• 제목/요약/키워드: project type criteria

검색결과 71건 처리시간 0.021초

환경영향평가 대상사업별 중점평가항목의 도출에 관한 연구 (Study on the Establishing a Guideline for Selecting Major Environmental Factors by the Project Type Criteria in EIA)

  • 성현찬;한상욱
    • 환경영향평가
    • /
    • 제3권1호
    • /
    • pp.9-30
    • /
    • 1994
  • Environmental Impact Assessment System, ever since its enactment in Korea fourteen years ago, has been steadily improved by introduction and implementation of new concepts and methodologies which include Environmental Impact Statement(EIS) preparation technique, selection of environmental factors, and the like. However, current guideline requires that every EIS, regardless of the specifics of the project type or characteristics of the site, must evaluate and study for all twenty-two environmental factors as set forth in the regulation. The situation causes many undesirable problems like; lack of site specific evaluation in most EISs, over-sized EIS drafts, consuming too much time and costs for EIS preparation, and so on. The objectives of this study are: - To establish a set of criteria to classify the types of the projects in terms of features of the project content and the characteristics of the site area. - To establish a guideline for selecting major environmental factors of the project type criteria, and - To provide basic materials for the preparation of complets draft EIS of the Amendment of Environmental Impact Assessment Act.

  • PDF

IT프로젝트 규모와 유형에 따른 IT투자 의사결정기준의 차이 (The Impact of IT Project Size and Types on IT Investment Decision Criteria)

  • 이국희
    • Journal of Information Technology Applications and Management
    • /
    • 제12권1호
    • /
    • pp.191-211
    • /
    • 2005
  • This study investigates the decision criteria used in the context of IT investment decision making and empirically analyzes the impact of IT project size and types on the importance of decision criteria. 5 criteria which have been extracted from the previous studies and industry practices are budget, financial benefits. strategic value. risk, and the degree of proposer's eagerness. Data of 120 IT project proposals have been collected from 5 companies including bank, insurance. and stock trading company. As results of ANOVA test. 7 out of 10 hypothesis have been accepted statistically. That is. the bigger the project size. the higher the evaluation weight of project budget and risk criteria and the lower the weight of proposer's eagerness. And in case of the infrastructure investment type. the emphasis is placed more on strategic value and risk criteria and less on financial benefit and proposer's eagerness. These findings provide insights for both IT practitioners and researchers.

  • PDF

개발사업 유형별 환경친화적 입지 및 검토기준 연구 (A Study on Environment-friendly Location & Review Criteria by Development Project Types)

  • 성현찬
    • 한국환경복원기술학회지
    • /
    • 제12권4호
    • /
    • pp.34-46
    • /
    • 2009
  • and to provide (case example-focused) guidelines for environment-friendly oriented plans. Key findings of this study are as follows : first, a total of 2,465 development projects covering $173km^2$ were undertaken in Gyeonggi province in last three years. Second, based on the analysis of 16 development projects in four types, about 20 alternative environment-friendly location were suggested. Thirdly, 56 environment-friendly criteria were suggested for the environmental assessment items by setting at least three alternatives. Going forward, if discussion case examples by project type, environment-friendly location criteria by project type, and environment friendly review criteria by assessment item suggested in this study are fully utilized when initiating or approving various development projects in the future, environment-friendliness will be enhanced in development projects.

지자체 공공건설사업의 발주방식 선정기준에 관한 연구 (AA Study on the Selection Criteria for Delivery Systems of Public Construction Projects in Local Governments)

  • 최은아;김병옥;이상범
    • 한국건축시공학회지
    • /
    • 제9권5호
    • /
    • pp.111-117
    • /
    • 2009
  • 건설공사는 복잡화, 다양화, 대형화 되고 있으며 이러한 다변화된 건설 환경에 대응하기 위해 건설 선진국에서는 다양한 발주방식을 도입 적용해 오고 있다. 국내에서도 지속적으로 발주제도를 개선해 오고 있으며, 최근에는 공공건설공사의 발주방식을 보다 다양화하려는 취지에서 국가계약법시행령 개정을 통해 "기술제안입찰", "설계공모 기술제안입찰"을 새로 도입하였다. 이러한 정부의 노력에 부합되도록 공공공사에 적절한 발주방식선정기준이 제시되어야 한다. 이에 본 연구에서는 기 발주된 건설 공사 실태 및 현황분석을 설문조사를 통하여 문제점을 정리하였고, 이 문제점에 대한 개선방안으로 사업유형별 발주방식 선정기준을 제시하였다.

부동산 개발사업 평가기준 및 지표 개발 (Development of Evaluation Criteria for Real Estate Development Projects)

  • 김성일;배유진;장철기
    • 한국건설관리학회논문집
    • /
    • 제16권2호
    • /
    • pp.86-96
    • /
    • 2015
  • 2000년대 PF(Project Financing)의 적극 활용을 통해 부동산개발 및 PF 시장이 급성장하였지만, 이후 세계금융위기의 여파로 부동산 경기 침체로 인해 상당수의 개발사업이 정상적으로 추진되지 못하게 되었다. 이러한 현상은 철저한 사업성 분석 없이 무리하게 사업을 추진한 것이 근본적인 원인으로 판단된다. 이에 본 연구에서는 부동산개발사업의 무분별한 추진을 억제하고 객관적인 평가가 가능하도록 기존 부동산개발사업 평가체계의 문제점을 짚어보고 이를 보완할 수 있는 부동산개발사업의 평가항목 및 평가기준 등을 평가수요 및 사업유형 등 사업의 성격에 맞게 적용할 수 있는 전반적인 평가체계를 제안하였다. 본 연구에서 제안한 부동산 평가체계 및 운영방안을 통해 부동산 평가체계를 제도화하여 표준화함으로써, 보다 일관성 있는 평가가 가능할 것으로 기대되며, 아울러 평가자료의 통일적 축적이 가능하게 될 것으로 기대된다.

IT아웃소싱의 타당성 결정을 위한 사전평가 방법론 (Pre-evaluation Methodology for Decision Making of IT Outsourcing's Feasibility)

  • 홍현기
    • 한국산학기술학회논문지
    • /
    • 제8권4호
    • /
    • pp.894-899
    • /
    • 2007
  • IT 아웃소싱은 이미 오래 전부터 추진되었다. 그러나 IT의 변화가 심하고, 규모가 커지고 있어 아웃소싱 사례가 늘어나고 있는 상황이다. 그러나 기업이 IT 아웃소싱을 추진해야 하는 의사결정을 하는 정확한 기준이 없다. 경쟁사가 아웃소싱을 하기 때문에, 또는 추세에 따라 따라가는 양태를 보이고 있다. 이에 본 연구는 기업의 사전평가를 통해 IT 아웃소싱을 하기 위한 판단 기준을 설정하였다. 통계적 분석 방법과 AHP분석 방법을 기반으로 측정 모형을 도출하였다. 또한 판단 기준을 설정하기 위한 측정 변수도 제시하였다. 따라서 본 연구의 결과를 활용하여 기업이 IT 아웃소싱을 추진하고자 의사결정을 하고자 한다면 본 연구에서 제시하는 방법론을 활용한다면 매우 수월할 것이다.

  • PDF

Decision-making Reliability Estimation Model based on Building Construction Project Participants' Experience

  • Kim, Chang-Won;Kim, Baek-Joong;Yoo, Wisung;Cho, Hunhee;Kang, Kyung-In
    • 한국건축시공학회지
    • /
    • 제13권2호
    • /
    • pp.148-158
    • /
    • 2013
  • Generally, building construction projects have a complex decision-making process because of the participation of various agents. In this situation, a final decision is arrived at by relying on subjective judgments based on the experience of project participants. For this reason, a method of assessing the objectivity of opinions is needed. In previous studies, the multi-criteria decision making method was applied to arrive at a final decision objectively, but this method has a limitation, in that the experience of each decision maker is not considered differently in the decision making process. Therefore, this study proposed a theoretical model using the S-shaped growth curve and regression analysis by building construction project type to quantitatively estimate decision-making reliability according to the experience of individual project participant`s. The developed model could be added to the Multi-criteria decision making method, and secure the objectivity and reliability of project participants' final opinion.

공동기술개발 프로젝트의 성패요인: 우리나라 전자부품 중소기업 분석 (Key Success Factors for Collaborative Technology Development Projects: The Case of Small & Medium Firms in the Korean Electronics Parts Industry)

  • 이광희;김영배
    • 기술혁신연구
    • /
    • 제6권2호
    • /
    • pp.122-158
    • /
    • 1998
  • This study empirically examined different patterns of collaborative R&D project with their key success factors(KSFs), using data from 82 projects in the Korean electronic parts industry. The patterns of R&D collaboration were categorized into 4 types by two criteria development motive(technology Push/market pull) and Project initiator (focal firm/partner). The bivariate relationships revealed that project characteristics (technological complexity, market uncertainty), management characteristics (participation in project formulation), problem solving characteristics(problem solving performance of the focal firm, users active role in problem solving, active role of university or research institute in problem solving) and success rates appear to be different among four types of collaboration. Each type of collaborative R&D projects also had different KSFs. The KSFs of type 1 (technology Push and focal firm initiation), for instance, include the strategic importance of the project, focal firms share of cost, active role of university or research institute in problem solving, while those of type 4(market pull and customer initiation) cover reliability of partner relationship, a time at partners involvement, information sharing. The findings suggest that the different contingencies brought different patterns and KSFs of collaborative R&D project, since different information, resources, and partners roles were needed to successfully implement the projects according to development motive and project initiator Finally, managerial, policy, and theoretical implications for the collaborative R&D activities in the Korean electronics parts industry were discussed, based on empirical results of this study.

  • PDF

On method calculation design flood elevation of esturial city

  • Wang Chao;Chao, Wang-Dong
    • 한국해안해양공학회:학술대회논문집
    • /
    • 한국해안해양공학회 1996년도 정기학술강연회 발표논문 초록집
    • /
    • pp.42-44
    • /
    • 1996
  • Recently due to repeatedly occurrence of flood, a lot of Chinese cities accept new design criteria for their protective project Most of them calculated by a certain type of probability distribution. In order to meet the demand of development economy the return period of design criteria is changed more longer and longer even 1000years, but the data which the calculation dependent on is only about 30-40 years. (omitted)

  • PDF

Non-linear modelling to describe lactation curve in Gir crossbred cows

  • Bangar, Yogesh C.;Verma, Med Ram
    • Journal of Animal Science and Technology
    • /
    • 제59권2호
    • /
    • pp.3.1-3.7
    • /
    • 2017
  • Background: The modelling of lactation curve provides guidelines in formulating farm managerial practices in dairy cows. The aim of the present study was to determine the suitable non-linear model which most accurately fitted to lactation curves of five lactations in 134 Gir crossbred cows reared in Research-CumDevelopment Project (RCDP) on Cattle farm, MPKV (Maharashtra). Four models viz. gamma-type function, quadratic model, mixed log function and Wilmink model were fitted to each lactation separately and then compared on the basis of goodness of fit measures viz. adjusted $R^2$, root mean square error (RMSE), Akaike's Informaion Criteria (AIC) and Bayesian Information Criteria (BIC). Results: In general, highest milk yield was observed in fourth lactation whereas it was lowest in first lactation. Among the models investigated, mixed log function and gamma-type function provided best fit of the lactation curve of first and remaining lactations, respectively. Quadratic model gave least fit to lactation curve in almost all lactations. Peak yield was observed as highest and lowest in fourth and first lactation, respectively. Further, first lactation showed highest persistency but relatively higher time to achieve peak yield than other lactations. Conclusion: Lactation curve modelling using gamma-type function may be helpful to setting the management strategies at farm level, however, modelling must be optimized regularly before implementing them to enhance productivity in Gir crossbred cows.