• Title/Summary/Keyword: project risk management

Search Result 778, Processing Time 0.026 seconds

Analysis of the Project Risk Factors Using Modified Kano Model (수정된 Kano 모델을 이용한 프로젝트의 위험요인 연구)

  • Jang, Deok-Jae;Song, HaeGeun;Park, Young T.
    • Journal of Korean Society for Quality Management
    • /
    • v.41 no.2
    • /
    • pp.221-232
    • /
    • 2013
  • Purpose: This paper examines risk factors which affect project success, and proposes a method utilizing the average potential satisfaction index(API) to evaluate how much the satisfaction level of the personnel involved in the project can change by reducing the risk. Methods: The current study derives 11 risk factors affecting project success from literature review and conducts survey of 253 subjects who have project work experience. A modified Kano's questionnaire using 5-point Likert-scale is applied to investigate the amount of satisfaction or dissatisfaction when the risk factors are reducted or not, respectively. Results: The respondents consider that the risk factors which include the three elements of project management(schedule, quality, cost) is more important than other risk factors related to the project environment, and technology and profitability. Conclusion: The average potential satisfaction index proposed in this study can measure the perception on the risk factors of the personnel involved in the project, since it has a strong correlation with the perceived importance by the respondents in this study.

A Case Study of Risk Management factors in Web Design Project (웹 디자인 프로젝트에서 리스크 매니지먼트 요인에 대한 사례 연구)

  • 박은영
    • Archives of design research
    • /
    • v.16 no.4
    • /
    • pp.69-78
    • /
    • 2003
  • Risk Management is one of the most important factors in web design project management. The purpose of risk management is to identify reasons of risk to avoid risky situation and successfully achieve final goal of the project. This paper first describes concept of the web design project management and its processes. Secondly this study presents planning principles for systematic risk management process. Also it suggests a model of risk management. Finally this paper demonstrates utility of the risk management model through case studies based on the suggested risk management model.

  • PDF

Trend Analysis for Risk Management of Construction Project using P.M.I. Techniques (P.M.I. 기법을 이용한 국내 건설업체 리스크관리 실태 분석)

  • 정병화;정영식
    • Journal of the Korean Society of Safety
    • /
    • v.16 no.4
    • /
    • pp.115-122
    • /
    • 2001
  • Recently construction enterprises involves more occurred with increase of size and complxity of construction works. Risk management is one of the key project management process. Numerous tools are available to support the various phases of the risk management process. We present the results of a study designed to identify the tools that are most widely used and those that are associated with successful project management in general, and in effective project risk management in particular. The study is based on a questionnaire administered to a sample of project managers from construction enterprises. The response data was analyzed in order to find which tools are mon likely to be used in the those organizations that report better project management performance and in those that value the contribution of risk management processes.

  • PDF

An Empirical Study on Risk Factors in Information System Project Management (정보시스템 프로젝트의 위험요인에 관한 실증 연구)

  • Cho, Suk-Jin;Lee, Seog-Jun;Hahm, Yu-Keun
    • Asia pacific journal of information systems
    • /
    • v.16 no.3
    • /
    • pp.143-158
    • /
    • 2006
  • Identifying risk factors in software risk management is imperative for project managers. The purpose of this paper is to provide software project risk factors validated by statistical analysis, and thus to help project managers alleviating the possibility of software project failure. Factor analysis with data collected from 264 Korean project managers and consultants identified 12 categories and 46 risk factors. T-test results showed that project managers and participants had statistically different perception on 3 risk factors among those 46 risk factors. We concluded by discussing implications of our findings and future research directions.

A Model of Risk Management Plan in the Development Phase of Urban Regeneration Project

  • Kim, Seon-Gyoo
    • Architectural research
    • /
    • v.11 no.2
    • /
    • pp.35-42
    • /
    • 2009
  • Recently, intensive urban redevelopment concentrated on new towns has reduced the number of settled population, and weakened various functions such as commercial, culture, education and welfare in old towns, and made the stagnation and declination of the entire or some parts of old towns. Urban regeneration project means renewing cities' functions in terms of physical, environmental, social, cultural, industrial and economic aspects or revitalizing the existing functions through improvement project in the entire or part of a city, which is now drawing keen attention from the public. However, urban regeneration project is huge in scale, needs long construction period and various complex facilities, and also characterized by complicated relations with many stakeholders. Due to such characteristics, there are many risks in the project. Therefore, systematic risk management is absolutely necessary to efficiently manage various risk factors inherent in urban regeneration project. The purpose of this research proposes a basic model to establish risk management plan and work process in order to help project participants to perform risk management more systematically and rationally in the development phase of urban regeneration project.

Scenario Planning and Risk Failure Mode Effect and Analysis (RFMEA) based Management

  • Paul, Virendra Kumar;Basu, Chaitali
    • Journal of Construction Engineering and Project Management
    • /
    • v.6 no.2
    • /
    • pp.24-29
    • /
    • 2016
  • This paper elaborates the significance of scenario planning in risk management, and presents an integrated approach which takes into account the 'Risk Events' derived from scenario planning for risk prioritisation. This research integrates scenario planning with Risk Failure Mode and Effect Analysis (RFMEA) through examples from construction litigations of project schedule and cost overrun cases as a simplified approach to project risk management. The proposed methodology incorporates scenarios developed from realistic events of dispute and arbitration cases from construction projects, and thereby increasing potential to foresee risks and their effects well in advance. The results from this methodology shall be validated against outcome of survey study conducted by KPMG-PMI (2013) on project schedule and cost overruns that was based on Ministry of Statistics and Programme Implementation (MoSPI) Project Monitoring data for 2012-13.

Project Risk Management & Observational Method for soft ground improvement (연약지반을 대상으로 한 프로젝트 리스크와 현장계측의 과제와 대책)

  • Imanishi, Hajime
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2006.10a
    • /
    • pp.509-514
    • /
    • 2006
  • Considering the risk management, there are many examples and various studies for the corporation risk. However, I have never seen the project risk management that applied a construction site for practical approach. Therefore, I have developed a chart (I-Chart) for the project risk management, and also built a model (I-Chart scenario analysis) that I could use. I applied this model to container yard reclaimed land in harbor construction with approaching of geotechnical engineering.

  • PDF

A Study on SI Project Environment and Risk Management Practice (국내 SI 프로젝트 수행환경 진단 및 위험관리 방안 연구)

  • 김현수
    • Korean Management Science Review
    • /
    • v.16 no.1
    • /
    • pp.203-218
    • /
    • 1999
  • This study presents a diagnosis of SI project environment and risk management practices in Korea. In particular, the stability of project environment, required skills for project managers, risk factors and usefulness of risk management activities are surveyed and analysed. Factor analysis and correlation analysis are performed to investigate any significant relationships among various risk management factors. The results indicate that SI project environment is not stable in Korea, and risk management can be a primary project management tool to deal with the situation. The results also that there's little significant difference in understanding not only between the clients and developers, but alto between the experienced managers and less experienced managers.

  • PDF

Individual behavioral competences for construction project risk manager

  • Lee, Kwang-Pyo;Lee, Hyun-Soo;Park, Moonseo;Kwon, Byung-ki;Hyun, Hosang
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.183-187
    • /
    • 2015
  • The Risk Management (RM) is applied for managing uncertainty of project. In this circumstance, the competences of RM have a direct effect on the performance of its application. Especially, as the RM, one of the project management areas, is a peopleoriented management field, the individual behavioral competences are significant for a risk manager. Therefore, this paper describes the development of individual behavioral competences for construction project risk manager. For this, the research classifies the individual behavioral competences of RM. And, the Exploratory Factor Analysis (EFA) are applied to verify a validity of the competences. Likewise, a reliability analysis using Cronbach's alpha values is performed to test internal consistency. Based on the results, the authors carry out the Focus Group Interview (FGI) on expert panels of construction RM to confirm the hierarchical model of the individual behavioral competences. It is concluded that the proposed hierarchical model of individual behavioral competences helps construction companies to diagnose the competences of their project risk manager for progressing.

  • PDF

A Delphi Study on Software Project Risks (소프트웨어 개발 프로젝트의 위험요인 도출에 대한 델파이 연구)

  • Chung Kyung-Soo;Kang Myeong-Hui;Kim Yong
    • The Journal of Information Systems
    • /
    • v.13 no.1
    • /
    • pp.1-20
    • /
    • 2004
  • Most of the software development projects bear risks that need analysis and management. Risk management plays a critical role for the success of software project management. In this study, we have used delphi method to delineate critical risk factors. The study pulls out 20 project risk factors from 21 project managers. It is certainly clear that certain features are more risky than others. Our study shows that unrealistic cost estimation and changes in scope and objective are more risky than other features.

  • PDF