Buffer Sizing Method of CCPM Technique Using Statistical Analysis  

Liu, Jing-Chao (가천대학교 일반대학원 전자계산학과)
WhangBo, Taeg-Keun (가천대학교 일반대학원 전자계산학과)
Publication Information
Abstract
In CCPM Technique, as the buffer size calculation method, the Cut and Paste(C&P) method and the Root Square Error (RSE) method for all tasks carried out the same treatment, without considering the actual situation and characteristics of the task, the lack of reasonable judgment, is too simple and hasty. In this paper, taking into account the limitations of existing methods, a new method of buffer sizing method based on statistical analysis was introduced. It makes statistical analysis for the relationship between each worker and a variety of tasks, and use the information to predict the next task time. In order to verify the effectiveness of the new method, according to different task difficulty and the number of tasks set up the project. Use C&P, RSE method and new methods to predict the time of the project. Through Monte Carlo Simulation to simulate the project time, a comparison of three methods of performance. The results show that the new method can achieve the managers expect the probability of completion, and for those tasks can be completed ahead of schedule, the new method can save project time.
Keywords
Critical Chain; Project Management; Scheduling; Project Buffer;
Citations & Related Records
연도 인용수 순위
  • Reference
1 Goldratt, Critical Chain, North River Press, 1997.
2 O. Tukel, W. Rom, S. Eksioglu, An Investigation of Buffer Sizing Techniques in Critical Chain Scheduling[J], European Journal of Operational Research, Vol.172, No.2, 2006.
3 L. X. Yang, S. Q. Li, X. B. Huang, and T. Peng, "A Buffer Sizing Approach in Critical Chain Scheduling with Attributes Dependent," Industrial Engineering and Managenment, No.1, pp.11-13, 2009.
4 L. Ma, Z. L. Guan, M. He, X. Y. Shao, "Research on the adaptive buffer sizing method based on the critical chain theory," J.Huazhong Univ. of Sci. & Tech. (Natural Science Edition), Vol.36, No.11, pp.80-82, 2008.
5 C. C. Chu, "Buffer sizing and critical chain project management," Computer Integrated Manufacturing Systems, Vol.14, No.5, 2008.
6 http://terms.naver.com/entry.nhn?docId=4195
7 신기영, CCPM 일정관리 기법의 조선산업 적용 방안에 관한 연구, 부산대학교, 공학석사학위, 2009.
8 鄭福圭, PERT.CPM과 工程管理, 貿易經營社, 1978.
9 郭桂煥, PERT 理論과 實際: 合理的인 工程管理 技法, 건설연구사, 1986.
10 이동근, CCPM에서의 버퍼관리에 대한 연구, 울산대학교, 공학석사 학위, 2011.
11 W. Herroelen, Critical Chain Project Scheduling: Do Not Oversimplify[J], Project Managemetn Journal, Vol.12, 2002.
12 http://www.goldratt.co.uk/resources/
13 김현수, 안연식, 김동수, 프로젝트관리, 전자신문사, 2005.
14 강창욱, 심창생 등 지은, 경쟁우위 확보를 위한 프로젝트 관리학, 도서출판 북파일, 2008.