• Title/Summary/Keyword: project type criteria

Search Result 71, Processing Time 0.025 seconds

Study on the Establishing a Guideline for Selecting Major Environmental Factors by the Project Type Criteria in EIA (환경영향평가 대상사업별 중점평가항목의 도출에 관한 연구)

  • Sung, Hyun-Chan;Han, Sang-Wook
    • Journal of Environmental Impact Assessment
    • /
    • v.3 no.1
    • /
    • pp.9-30
    • /
    • 1994
  • Environmental Impact Assessment System, ever since its enactment in Korea fourteen years ago, has been steadily improved by introduction and implementation of new concepts and methodologies which include Environmental Impact Statement(EIS) preparation technique, selection of environmental factors, and the like. However, current guideline requires that every EIS, regardless of the specifics of the project type or characteristics of the site, must evaluate and study for all twenty-two environmental factors as set forth in the regulation. The situation causes many undesirable problems like; lack of site specific evaluation in most EISs, over-sized EIS drafts, consuming too much time and costs for EIS preparation, and so on. The objectives of this study are: - To establish a set of criteria to classify the types of the projects in terms of features of the project content and the characteristics of the site area. - To establish a guideline for selecting major environmental factors of the project type criteria, and - To provide basic materials for the preparation of complets draft EIS of the Amendment of Environmental Impact Assessment Act.

  • PDF

The Impact of IT Project Size and Types on IT Investment Decision Criteria (IT프로젝트 규모와 유형에 따른 IT투자 의사결정기준의 차이)

  • Lee Kukhie
    • Journal of Information Technology Applications and Management
    • /
    • v.12 no.1
    • /
    • pp.191-211
    • /
    • 2005
  • This study investigates the decision criteria used in the context of IT investment decision making and empirically analyzes the impact of IT project size and types on the importance of decision criteria. 5 criteria which have been extracted from the previous studies and industry practices are budget, financial benefits. strategic value. risk, and the degree of proposer's eagerness. Data of 120 IT project proposals have been collected from 5 companies including bank, insurance. and stock trading company. As results of ANOVA test. 7 out of 10 hypothesis have been accepted statistically. That is. the bigger the project size. the higher the evaluation weight of project budget and risk criteria and the lower the weight of proposer's eagerness. And in case of the infrastructure investment type. the emphasis is placed more on strategic value and risk criteria and less on financial benefit and proposer's eagerness. These findings provide insights for both IT practitioners and researchers.

  • PDF

A Study on Environment-friendly Location & Review Criteria by Development Project Types (개발사업 유형별 환경친화적 입지 및 검토기준 연구)

  • Sung, Hyun-Chan
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.12 no.4
    • /
    • pp.34-46
    • /
    • 2009
  • and to provide (case example-focused) guidelines for environment-friendly oriented plans. Key findings of this study are as follows : first, a total of 2,465 development projects covering $173km^2$ were undertaken in Gyeonggi province in last three years. Second, based on the analysis of 16 development projects in four types, about 20 alternative environment-friendly location were suggested. Thirdly, 56 environment-friendly criteria were suggested for the environmental assessment items by setting at least three alternatives. Going forward, if discussion case examples by project type, environment-friendly location criteria by project type, and environment friendly review criteria by assessment item suggested in this study are fully utilized when initiating or approving various development projects in the future, environment-friendliness will be enhanced in development projects.

AA Study on the Selection Criteria for Delivery Systems of Public Construction Projects in Local Governments (지자체 공공건설사업의 발주방식 선정기준에 관한 연구)

  • Choi, Eun-A;Kim, Byung-Ok;Lee, Sang-Beom
    • Journal of the Korea Institute of Building Construction
    • /
    • v.9 no.5
    • /
    • pp.111-117
    • /
    • 2009
  • With the current trend in the industry toward increasingly complex, diversified and large construction projects, advanced countries in the construction field have already introduced and applied a variety of methods for placing orders in order to cope with such changes in construction circumstances. In Korea, there have been efforts to continuously improve approaches to placing an order. With the aim of diversifying the methods of Delivery Systems, the "Technical Proposal Type Bid," and the "Design Competition and Technical Proposal Type Bid" were introduced through a revision of Korea's contract law enforcement ordinance. In line with the government's efforts, criteria for a method of placing an order that is suitable for a public construction project should be presented. This study enumerates the current issues using a survey for construction projects already placed and an analysis of the current status, and presents the selection criteria for Delivery Systems by business type as an improvement for the problem.

Development of Evaluation Criteria for Real Estate Development Projects (부동산 개발사업 평가기준 및 지표 개발)

  • Kim, Sung-Il;Bae, Yu-Jin;Chang, Chul-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.2
    • /
    • pp.86-96
    • /
    • 2015
  • Real estate market has rapidly grown by active use of project financing in the early 2000s. However, many projects have been in trouble due to global economic recession after that period. It is mainly because those projects were pushed forward a business without comprehensive business feasibility analysis. This paper investigated current evaluation system for real estate development projects and then introduced new evaluation system including evaluation factor and criteria for real estate development projects to prevent implementation of the project without business value and to be able to evaluate potential projects in objective manner. This new evaluation system for real estate development projects can be applied to any type of real estate development projects by modifying evaluation items and weighting factor in accordance with the type and characteristics of project. Through the new evaluation system, the evaluation process for real estate development projects will be able to be standardized, be consistent, and the results of evaluation can be accumulated in consistent way.

Pre-evaluation Methodology for Decision Making of IT Outsourcing's Feasibility (IT아웃소싱의 타당성 결정을 위한 사전평가 방법론)

  • Hong, Hyun-Gi
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.8 no.4
    • /
    • pp.894-899
    • /
    • 2007
  • IT Outsourcing has been take place for ages and its range has expanded. The cases are also often take place more but there are a few criteria for making decision of IT outsourcing project. Companies tend to take IT outsourcing as a trend or to follow competitor's IT outsourcing project. This study suggests the criteria for IT outsourcing project before going into the project. The criteria ate to describe what function of the companies need to take outsourcing. Research model is driven by Statistics and AHP method. Also, variables are presented for clear making decision. This model allows the companies find proper IT outsourcing type and conveniences.

  • PDF

Decision-making Reliability Estimation Model based on Building Construction Project Participants' Experience

  • Kim, Chang-Won;Kim, Baek-Joong;Yoo, Wisung;Cho, Hunhee;Kang, Kyung-In
    • Journal of the Korea Institute of Building Construction
    • /
    • v.13 no.2
    • /
    • pp.148-158
    • /
    • 2013
  • Generally, building construction projects have a complex decision-making process because of the participation of various agents. In this situation, a final decision is arrived at by relying on subjective judgments based on the experience of project participants. For this reason, a method of assessing the objectivity of opinions is needed. In previous studies, the multi-criteria decision making method was applied to arrive at a final decision objectively, but this method has a limitation, in that the experience of each decision maker is not considered differently in the decision making process. Therefore, this study proposed a theoretical model using the S-shaped growth curve and regression analysis by building construction project type to quantitatively estimate decision-making reliability according to the experience of individual project participant`s. The developed model could be added to the Multi-criteria decision making method, and secure the objectivity and reliability of project participants' final opinion.

Key Success Factors for Collaborative Technology Development Projects: The Case of Small & Medium Firms in the Korean Electronics Parts Industry (공동기술개발 프로젝트의 성패요인: 우리나라 전자부품 중소기업 분석)

  • 이광희;김영배
    • Journal of Technology Innovation
    • /
    • v.6 no.2
    • /
    • pp.122-158
    • /
    • 1998
  • This study empirically examined different patterns of collaborative R&D project with their key success factors(KSFs), using data from 82 projects in the Korean electronic parts industry. The patterns of R&D collaboration were categorized into 4 types by two criteria development motive(technology Push/market pull) and Project initiator (focal firm/partner). The bivariate relationships revealed that project characteristics (technological complexity, market uncertainty), management characteristics (participation in project formulation), problem solving characteristics(problem solving performance of the focal firm, users active role in problem solving, active role of university or research institute in problem solving) and success rates appear to be different among four types of collaboration. Each type of collaborative R&D projects also had different KSFs. The KSFs of type 1 (technology Push and focal firm initiation), for instance, include the strategic importance of the project, focal firms share of cost, active role of university or research institute in problem solving, while those of type 4(market pull and customer initiation) cover reliability of partner relationship, a time at partners involvement, information sharing. The findings suggest that the different contingencies brought different patterns and KSFs of collaborative R&D project, since different information, resources, and partners roles were needed to successfully implement the projects according to development motive and project initiator Finally, managerial, policy, and theoretical implications for the collaborative R&D activities in the Korean electronics parts industry were discussed, based on empirical results of this study.

  • PDF

On method calculation design flood elevation of esturial city

  • Wang Chao;Chao, Wang-Dong
    • Proceedings of the Korean Society of Coastal and Ocean Engineers Conference
    • /
    • 1996.10a
    • /
    • pp.42-44
    • /
    • 1996
  • Recently due to repeatedly occurrence of flood, a lot of Chinese cities accept new design criteria for their protective project Most of them calculated by a certain type of probability distribution. In order to meet the demand of development economy the return period of design criteria is changed more longer and longer even 1000years, but the data which the calculation dependent on is only about 30-40 years. (omitted)

  • PDF

Non-linear modelling to describe lactation curve in Gir crossbred cows

  • Bangar, Yogesh C.;Verma, Med Ram
    • Journal of Animal Science and Technology
    • /
    • v.59 no.2
    • /
    • pp.3.1-3.7
    • /
    • 2017
  • Background: The modelling of lactation curve provides guidelines in formulating farm managerial practices in dairy cows. The aim of the present study was to determine the suitable non-linear model which most accurately fitted to lactation curves of five lactations in 134 Gir crossbred cows reared in Research-CumDevelopment Project (RCDP) on Cattle farm, MPKV (Maharashtra). Four models viz. gamma-type function, quadratic model, mixed log function and Wilmink model were fitted to each lactation separately and then compared on the basis of goodness of fit measures viz. adjusted $R^2$, root mean square error (RMSE), Akaike's Informaion Criteria (AIC) and Bayesian Information Criteria (BIC). Results: In general, highest milk yield was observed in fourth lactation whereas it was lowest in first lactation. Among the models investigated, mixed log function and gamma-type function provided best fit of the lactation curve of first and remaining lactations, respectively. Quadratic model gave least fit to lactation curve in almost all lactations. Peak yield was observed as highest and lowest in fourth and first lactation, respectively. Further, first lactation showed highest persistency but relatively higher time to achieve peak yield than other lactations. Conclusion: Lactation curve modelling using gamma-type function may be helpful to setting the management strategies at farm level, however, modelling must be optimized regularly before implementing them to enhance productivity in Gir crossbred cows.