• 제목/요약/키워드: project team

검색결과 1,101건 처리시간 0.027초

선퇴 추출물의 Sprague-Dawley rat를 이용한 단회 경구 투여 독성시험 (Single Dose Oral Toxicity Study of Cicadidae Periostracum Extracts in Sprague-Dawley Rats)

  • 전병석;정희영;이수은;서윤수;김중선;남현화;이지혜
    • 대한본초학회지
    • /
    • 제39권3호
    • /
    • pp.107-114
    • /
    • 2024
  • Objective : Cicadae Periostracum (CP), which is the discarded shell of the Cryptotympana atrata (Fabricius, 1775), is a recognized component of oriental medicine for treatment sore throat, itching, shock, sedation, edema. However, the safety and toxicity of CP have not yet been established. It has been reported that symptoms of addiction or side effects may occur in patients who take high doses of CP or who are hypersensitive to it. Therefore, we investigated the acute toxicity of an CP extracts in Sprague-Dawley (SD) rats. Methods : To study acute toxicity, five SD rats of each sex per group were treated with CP extracts at single doses of 0, 500, 1000, or 2000 mg/kg administrated by oral gavage, and body weight, clinical signs, and mortality were observed after dosing. At the end of 14-day observation period, all animals were sacrificed and complete hematological and macroscopic examinations were performed. Results : There were no dead animal and test article-related effects on body weight change or the gross finding. No toxicologically significant results were observed between control and treated groups in hematology. Although salivation related to stress at the highest dose was observed in clinical signs immediately after administration, it is considered to have no toxicological significance. Conclusion : As the results, we did not find any adverse effect at the dose levels of 500, 1000, or 2000 mg/kg in rats. The minimal lethal dose was considered to be over 2000 mg/kg body weight in rats.

Ascent - Challenges and Advances of Tall Mass Timber Construction

  • Fernandez, Alejandro;Komp, Jordan;Peronto, John
    • 국제초고층학회논문집
    • /
    • 제9권3호
    • /
    • pp.235-244
    • /
    • 2020
  • Ascent, a 25 story residential tower located in Milwaukee, WI (USA), will become the tallest timber building in the world upon completion. This paper discusses the project's structural system, permit process, groundbreaking project specific testing, and several of the challenges the team overcame, all of which open the door to future Mass Timber projects; particularly in the United States.

Database Program for Managing Management Resources: General Contractor's Perspectives

  • Yong-Woo Kim;Sungwon Shin
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1100-1106
    • /
    • 2009
  • General contractors' overhead costs are increasing relative to direct costs. However, it is difficult to apply the traditional activity-based costing directly to the construction site overhead costing because the resource consumption rate per each activity is varied depending on the attributes of activities. The research develops a methodology of hybrid cost allocation system when resources are assigned to cost objects unlike the traditional activity-based costing. The study also develops a database program and demonstrates how it can be applied to the construction projects using a case study.

  • PDF

요르단연구로건설사업 문서관리시스템 구축 (Establishment of Document Control System for the Jordan Research and Training Reactor Project)

  • 박국남;고영철;우상익;오수열;이두정
    • 산업경영시스템학회지
    • /
    • 제34권4호
    • /
    • pp.49-56
    • /
    • 2011
  • The Project of Jordan Research and Training Reactor (JRTR) officially launched in Aug. 2010. JRTR is the first made-in-Korea nuclear system to be built abroad by year 2015, and Korea Atomic Energy Research Institute (KAERI) is responsible for the design of major systems including the reactor core. While the PDCS (Project Document Control System) being operated by EPC company controls all the documents of the whole Project, KAERI is supposed to have its own system for KAERI documents. Meeting such a need; KAERI has implemented a document control for the JRTR Project into already existing ANSIM (KAERI Advanced Nuclear Safety Information Management) system. The documents of JRTR project to be controlled are defined in the PPM (Project Procedures Manual), QAP (Quality Assurance Procedure) and PEP (Project Execution Program). The ANSIM consists of the document management holder, document container holder and organization management holder. The document management holder, which is the most important part of ANSIM-JRTR, consists of the DDA (Document Distribution for Agreement), IOC (Inter-office Correspondence), PM Memo. (Project Manager Memorandum) and cover sheets of design documents. Other materials such as meeting minutes, sub-department materials and design information materials are stored in an independent COP (Community of Practice). This established computerized document control system, ANSIM, could lessen a burden for project management team and enhance the productivity as well.

THE INFLUENCE OF THE PROJECT MANAGER ON THE SUCCESS OF THE CONSTRUCTION PROJECTS

  • Mahdi M Abdulsamad Ali;Nicholas Chileshe
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.345-353
    • /
    • 2009
  • The success and failure of any project depends upon many factors, the Project Manager is considered to be the key contributor to the success of any project, as well as a guide to the team members to achieve the client satisfaction (Cost, Time and Quality). Therefore the main aim of this paper is to provide a practical approach for understanding the importance of the Project Manager and his effectiveness to the success of the construction projects. In addition, the Project Manager's roles, responsibilities and duties have direct impact to the success of the construction projects. In order to identify the thoughts and opinion of the construction industry on this particular assertion, a quantitative study was carried out within the UK construction industry. The result of the study shows that there is an extremely strong correlation between the Project Manager and the success of the construction projects. In construction projects the Project Manager is considered to be one of the most important people who can lead and drive the projects in the right direction and conclude construction projects successfully. Moreover, these can play the most important role regarding the improvement of the organization's performance, the organization's profitability and the client's satisfaction. The research confirmed that the Project Manager is a very essential element to the success of the construction project and have an impact at every stage of the construction project. So it concluded that selection of a Project Manager should be carefully done with regard to experience, knowledge, power/authority and good understanding to the kind of the project.

  • PDF

한국에서 대학교과과정과 연계된 환경영향평가사 자격부여에 관한 연구 (Study on the Certificate System of the EIA Project Manager through Collaborative University Curriculum in Korea)

  • 김임순;한상욱
    • 환경영향평가
    • /
    • 제17권1호
    • /
    • pp.81-95
    • /
    • 2008
  • The study is intended to develop the measures to introduce the Environmental Impact Assessment (EIA) project manager (Environmental Assessor), who will be responsible for leading the EIA task. This role requires a quality standard of expertise in the area of natural science, social science, knowledge and technology on environment design mechanism, and the integrated approaches that combine the relevant policies and systems. To facilitate the system, the certificate will be given to the person who is well acquainted with the knowledge on EIA with relevant experiences, thereby authorizing them to coordinate the assessment task for reliable outcome. Hence, the need for introducing the system is very crucial. The EIA project manager, as a guide for an EIA project team, shall be the person who has a comprehensive understanding of the project, the knowledge about the principal for implementation of EIA and the expertise in structuring the management system, with a skill to maintain the good relationship with the people engaged in the project. To that end, it is highly recommended to set up such a certificate system to be incorporated in the college curriculum.

원자력발전소 Work Breakdown Structure 개발 (Development of Work Breakdown Structure for Nuclear Power Plant)

  • 조영혁;양명덕
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2014년도 춘계 학술논문 발표대회
    • /
    • pp.52-53
    • /
    • 2014
  • The Work Breakdown Structure (WBS) is a primary tool which provides a framework that defines clear scope of all deliverables throughout the project life cycle. Once the WBS is established in projects, it should allow project team members to measure and manage work performances by the WBS; further, it should provide a reference point when any work scope needs to be redefined. Based on the project information in the Progress and Performance Measurement System (PPMS) of UAE's Barakha Nuclear Power Plant (BNPP) projects, an attempt was made to develop a new WBS which provides hierarchical and systematical decomposition of the total work scope of NPP construction projects while avoiding from the preexistence concept in Korean NPP projects that the WBS is a combination of Physical Breakdown Structure (PBS) and Functional Breakdown Structure (FBS). The unique features of the new WBS are as follows: (1) defined the definition of each level of the WBS, (2) subdivided the WBS into 5 hierarchical levels, and (3) adopted globally used general coding structure. The new WBS provides a basic hierarchical structure for the project scope and can be used as a basic tool for schedule control, performance measurement, project status monitoring, and communication among project participants. In addition, by putting the Work Package (WP) under the WBS, the Earned Value Management System (EVMS) per WP can be utilized for the project.

  • PDF

SI 프로젝트팀 내 발생 갈등현상에 관한 비교사례연구

  • 박상희;조남재
    • 한국데이타베이스학회:학술대회논문집
    • /
    • 한국데이타베이스학회 2010년도 춘계국제학술대회
    • /
    • pp.109-123
    • /
    • 2010
  • Compared to research on the success of IT projects In general, research on the management of conflict in IT teams and its impact on project success is insufficient. This research performed a comparative study to analyze the nature and evolving phenomenon of conflicts in IT project teams. This study aimed at; First, Why a conflict is created within and around an IT project team. Second, What is the phenomenon of conflict evolution, diffusion, and/or resolution? Third, How the differences in conflict management style affects the IT project performance? Three propositions were drawn from the analysis of two intensive analysis of conflict cases and their comparison. Proposition 1 : Both 'the method of pointing out a problem' and 'the pointed-out contents' can be the trigger of conflicts around an IT project. Proposition 2 : While the focus of attention of one party is 'the method of pointing out a problem', if the other's and focus of attention of one party is 'the pointed-out contents', that is, if the focus of attention mismatch, the conflict can be amplified. Proposition 3 : According to the temporal nature of the relationship, e.g., short-term versus long-term, the way people approach and deal with the conflict differs.

  • PDF

CM(ConstructionManagement)에의 효율적 BIM활용에 관한 연구 (A Study on the good use of Construction Management Model based on BIM)

  • 민영기;김경준
    • 한국디지털건축인테리어학회논문집
    • /
    • 제10권3호
    • /
    • pp.87-95
    • /
    • 2010
  • The CM(Construction Manager) of D-university has been seeking the advice of my BIM-team to adopt CM(Construction Management) and BIM best practices to improve project delivery results, and has authored best practice reports for spatial validation, BIM, 3D, 4D and 5D performance. Building Information Modeling(BIM) Process, Integration, and Adoption looks at BIM implementation from a company and project level laying out a process for companies to use BIM. Following this studies, participants will be able to: 1. BIM participants has been creating a BIM process diagram for a project, and has been evaluating and selecting process options for a specific BIM project. 2. BIM participants has been describing the roles and responsibilities of participants in the BIM process, and has been communicating the BIM process to management, colleagues, and project stakeholders. 3. BIM participants has been identified consistent factors influencing BIM return on investment at the project level and the company level, and has been outlining a process for BIM adoption on the project level and company level.

프로젝트기반 학습 방법을 적용한 협동프로젝트 교과과정 (Collaborative Project Curriculum applying Project-based Learning)

  • 조정원;김지혜
    • 한국산학기술학회논문지
    • /
    • 제11권1호
    • /
    • pp.214-219
    • /
    • 2010
  • 정보통신을 포함한 여러 분야의 실무현장에서 요구하고 있는 인재의 역량이 대학에서 현실적으로 배출되고 있는 졸업생들과는 큰 차이를 보이고 있는 것이 사실이다. 본 논문에서는 체제적인 문제해결력을 갖춘 현장적합성 전문가를 양성하기 위해 프로젝트기반 학습 방법을 적용한 협동프로젝트 교과과정을 제안한다. 본 교과과정을 제주대학교 제주문화콘텐츠 전문인력양성사업단에 적용하여 학생들은 보고서 작성 능력, 발표 능력, 팀원들과의 공동 작업 능력, 문제해결 능력 등의 체제적인 팀 프로젝트 수행 능력을 신장시킬 수 있음을 확인하였으며, 학습자들의 만족도도 매우 높아 다른 여러 분야에도 성공적으로 적용 확장해나갈 수 있을 것으로 기대된다.