one is normal method to calculate range of pier scour protection facility, and the other is a method of the standard for river design in Korea. The results of both methods are compared to evaluate the established plan.

Numerical Study on Ground Vibration Reduction Performance of Concrete Drainage Protection Facility (콘크리트 배수관로 보호구의 지반진동 저감 성능에 관한 수치해석적 연구)

  • Jung, Seung-Won;Kim, Jung-Gyu;Kim, Jun-Ha;Baluch, Khaqan;Kim, Jong-Gwan
    • Explosives and Blasting
    • /
    • v.39 no.4
    • /
    • pp.12-21
    • /
    • 2021
  • In this study, a series of FEM numerical analyses was conducted to compare the resistance performance of concrete drainage protection facility to blast vibration. Two different types of ㅁ-shaped protection facility, which are suggested in the study, were compared to the traditional ㄷ-shaped one. In the analyses, the vibration resistances of the three protection facilities were evaluated under the varying conditions of the standoff distance from the explosion and charge weight per delay. As a result, it was found that the two proposed types of drainage protection facilities are superior to the traditional one in the vibration reduction performance.

Detailed Analysis of the KAERI nTOF Facility

  • Kim, Jong Woon;Lee, Young-Ouk
    • Journal of Radiation Protection and Research
    • /
    • v.41 no.2
    • /
    • pp.141-147
    • /
    • 2016
  • Background: A project for building a neutron time-of-flight (nTOF) facility is progressing. We expect that the construction will start in early 2016. Before that, a detailed simulation based on the current architectural drawings was performed to optimize the performance of our facility. Materials and Methods: Currently, several parts had been modified or changed from the original design to reflect requirements such as the layout of the electron beam line, shape of the vacuum chamber producing a neutron beam, and the underground layout of the nTOF facility. Detailed analysis for these modifications has been done with MCNP simulation. Results and Discussion: An overview of our photo-neutron source and KAERI nTOF facility were introduced. The numerical simulations for heat deposition, source term, and radiation shielding of KAERI nTOF facility were performed and the results are discussed. Conclusion: We are expecting that the construction of the KAERI nTOF facility will start in early 2016, and these results will be used as basic data.

A Study on the Efficiency of Children's Shelter in Korea using DEA Analysis Method

  • Jeong, Seong-Bae;Joo, Mi-yeon
    • Journal of the Korea Society of Computer and Information
    • /
    • v.25 no.6
    • /
    • pp.207-217
    • /
    • 2020
  • The purpose of this study is to analyze the efficiency of Korean child welfare facilities using the DEA analysis method and to present policies. The input variables for the analysis of this data were the number of employees, the number of facilities, and the number of gardens, and the output variables were the current sources. The results of the study are as follows. As a result of CCR analysis, inefficient facilities were found to be temporary protection facilities and comprehensive facilities. As a result of BCC analysis, inefficient facilities were identified as temporary protection facilities. As a result of SE analysis, inefficient facilities were found to be temporary protection facilities. The suggestion is as follows. First, adjustment of the capacity of temporary protection facilities is required. Second, it is necessary to strengthen the professionalism of workers in child welfare facilities. Third, strengthen the expertise of the child welfare facility manager.

A Study on Site investigation for Cut Slope Management Manual preparation (절토사면 유지관리 매뉴얼 작성을 위한 현장조사에 관한 연구)

  • Ji, Young-Hwan;Chang, Buhm-Soo;Kim, Yong-Soo;Lee, Jong-Young
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2005.03a
    • /
    • pp.825-830
    • /
    • 2005
  • Cut slope and facility of management investigation is the protection of humans and properties. it is very important the prevention of disaster facility and the damage of the slope protection facility. It is very difficult to forecast slope stability, disaster possibility and collapse. It will be able to minimize the damage which it prepare against slope facility and cut slope of deformable investigation and collapse and the disaster. therefore those deformable investigation is important. Investigations execute upheaval, crack, sliding for slope and cut slope reinforcement. Investigation executes forecast in place where the construction problem, the effect which the damage in road traffic or the contiguity facility.

  • PDF

Considerations of the Optimized Protective Action Distance to Meet the Korean Protective Action Guides Following Maximum Hypothesis Accidents of Major KAERI Nuclear Facilities

  • Goanyup Lee;Hyun Ki Kim
    • Journal of Radiation Protection and Research
    • /
    • v.48 no.1
    • /
    • pp.52-57
    • /
    • 2023
  • Background: Korea Atomic Energy Research Institute (KAERI) operates several nuclear research facilities licensed by Nuclear Safety and Security Commission (NSSC). The emergency preparedness requirements, GSR Part 7, by International Atomic Energy Agency (IAEA) request protection strategy based on the hazard assessment that is not applied in Korea. Materials and Methods: In developing the protection strategy, it is important to consider an accident scenario and its consequence. KAERI has tried the hazard assessment based on a hypothesis accident scenario for the major nuclear facilities. During the assessment, the safety analysis report of the related facilities was reviewed, the simulation using MELCOR, MACCS2 code was implemented based on a considered accident scenario of each facility, and the international guidance was considered. Results and Discussion: The results of the optimized protective actions were 300 m evacuation and 800 m sheltering for the High-Flux Advanced Neutron Application Reactor (HANARO), the evacuation to radius 50 m, the sheltering 400 m for post-irradiation examination facility (PIEF), 100 m evacuation or sheltering for HANARO fuel fabrication plant (HFFP) facility. Conclusion: The results of the optimized protective actions and its distances for the KAERI facilities for the maximum postulated accidents were considered in establishing the emergency plan and procedures and implementing an emergency exercise for the KAERI facilities.