• 제목/요약/키워드: project risk management

검색결과 776건 처리시간 0.026초

프로젝트 위험관리강화를 통한 원가개선의 6시그마 사례 (A Case Study of Six Sigma Project for Reducing the Project Costs through Project Risk Management)

  • 정하성;이동화;이민구
    • 품질경영학회지
    • /
    • 제33권3호
    • /
    • pp.135-148
    • /
    • 2005
  • This paper considers a six sigma project for reducing the project costs through project risk management. The project follows a disciplined process of five phases: define, measure, analyze, improve, and control. A risk management process map is used to identify process input and output variables. Seven key process input variables are selected by using C&E diagram and X-Y matrix and finally four vital few input variables are selected by the related statistical analysis. The optimum alternatives of the vital few input variables are obtained by the method of PUGH matrix. The process is running on control plan and we obtained substantial project cost reductions in early stage of the control phase.

우주발사체 개발사업의 위험관리 프로세스 (A Process of the Risk Management for a Space Launch Vehicle R&D Project)

  • 조동현;유일상
    • 시스템엔지니어링학술지
    • /
    • 제12권2호
    • /
    • pp.19-27
    • /
    • 2016
  • Many countries concentrated on the space developments to enhance the national security and the people's quality of life. A space launch vehicle for accessing the space is a typical large complex system that is composed of the high-technology like high-performance, high-reliability, superhigh-pressure, etc. The project developing large complex system like space launcher is mostly conducted in the uncertain environment. To achieve a goal of the project, its success probability should be enhanced consistently by reducing its uncertainty during the life cycle: it's possible to reduce the project's uncertainty by performing the risk management (RM) that is a method for identifying and tracing potential risk factors in order to eliminate the risks of the project. In this paper, we introduce the risk management (RM) process applied for a Space Launch Vehicle R&D Project.

A BLOG BASED RISK MANAGEMENT SYSTEM USING SOFT SCHEDULE

  • Soo-Myeong Jin;You-Sang Yoon;Myung-Houn Jang;Sang-Wook Suh
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1334-1339
    • /
    • 2009
  • To achieve the best performance of a project, uncertainties involved in the building construction process need to be identified in the planning phase of the project. Uncertainties seldom create a positive impact on construction project, but they almost cause delay and increase costs. Therefore, risk management plays a significant role in construction to minimize risk occurred due to uncertainties of a project. Although the importance of the risk management has been known to the construction industry, it is not enough to be developed to meet the demands of the industry. It has not been enough for Systems to control schedule risks for managers in the field. Therefore, a tool is necessary to efficiently control risks. The propose of this study is to invent Schedule Risk Control System Module to prepare for risks in preconstruction phase.

  • PDF

Prioritization of Price Volatility Management Strategies in Construction Projects

  • Joukar, Alireza;Nahmens, Isabelina;Harvey, Craig
    • Journal of Construction Engineering and Project Management
    • /
    • 제7권3호
    • /
    • pp.15-25
    • /
    • 2017
  • The existence of material price volatility in construction projects puts forward substantial risks for all parties involved. Depending on the parties involved in the project, type of contracts, and state of the market various risk management strategies are practiced by contracting parties to manage project risks related to price volatility. Unfortunately, in many cases companies fail to select an adequate approach to better manage volatilities of material prices due to the lack of a decision support system to aid in the selection of an appropriate strategy based on the project characteristics. The aim of this study is to identify critical project factors and align them to documented strategies to manage price volatility based on an extensive literature review and industry interviews. This study found Integrated Project Delivery (IPD) as the ideal strategy with respect to project duration; quantitative risk management methods with respect to the cost; and Price Adjustment Clauses (PAC) with respect to the risk allocation, as the top price volatility management strategies.

품질도구를 활용한 제품개발 프로젝트관리 (A Study on Project Management for Product Development using Quality Tools)

  • 박영현
    • 품질경영학회지
    • /
    • 제45권4호
    • /
    • pp.665-676
    • /
    • 2017
  • Purpose: The purpose of this paper proposes an effective and systematic methods of risk management in product development project. Methods: This paper first discusses what risk factors be considered during product development period and then presented a model for preventive risk management. For that, this paper proposes how to evaluate the risk factors and risk events, and how to select prevention action for managing risk factors effectively. For this process, this paper uses well-known quality tools such as House of Quality (HOQ) and Failure Mode and Effects Criticality Analysis (FMECA) methods. Results: There is an inherent need for the development of robust risk management framework in order for product development projects to be successful. The identification and quantification of risk factors, risk events, and prevention actions can have significant effects on the success of a product development projects. Project managers can implement the proposed model to improve project success. Conclusion: The findings showed that this method would be effective for project managements in dealing with risk management issues in product development projects. This method presented would be an one of good guidelines for practitioners in the industry.

건설사업 위험분류체계의 재정립을 통한 위험인지 체크리스트 개발 (A Development of the Risk Identification Checklist through the Re-establishment of Risk Breakdown Structure of Construction Project)

  • 주해금;김선규
    • 한국건설관리학회논문집
    • /
    • 제4권2호
    • /
    • pp.109-117
    • /
    • 2003
  • 건설사업은 그 규모와 복잡성으로 인하여 다른 산업에 비해 위험에 대한 노출수위가 크고, 그 형태도 다양하다. 따라서, 건설사업에서 위험을 인지하고 대응하는 일련의 위험관리 과정은 정확하고 체계적으로 수행되어야 한다. 위험관리 과정에서 위험인지 단계는 다양한 위험요인의 인지와 그 위험의 성격을 규정하는 단계이고. 이러한 위험인지 단계에서 위험분류체계는 사업에 내재된 다양한 위험을 인지하게 해주는 유용한 도구이다. 본 연구에서는 기존 위험분류체계의 문제점을 개선하고 재정립함으로서, 실질적인 건설사업에서 위험인지 도구로서 활용될 수 있는 사업단계별, 계약주체별 체크리스트를 제안하였다.

건설공사의 리스크인자 분석 및 경감에 관한 연구 (Analysis and Reduction for Risk factors of Construction Projects)

  • 정병화;정영식
    • 한국건설관리학회논문집
    • /
    • 제2권4호
    • /
    • pp.62-68
    • /
    • 2001
  • 최근 국내 건설업계는 건설경기 침체, 해외건설 수주부진, 치 열한 경쟁 등 어려운 상황에 직면한 실정인데 이에 본 연구에서는 효과적인 리스크관리 방법을 제시하고자 한다. 효과적인 리스크관리와 성공적인 사업관리를 수행하기 위하여 국내 상위 건설회사를 모집단으로 한 설문조사를 실시하여 건설관리에 의한 리스크인자와 리스크관리에 의한 리스크인자를 검정하여 리스크인자를 분석하고 미리 예측하여 원인을 분석하여 대응$\cdot$제어하면 리스크인자를 경감하게 되어 공사비, 공기, 품질을 향상시켜 양질의 건설공사를 수행 할 수 있게 하는 방안을 제시하는데 그 목적이 있다.

  • PDF

위험분석 모델을 적용한 정량적인 소프트웨어 위험관리 방법론에 관한 연구 (A Study on Quantitative Software Risk Management Methodology applied Risk Analysis Model)

  • 엄정호;이동영;정태명
    • 디지털산업정보학회논문지
    • /
    • 제5권2호
    • /
    • pp.133-140
    • /
    • 2009
  • In the paper, we proposed the systematical and quantitative software risk management methodology based on risk analysis model. A software risk management consists of the basic risk management method(BRIMM) and the detailed risk management method(DRIMM). BRIMM is applied to unimportant phases or the phase which also the risk factor does not heavily influence to project. DRIMM is used from the phase which influences highly in project success or the phase where the risk factor is many. Fulfilling risk management combined two methods, we can reduce project's budget, term and resource's usage, and prevent risk with the optimum measures obtained by the exact risk analysis.

프로젝트 품질경영시스템 지침 (Guidelines for Project Quality Management System)

  • 최성운
    • 대한안전경영과학회:학술대회논문집
    • /
    • 대한안전경영과학회 2006년도 춘계공동학술대회
    • /
    • pp.525-544
    • /
    • 2006
  • This paper is to introduce guidelines for project quality management system. International standards such as ISO 10006, IEC 62198, ISO/IEC TR 16326 and ISO 15188 are considered. This study is to discuss guidelines for quality management in projects, and application guidelines for project risk management, and guide for the application of ISO/IEC 12207 to software project management, and project management guidelines for terminology standardization.

  • PDF

PROGRAMMATIC AND PROJECT-LEVEL RISKS: ESTABLISHING A RISK MANAGEMENT PROCESS FOR MIDDLE EAST PLANT PROJECTS

  • G. Edward Gibson Jr.;John Walewski;SangBum Kim;Clayton Ingam;Hamid Hajian
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1000-1014
    • /
    • 2009
  • Research sponsored by the Korean Government investigated the establishment of a risk management process by Korean contractors involved with plant projects in the Middle East. This research effort builds upon the work completed by the Construction Industry Institute (CII), called the International Project Risk Assessment (IPRA) tool and method, and also explored how CII's Project Definition Rating Index (PDRI) could be incorporated to improve project planning by addressing risks and scope development issues. Specific findings and recommendations were developed including the creation of the Contractor Critical Areas of Concern (CCAC) risk screening tool for Korean contractors pursuing Middle East oil and gas projects.