• 제목/요약/키워드: project size

검색결과 917건 처리시간 0.032초

행정구역에 기초한 어촌지역의 유형구분과 지역개발방향 (The Classification and Regional Development's Direction of Rural Fishing Area Based on Administrative District)

  • 김정태
    • 농촌계획
    • /
    • 제19권4호
    • /
    • pp.81-93
    • /
    • 2013
  • The selection of land for fishing village development project, and the standard used to classify fishing villages has been determined based on the guidelines developed by fishing village cooperatives. The approach fishing village cooperatives follows is likely to classify fishing villages without first reflecting on the overall development environment of the region, such as other industries and workers in the area. It also acts as a barrier for business promotion or evaluation, because the cooperatives do not match the administrative districts, which are the units of administration, and the main policy enforcement agent in regional development. Against this background, this study aimed to identify categories to situate the development direction, as well as the size and distribution of fishing villages based on eup, myeon, and dong administrative units as defined by the Fishing Villages and Fishery Harbors Act. This study was based on the Census of Agriculture, Forestry, and Fisheries of 2010, and analyzed 826 eups, myeon, and dongs with fishery households using the principal component analysis, and 2-Step cluster analysis methods. Therefore, 95% of the variance was explained using the covariance matrix for types of fishing villages, but it was analyzed as one component focusing on the number and ratio of fishery households, and used the cluster-type analysis, which focused on the sizes of fishing villages. The clusters were categorized into three types: (1) the development type based on the number of fishermen in the eups, myeons and dongs was analyzed as village size (682); (2) administrative district size (121); and (3) total eups, myeons and dongs (23), which revealed that the size of most fishing villages was small. We could explain 73% of the variance using the correlation coefficient matrix, which was divided into three types according to the three principal component scores, namely fishery household power, fishery industry power, and fishing village tourism power. Most fishing villages did not have a clear development direction because all business areas within the region were diversified, and 552 regions could be categorized under the harmonious development type, which is in need of balanced development. The fishery industry type typified by industrial strength included 159 regions in need of an approach based on industrialization of fishery product processing. Specialized production areas, which specialized in producing fishery products, were 115 regions with a high percentage of fishermen. The analysis results indicated that various situations in terms of size and development of fishing villages existed. However, because several regions exist in the form of small village units, it was necessary to approach the project in a manner that directed the diversification of regional development projects, such as places for local residents to relax or enjoy tourism experiences within the region, while considering the overall conditions of the relevant eups, myeons, and dongs. Reinforcement of individual support for fishermen based on the Fisheries Act must take precedence over providing support for fishermen through regional development. In addition, it is necessary to approach the development of fishing villages by focusing on industrializing the processing techniques of fishery products. Areas specialized in the production of fishery products are required to consider the facilities for fisheries production, and must make efforts to increase fishery resources, such as releasing fry.

CBR을 활용한 해외건설 수익성 예측 모델 개발 - 중소·중견기업을 중심으로 - (A Profit Prediction Model in the International Construction Market - focusing on Small and Medium Sized Construction Companies)

  • 황건욱;장우식;박찬영;한승헌;김종성
    • 한국건설관리학회논문집
    • /
    • 제16권4호
    • /
    • pp.50-59
    • /
    • 2015
  • 한국 건설 기업들의 해외 진출이 기하급수적으로 늘어나고 있지만 프로젝트를 수행함에 있어 사업의 수익률은 대기업과 경험이 부족한 중소기업을 비교하였을 때 큰 차이가 나타난다(대기업 5건 중 1건 적자, 중소기업 3건 중 1건 적자 공사). 또한 경험이 부족한 중소, 중견 기업들, 특히 하도급 업체에게는 프로젝트 참여시 사업의 적절성을 판단하기란 어려우며 그에 따른 수익률 또한 예측하기 어렵다. 이에 본 연구는 중소/중견 업체, 특히 하도급 업체 관점에서 해외 건설공사 진출 시 수익률에 영향을 미치는 영향인자를 도출하기 위해 1965년부터 시행된 8,637건의 해외건설 준공데이터 및 문헌고찰 기반으로 수익률에 영향을 미치는 10개 인자를 도출 후 다중회귀분석을 통해 영향인자 간 가중치를 도출하였다. 이를 기반으로 사례기반 추론 기법을 이용하여 수익률 예측 모델을 개발하였으며, Type1 &Type2 error 분석을 통해 검증 결과 11%의 오차율을 보였다. 이러한 수익성 예측 모델을 활용하여 국내 건설 하도급업체들은 해외건설공사 진출 시 해당 프로젝트의 수익성 분포를 사전에 확인하여 양질의 프로젝트를 선별하고, 사업 참여의 의사결정에 중요한 참고자료가 될 것을 기대한다.

통계분석을 이용한 CCPM 기법에서의 버퍼 산정방법 (Buffer Sizing Method of CCPM Technique Using Statistical Analysis)

  • 유정초;황보택근
    • 한국콘텐츠학회논문지
    • /
    • 제12권8호
    • /
    • pp.29-36
    • /
    • 2012
  • CCPM 기법에서는 프로젝트 버퍼의 크기를 결정하기 위해 일반적으로 자르고 붙이는 방법과 루트-제곱하는 방법을 사용한다. 하지만 이러한 방법은 프로젝트의 특성을 고려하지 않고 고정된 공식을 통해서만 계산하기 때문에 버퍼의 크기가 너무 커지거나 작아지는 경우가 자주 발생했다. 본 논문에서는 위의 문제점을 해결하기 위해 이전 작업의 결과를 통계 분석하여 각 작업자에 대한 각 임무의 종류에 따른 작업의 특징을 파악하고 이를 CCPM 기법에 활용하여 해당 특징을 기준으로 버퍼 크기를 산정하는 새 방법을 제시하였다. 몬테카를로 시뮬레이션 환경에서 임무의 수, 임무의 어려운 정도 등의 요소를 반영하여 나온 결과를 비교분석 해서 본 논문에서 제안한 방법이 기존의 방법에 비해 임무 수와 상관없이 안정된 완공확률을 유지할 수 있음을 확인하였다. 또한 특정 작업자가 일찍 완공할 수 있는 임무들의 경우 제안한 방법은 기존 방법보다 버퍼의 크기를 더 단축하는 것을 확인하였다.

거점확산형 주거환경개선 시범사업 실태조사 및 개선방향 연구 (Site Analysis and Improvements on Pilot Project of Core-Based Residential Environment Improvement)

  • 백혜선;이영환;김재승
    • 한국주거학회논문집
    • /
    • 제27권4호
    • /
    • pp.1-11
    • /
    • 2016
  • This study aims to find out the cause of delay by analyzing the process of 12 Core-based Improvement pilot projects, especially focused on lands, buildings, population status. For this purpose, it performed a literature research on maintenance plan reports, various statistics of building and population status analysis, a field research and an individual interview with public officials in charge at local governments of 12 project districts. The findings are as follows; 1) it was difficult to cope flexibly to environmental changes because the core sector was so large that the plan was led to areal improvement. 2) the project was selected without reflecting the characteristics of the core sector and the area of residents-led renovation properly in terms of building status such as building density and old buildings ratio, 3) the coordinator group for socially disadvantaged class in the district was not operated and thus foundation for residents-led renovation was not set up. In conclusion, it should be presented the proper size of the core sector when the core-based residential environment improvement project is initiated in the future. In addition, building status is taken into consideration when designating the core sector and the area of residents-led renovation. The coordinator group needs to be operated from the early stage of the project as well.

건설프로젝트 수주에 대한 시장의 평가 (Assessment of Equity Market Responses on the Construction Project Awards)

  • 최종수;허성태;이희민
    • 한국건축시공학회지
    • /
    • 제10권1호
    • /
    • pp.221-228
    • /
    • 2010
  • 건설사의 성과는 개별프로젝트의 성과에 따라 다르게 나타날 수 있으며 프로젝트의 수주는 이러한 의미에서 중요한 의미를 가지게 된다. 그러나 현재까지 프로젝트 수주와 관련한 성과평가에 대한 연구는 거의 전무한 실정이다. 본 사건분석 연구에서는 프로젝트 수주 날자를 중심으로 구간을 설정하여 건설프로젝트 수주에 대한 시장의 반응을 분석하였다. 총 252개의 프로젝트를 엄정한 선별기준에 의거 수집하여 분석을 실시하였으며 분석에는 누적수익률 산정방법을 채택하였다. 분석결과에 의하면 전체 샘플에 대한 누적 수익률은 양(+)으로 나타났으며 통계적으로도 유의한 수준인 것으로 분석되었다. 한편, 프로젝트 수주규모와 수익률 수준의 상관관계 분석에서는 어떠한 상관성도 발견되지 않은 것으로 나타났다. 이 외에 프로젝트를 특성에 따라 다양한 그룹으로 구분하여 누적수익률에 대한 비교분석 결과를 제시하였다. 본 논문에서는 위와 같은 결과 외에 다양한 분석결과가 의미하는 시사점에 대하여 논의하였다.

MULTI-SCALE MODELING AND ANALYSIS OF CONVECTIVE BOILING: TOWARDS THE PREDICTION OF CHF IN ROD BUNDLES

  • Niceno, B.;Sato, Y.;Badillo, A.;Andreani, M.
    • Nuclear Engineering and Technology
    • /
    • 제42권6호
    • /
    • pp.620-635
    • /
    • 2010
  • In this paper we describe current activities on the project Multi-Scale Modeling and Analysis of convective boiling (MSMA), conducted jointly by the Paul Scherrer Institute (PSI) and the Swiss Nuclear Utilities (Swissnuclear). The long-term aim of the MSMA project is to formulate improved closure laws for Computational Fluid Dynamics (CFD) simulations for prediction of convective boiling and eventually of the Critical Heat Flux (CHF). As boiling is controlled by the competition of numerous phenomena at various length and time scales, a multi-scale approach is employed to tackle the problem at different scales. In the MSMA project, the scales on which we focus range from the CFD scale (macro-scale), bubble size scale (meso-scale), liquid micro-layer and triple interline scale (micro-scale), and molecular scale (nano-scale). The current focus of the project is on micro- and meso-scales modeling. The numerical framework comprises a highly efficient, parallel DNS solver, the PSI-BOIL code. The code has incorporated an Immersed Boundary Method (IBM) to tackle complex geometries. For simulation of meso-scales (bubbles), we use the Constrained Interpolation Profile method: Conservative Semi-Lagrangian $2^{nd}$ order (CIP-CSL2). The phase change is described either by applying conventional jump conditions at the interface, or by using the Phase Field (PF) approach. In this work, we present selected results for flows in complex geometry using the IBM, selected bubbly flow simulations using the CIP-CSL2 method and results for phase change using the PF approach. In the subsequent stage of the project, the importance of effects of nano-scale processes on the global boiling heat transfer will be evaluated. To validate the models, more experimental information will be needed in the future, so it is expected that the MSMA project will become the seed for a long-term, combined theoretical and experimental program.

CDM 사업부문별 투자비용 결정요인 분석: 폐기물 부문을 대상으로 (An Analysis on the Invest Determinants of CDM Project: Evidence from Waste Handling and Disposal Sector)

  • 김지훈;임성수
    • 한국유기농업학회지
    • /
    • 제28권4호
    • /
    • pp.535-553
    • /
    • 2020
  • In this study, the characteristics of the waste sector CDM project were analyzed through cluster analysis of the waste sector CDM project and the analysis of the CDM investment cost in waste sector using CDM project data registered with UNFCCC since 2008 when EU ETS phase 2 began. As of September 2020, 772 cases of CDM projects in waste disposal and disposal are registered. Biogas technology is the largest, followed by livestock manure processing and biomass production technology. The results of the cluster analysis are summarized as follows: First, on average, projects utilizing AWMS technology are small in size and relatively low in investment costs. This is judged to be relatively low investment costs due to previously attracted foreign investment capital. Second, the average investment cost of CDM projects considered along with waste (No.13), the energy industry (No.1) and agriculture (No.15) was higher than those involving only waste. The analysis of the factors determining the investment cost of the waste sector CDM project showed that, as with cluster analysis, the AWMS technology, which is a livestock manure treatment technology, was lower in the investment cost than those that use other technologies. As a result of multiple regression analysis, the investment cost of the CDM project was analyzed lower in the order of biomass, AWMS, LFG and biogas. Also, the higher the investment cost for CDM projects linked to waste, energy and agriculture, and the better the investment environment, the higher the investment cost. Although no statistical feasibility was obtained, the larger the annual emission reduction, the lower the CDM investment cost.

MR-based Partial Volume Correction for $^{18}$F-PET Data Using Hoffman Brain Phantom

  • Kim, D. H.;Kim, H. J.;H. K. Jeong;H. K. Son;W. S. Kang;H. Jung;S. I. Hong;M. Yun;Lee, J. D.
    • 한국의학물리학회:학술대회논문집
    • /
    • 한국의학물리학회 2002년도 Proceedings
    • /
    • pp.322-323
    • /
    • 2002
  • Partial volume averaging effect of PET data influences on the accuracy of quantitative measurements of regional brain metabolism because spatial resolution of PET is limited. The purpose of this study was to evaluate the accuracy of partial volume correction carried out on $^{18}$ F-PET images using Hoffman brain phantom. $^{18}$ F-PET Hoffman phantom images were co-registered to MR slices of the same phantom. All the MR slices of the phantom were then segmented to be binary images. Each of these binary images was convolved in 2 dimensions with the spatial resolution of the PET. The original PET images were then divided by the smoothed binary images in slice-by-slice, voxel-by-voxel basis resulting in larger PET image volume in size. This enlarged partial volume corrected PET image volume was multiplied by original binary image volume to exclude extracortical region. The evaluation of partial volume corrected PET image volume was performed by region of interests (ROI) analysis applying ROIs, which were drawn on cortical regions of the original MR image slices, to corrected and original PET image volume. From the ROI analysis, range of regional mean values increases of partial volume corrected PET images was 4 to 14%, and average increase for all the ROIs was about 10% in this phantom study. Hoffman brain phantom study was useful for the objective evaluation of the partial volume correction method. This MR-based correction method would be applicable to patients in the. quantitative analysis of FDG-PET studies.

  • PDF

프로젝트 일정 단축을 위한 새로운 경영 패러다임 Critical Chain Project Management(CCPM) (Critical Chain Project Management as a New Paradigm for Reducing the Project Delivery Time)

  • 장성용
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2007년도 정기학술발표대회 논문집
    • /
    • pp.68-74
    • /
    • 2007
  • CCPM(Critical Chain Project Management)은 기존의 사업관리 방법론인 PERT/CPM의 장점을 살리고 단점을 보완한 것으로서 각 과업의 예상 작업시간을 여유시간(padding)을 제거한 평균작업시간을 사용하고 핵심자원(Bottleneck)의 자원경합을 해소한 후 크리티컬 체인을 결정하고 일정계획을 수립하되, 각 과업의 여유시간의 일정 부분을 크리티컬 체인의 뒤에 공통의 프로젝트 버퍼(buffer)로 두어 일정관리 상의 변동을 흡수할 수 있도록 고안되었다. 또한 크리티컬체인에 포함되지 않은 비크리티컬 체인에 속한 과업들이 전체 일정의 지연을 초래하는 것을 방지하기 위해 공급버퍼를 두어 변동을 흡수할 수 있도록 하였으며, 자원의 조달 상의 불확실성을 완화하기 위해 자원 버퍼를 두고 있다. 프로젝트 버퍼 빛 공급 버퍼 관리를 통해 일상적인 일반변동 요인(common cause variation)에 일정 지연 흡수뿐 아니라 특별변동 요인(special cause variation)에 의한 위험의 관리 및 완화가 가능하도록 되어 있다. 프로젝트 버퍼 및 공급버퍼의 크기는 일반적으로 해당 체인의 전체 길이 1/2을 사용한다. 버퍼관리가 프로젝트 실행 및 통제 매커니즘으로 활용된다. 버퍼관리에서는 버퍼길이를 OK 영역, 주시 및 계획 영역 그리고 행동영역으로 나누고, 프로젝트 상태가 주시 및 계획 영역에 진힙하게 되면 위험상태에 대비해서 비상조치계획을 수립하며, 행동역역에 들어가게 되면 계획된 비상조치계획을 실행함으로써 일정지연을 만화하게 된다. CCPM에서는 작업자들은 자신의 작업을 최선을 다해 열심히 일하고 과업 종료시 즉시 프로젝트 책임자에게 보곰함으로써 후속 과업이 조기에 작업을 개시할 수 있는 릴레이경주 방식의 작업 메커니즘을 따르도록 요청받게 된다. 또한 일정 지연의 가장 큰 주범인 멀티태스킹 작업은 철저하게 금지되도록 관리한다.

  • PDF

최적사업규모 결정을 통한 유역치수계획의 대안수립 방안 (Alternatives Development for Basin-wide Flood Mitigation Planning by Determining Economic Optimal Project Size)

  • 이충성;심명필;이상원
    • 한국수자원학회논문집
    • /
    • 제43권5호
    • /
    • pp.495-505
    • /
    • 2010
  • 유역단위의 통합적 치수계획은 고려되는 단위사업의 수가 많고 그 특성도 다양하므로 이들을 조합한 최적의 대안을 수립하기가 쉽지 않다. 최적의 대안수립을 위해서는 홍수피해를 산정하는 것뿐만 아니라 감내할 수 있는 피해의 수준을 결정해야만 한다. 이에 대한 결정은 큰 틀에서 '사회적 합의'라는 방식으로 도출되지만 일차적으로는 기술적으로 가능한 범주에서 경제적 효율성 측면의 분석을 필요로 한다. 본 연구의 목적은 각 단위사업들의 조합이 경제적 효율성을 갖도록 하는 대안수립 방법을 제시하는 것이다. 이를 위해서 치수사업을 투입과 산출에 의한 경제학적 생산활동으로 정의하고 최적사업규모를 대안수립의 원칙으로 제시하였다. 본 연구는 기존에 공학적 측면에만 의존하던 대안수립 방법을 개선하여 경제적 측면에서 최적사업규모를 고려하였다는 데에 의의가 있다. 이러한 대안수립 방법은 하천중심의 소극적 치수계획을 지양하고 피해지역 중심의 유역단위 치수계획 수립으로 전환되고 있는 최근의 정부정책 방향에도 부합하며, 정책수립을 위한 효과적인 수단을 제공할 수 있을 것으로 기대된다.