Methods of Reviewing Constructability of Nuclear Power Plants Utilizing a Data-based Technology

  • Kim, Woo Joong;Lim, Byung Ki;Byon, SuJin
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.147-149
    • /
    • 2015
  • A nuclear power plant construction project normally involves a large construction work of which the total project cost is over 5 trillion Won, Such a large-scale construction project has the risks of schedule delay and quality degradation due to increase in project cost, because designs are changed due to design errors. The reasons for design changes during installation are 1) insufficient engineering capability of the owner, 2) information discontinuance due to the multiple package method, and 3) inefficient constructability review processes. Accordingly, this study proposes, through problem analysis, a method of developing a constructability review system that utilizes constructability review processes and a data-based technology (3D modeling) that are optimized for nuclear power plant construction projects. It also presents a method of establishing a system for reviewing constructability in which constructability review processes and a Database (3D model, Schedule, Design change Items) are linked each other.

  • PDF

Development of Review Processes and Tools for Liquidated Damages for EPC/Turnkey Project: Contractor's Perspective

  • Hahn, Ki Jeong;Lee, Eul-Bum;Kim, Young Ho
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.718-719
    • /
    • 2015
  • As a recent global trend, the majority of plant projects are delivered through EPC or EPC-turnkey contracts, where a contractor's liability is more complicated because of the mega size scale and financing method. Previous researches have been lacking a practical usability for project members for liabilities of contracts. Those were focused on solving the claims or schedule calculation issues only. The objective of the present study was to develop a validation process for LDs (liquidated damages) in contractor's liabilities with various case studies and expert judgments. As summarized in this paper, the processes and tools were developed with project life cycle process. The project preparation phase includes 3 step check lists to determine the Go or No-go for projects. In progress phase, contractors should focus on the response strategies for claims with liabilities. The study concludes that those developed processes and tools will help to manage risk of LDs for the contractors in the overseas projects.

  • PDF

Decision-Making Process in Rural Reconstruction Project - An Evaluation Technique for Village Planning in Newly Reclaimed Land - (농촌개발사업의 의사결정기구 -간척지 취락계획을 위한 평가체계의 수립-)

  • 최수형;황한철
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.35 no.4
    • /
    • pp.86-94
    • /
    • 1993
  • In this study, a tentative decision-making matrix for village planning in reclaimed land was proposed. The evaluating conditions in the matrix are reclaimed farming acreage and distance. And the indexes for evaluation works are farming acreage required for increasing present farm size to target size in the base of, allowable commuting distance for farming from and effective controlling distance of each village. The village planning strategies are considered into four categories ; upkeep of present village scale, transfer of its superfluous farming acreage to a neighbouring village, enlargement of present village scale and new village construction in reclaimed land. As a case study, the proposed decision-making matrix was applied to 69 villages, which are contiguous to the potential farming area from reclamation works of Yongsan River Basin Comprehensive Development Project Phase Ill and so considered in this study as future farming villages there. From the application results, the following tactics for village planning may be proposed ; principally, upkeep or enlargement of present village scale, but, in an exceptional few cases of standard farming size being 3~5ha, new village construction of normal or satellite scale.

  • PDF

A Study on the Applicability of ENERWATER for Evaluation of the Energy Consumption Label of WWTPs in Korea (국내 하수처리시설 에너지 등급 평가를 위한 ENERWATER의 적용 가능성에 관한 연구)

  • Park, Minoh;Lee, Hosik
    • Journal of Korean Society on Water Environment
    • /
    • v.38 no.5
    • /
    • pp.231-239
    • /
    • 2022
  • In this study, we applied ENERWATER to evaluate the energy consumption labeling of wastewater treatment plants in Korea using the Korea sewerage statistics data. The results showed that the energy label status was excellent in the SBR process for small and medium-scale wastewater treatment plants and the A2O process for large-scale wastewater treatment plants. The energy labeling of wastewater treatment plants of 50,000 tons capacity was excellent. The statuses of metropolitan cities and Jeollanam-do province were excellent. We analyzed the effects of renewable energy on wastewater treatment plants' energy consumption and found out that digestion gas for large-scale plants and photovoltaic energy for small-scale plants were effective in improving energy labeling. In addition, we compared the energy labels of four wastewater treatment plants in "Z" city and wastewater treatment plant "X" had the best energy label, and the wastewater treatment plants "V" and "Y" had to be selected as priorities for the energy diagnosis and improvement project. In a comprehensive conclusion, the applicability of ENERWATER was confirmed based on sewage statistics data and labeling can be used to set priorities for the energy diagnosis and improvement project.

A Study on Earned Value Management System (EVMS) For Project Using ERP System (ERP 시스템을 이용한 프로젝트 EVMS에 관한 연구)

  • Park, Je-Won;Lee, Chang-Ho
    • Journal of the Korea Safety Management & Science
    • /
    • v.12 no.4
    • /
    • pp.145-151
    • /
    • 2010
  • It seems that a primary concern of the project-based company, which provides a large scale product or service over long term period, is to run a successful project through systematic project process control and control costs. One of the typical project control methods is Earned Value Management System(EVMS) which analyses the precess through performance measurement. Even though the EVMS is a highly efficient tool in the managerial aspect, it cannot easily determine the Planned Value(PV), Actual Cost(AC), or Earned Value(EV) due to the indistinct criteria and extensive data. The accurate calculation of AC in particular, is the basic of project management, but most companies record direct personnel expenses or direct expenses only. Since they calculate indirect expenses based on the estimated ratio, it limits the systematic project management that reflects changes in profit and loss of a company. This study introduces a EVMS for project management and its actual case based on EVMS and ERP system which some additional modules are installed for performance measurement. It is expected that this new method enables a company to save time and effort, and also to improve transparency by specifying expense items in detail and to switch quarterly settlement to monthly by reducing the time of calculation.

Risk Analysis on Offshore Windfarm Industry in South Korea: Based on the Jeonnam Offshore Windfarm Project

  • Kim, Tae Hyun;Kim, Yea-Sang;Chin, Sangyoon;Pallesen, Kristian
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.204-212
    • /
    • 2022
  • Recently, the Korean government has been actively promoting the smart city as their strategic agenda. However, to build smart cities that are greener, the authors believe it is essential to rapidly transit conventional energy sources such as fossil fuels to renewable energy. Although there is a big potential for Offshore wind in Korea, there has not been a full-scale commercial offshore wind farm until today. Since Korea is relatively a new market compared to the EU, it can be risky for developers. The authors will introduce risk management best practices in the offshore wind industry applicable to the Korean environment. This paper will mainly introduce an offshore wind project size of 99 MW. The project is expecting a Finance Close (FC) in Q3 2022, so the project team has prepared a risk register with over 150 risks and levers throughout the project lifecycle. Overall risks include risks with Development Expenditure (DEVEX) impact, a Capital Expenditure (CAPEX) impact, and an Operating Expenditure (OPEX) impact. Based on the identified risks, a more qualitative assessment of Cost and Schedule Impact was conducted. In conclusion, a Monte Carlo simulation was performed to propose a quantitative risk assessment to evaluate a benchmark contingency of the project cost.

  • PDF

Resource-constrained Scheduling at Different Project Sizes

  • Lazari, Vasiliki;Chassiakos, Athanasios;Karatzas, Stylianos
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.196-203
    • /
    • 2022
  • The resource constrained scheduling problem (RCSP) constitutes one of the most challenging problems in Project Management, as it combines multiple parameters, contradicting objectives (project completion within certain deadlines, resource allocation within resource availability margins and with reduced fluctuations), strict constraints (precedence constraints between activities), while its complexity grows with the increase in the number of activities being executed. Due to the large solution space size, this work investigates the application of Genetic Algorithms to approximate the optimal resource alolocation and obtain optimal trade-offs between different project goals. This analysis uses the cost of exceeding the daily resource availability, the cost from the day-by-day resource movement in and out of the site and the cost for using resources day-by-day, to form the objective cost function. The model is applied in different case studies: 1 project consisting of 10 activities, 4 repetitive projects consisting of 40 activities in total and 16 repetitive projects consisting of 160 activities in total, in order to evaluate the effectiveness of the algorithm in different-size solution spaces and under alternative optimization criteria by examining the quality of the solution and the required computational time. The case studies 2 & 3 have been developed by building upon the recurrence of the unit/sub-project (10 activities), meaning that the initial problem is multiplied four and sixteen times respectively. The evaluation results indicate that the proposed model can efficiently provide reliable solutions with respect to the individual goals assigned in every case study regardless of the project scale.

  • PDF

Development of the Retrieval System of Information Flow for a Large-scale and Complex Construction Project using Information Transfer Relationship on Business Process (업무 정보전달관계를 이용한 대형복합건설사업의 정보흐름 색시스템 개발)

  • Shin, Jinho;Lee, Hyun-Soo;Park, Moonseo;Yu, Jung-Ho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.6
    • /
    • pp.84-93
    • /
    • 2012
  • The information generated from large and complex construction projects transfer and evolve in long-term business cycle. Therefore, while there is any problem, such as delay, the cause of the problem might relate to the previous business process rather than where it arises. However, for complex project players and business relationships, it is unsuitable to search an information flow using traditional retrieval methods. This research addresses a relationship-based information search system to analyze the information flow in large-scale and complex construction projects. First, we identified the components of the information retrieval system customizing for a large-scale complex construction projects, and then developed the inference algorithm which define the relationship between business processes. For the validation, we applied the system on a business information system of urban regeneration projects and suggested some application using information flow retrieval system for project players and project managers. Using the system, players are easy to prepare for their work process and managers can define the causal flow of the problem.

Design of Drilled Shafts Foundation by LRFD in Incheon Bridge Project (인천대교 민자구간의 대구경 현장타설 말뚝기초의 LRFD 설계 적용 사례)

  • Kim, Jeong-Hwan;Lee, Hyun-Gun;Shin, Hyun-Yang;Youn, Man-Geun
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2006.10a
    • /
    • pp.551-561
    • /
    • 2006
  • Incheon bridge project is to construct total 12km long bridges on the sea consist of 800m span length cable stayed bridge, approach bridge and viaduct bridge based on LRFD design specification. To design pile foundations by RCD of each bridge unit, total 4 number of preliminary full scale pile load tests with Osterberg cell method were carried out on the piles for testing. The test load was planned to more than the expected design ultimate capacity and about 29,000tons maximum load was recorded. From the interpretation of test results, design parameters are evaluated and applied to the design. Preliminary pile load test plan and detailed execution of pile load tests are introduced and summarized. The resistance factors are presented for pile design of Incheon Bridge Project in LRFD considering variation of ground conditions and number of test piles.

  • PDF

A study of the functional requirements to management tool for software development projects (소프트웨어 개발 프로젝트를 위한 요구관리도구의 기능요건 연구)

  • Park, Koo-Rack
    • Journal of the Korea Society of Computer and Information
    • /
    • v.16 no.12
    • /
    • pp.113-120
    • /
    • 2011
  • Information system gradually increases the complexity and scale of the project, while if the project fails to occur. To analyze the causes of failure of the project a lack of understanding of your project, unclear requirements and requirements change, etc. of the software development life cycle from requirements analysis phase is to find the source of most. In this paper, a software development project needs analysis derived from the traceability between features and functionality, and development needs throughout the life cycle requirements during the ongoing change management tool was designed to allow. And among those related to the project through consultation with a sufficient consensus to build a common understanding of effective communication will discuss the features required to support.