• Title/Summary/Keyword: project process

Search Result 4,143, Processing Time 0.034 seconds

Development of a Project Management System for the Turnkey-based Plant Project (중공업 일괄수주공사를 위한 프로젝트 관리 시스템 개발 사례)

  • Ko, Chang-Seong;Rho, Jae-Jeung;Hyun, Jae-Myung;Kim, Myoung-Gwan
    • IE interfaces
    • /
    • v.11 no.3
    • /
    • pp.167-180
    • /
    • 1998
  • This study is concerned with the development of a project management system for the turnkey-based plant project, which will help the site manager to plan, control, and report the project progress. This system has been developed as one of the modules of the integrated information system for the H Heavy Industry Co. and is composed of five subsystems; project information system, drawing-material management system, process management system, project progress report system. A/S management system. it also integrates commercial project management package in order to schedule the project activities and report the project progress to the owner. The main purpose of the system is to provide project information, including drawing, material, and progress, to the site manger in the real time and to accumulate site know-how for the turnkey-based plant project.

  • PDF

Factors That Affect Project Time and Cost Performance during Highway Construction Using Incentive/Disincentive Provisions

  • Pyeon, Jae-Ho;Park, Moonseo;Jung, Sangsun;Park, Taeho
    • Land and Housing Review
    • /
    • v.11 no.4
    • /
    • pp.115-124
    • /
    • 2020
  • Incentive/Disincentive (I/D) contract is designed for minimizing any disruption of traffic flow in road construction projects. I/D contracting projects have been evaluated with regard to time and cost performance in various states, more than 35 states. However, construction project managers and planners have little understanding of the project factors that affect the project time and cost performance of highway construction projects using I/D regulations. Therefore, the purpose of this research is to find factors that affect I/D project success or failure to improve the decision-making process for the implementation of I/D projects. In order to achieve the objectives of this research, the researchers collected I/D road construction project data from FDOT and performed evaluation for each collected project. Then, project data analysis to identify key factors that affect I/D project performance was performed. In conclusion, five significant factors for project time performance and six significant factors for project cost perfornace were identified and summarized.

A Scheme of the defence project analysis and evaluation using a systems engineering process (시스템 엔지니어링 프로세스를 적용한 사전/사후분석 방안)

  • Min, Seong-Gi;Gwon, Yong-Su;Lee, Im-Su
    • 시스템엔지니어링워크숍
    • /
    • s.1
    • /
    • pp.32-39
    • /
    • 2003
  • This work describes a study of analysis and evaluation activities applied systems engineering approach. It is presented technique of derivation and management requirement. A scheme of the defence project analysis and evaluation using a systems engineering process is described.

  • PDF

Standardized Micromachining Project(SMP) (표준마이크로머시닝 프로젝트)

  • Cho, Dong-Il
    • Proceedings of the KIEE Conference
    • /
    • 1996.07c
    • /
    • pp.1991-1993
    • /
    • 1996
  • This paper describes a standardized micromachinung project (SMP) performed at Seoul National University (SNU). The SNU SMP uses a 3-mask, 2-polysilicon surface micromaching process. The entire process is performed at SNU Inter-University Semiconductor Research Institute(ISRC). In this first SNU SMP attemp, 16 $1cm^2$ cells containing different designs were fabricated.

  • PDF

Key Success Factors of Collaborative R&D Projects in the Small and Medium-Sized Companies in the Korean Electronic Parts Industry (우리나라 전자부품 중소기업에 있어서 공동기술개발의 성패요인)

  • 이광회;김영배
    • Proceedings of the Technology Innovation Conference
    • /
    • 1997.12a
    • /
    • pp.104-130
    • /
    • 1997
  • This study empirically examined different patterns of collaborative R&D project with their key success factors(KSFs), using data from 80 projects in the Korean electronic parts industry The patterns in this study were categorized into 4 types by two criteria : product types(off-the-shelf/unique) and project initiator (focal/partner). The bivariate relationships revealed that project characteristics (technological complexity, demand certainty), partner characteristics(the number of partners, precious experience), process characteristics (participation in the project formulation, specificity of the collaboration process and outcomes) appear to be different among four types of collaboration. Furthermore, this study found that each type of collaborative R&D projects has different KSFs for their commercial success. The KSFs of type 1 (off-the-shelf product and focal organization initiation), for instance, include the strategic importance of the project, the problem solving performance of the focal organization while those of type 4(unique product and partner initiation) are technological complexity, demand certainty, reliability of partner relationship, specificity of the goals, specificity of the process and outcomes, information sharing. Finally, based on this empirical results, managerial, policy, and theoretical implications of the study were discussed.

  • PDF

A Looping Population Learning Algorithm for the Makespan/Resource Trade-offs Project Scheduling

  • Fang, Ying-Chieh;Chyu, Chiuh-Cheng
    • Industrial Engineering and Management Systems
    • /
    • v.8 no.3
    • /
    • pp.171-180
    • /
    • 2009
  • Population learning algorithm (PLA) is a population-based method that was inspired by the similarities to the phenomenon of social education process in which a diminishing number of individuals enter an increasing number of learning stages. The study aims to develop a framework that repeatedly applying the PLA to solve the discrete resource constrained project scheduling problem with two objectives: minimizing project makespan and renewable resource availability, which are two most common concerns of management when a project is being executed. The PLA looping framework will provide a number of near Pareto optimal schedules for the management to make a choice. Different improvement schemes and learning procedures are applied at different stages of the process. The process gradually becomes more and more sophisticated and time consuming as there are less and less individuals to be taught. An experiment with ProGen generated instances was conducted, and the results demonstrated that the looping framework using PLA outperforms those using genetic local search, particle swarm optimization with local search, scatter search, as well as biased sampling multi-pass algorithm, in terms of several performance measures of proximity. However, the diversity using spread metric does not reveal any significant difference between these five looping algorithms.

3D Earthwork BIM Design Process for a Road Project

  • Raza, Hassnain;Park, Sang-Il;Lee, Seung Soo;Tanoli, Waqas Arshad;Seo, Jongwon
    • Journal of KIBIM
    • /
    • v.7 no.2
    • /
    • pp.8-15
    • /
    • 2017
  • Building Information modeling is playing an important role in transforming the construction industry. It helped the industry with better visualization, minimum design errors, and excellent planning of the construction activities. Time and cost saving can be effectively achieved by using BIM for any construction project. It improves information exchange between all the project stakeholders. However, the development of earthwork 3D BIM is still underway and has not been fully implemented yet. This paper presents the study of a complete process for Earthwork BIM design using Autodesk Civil 3D. A real site road construction project is used as a case study to explain the process of earthwork modeling, starting from laser scanning to 3D model. Quantity take off calculation is very important part of any road construction project so during this study earthwork volume from two 3D earthwork model is calculated. The results obtained through this study will be the basis for future work which has been concluded in this paper.

Supporting Systematic Software Test Process in R&D Project with Behavioral Models

  • Choi, Hyorin;Lee, Jung-Won;Lee, Byungjeong
    • Journal of Internet Computing and Services
    • /
    • v.19 no.2
    • /
    • pp.43-48
    • /
    • 2018
  • Various artifacts that are produced as software R&D project progresses contain research plan, research report, software requirements and design descriptions, etc. When conducting a software R&D project, it is necessary to confirm that the developed system has implemented its research requirements well. However, various research results make it difficult to design appropriate tests. So, there is a practical need for us to comprehensively handle the planning, execution, and reporting of software test for finding and verifying information related to the research. In this paper, we propose a useful method for software test process in R&D project which supports model based software testing. The proposed method supports automation of test design and generation of test data by explicitly separating each step of System Under Test (SUT). The method utilizes the various models representing the control flow of the function to extract the information necessary for testing the system. And it supports a systematic testing process based on TMMi and ISO 29119. Finally, we show the validity of the method by implementing a prototype with basic functionality to generate test data from software behavioral models.

Design and Implementation of Team Project Assessment System using auto generated web survey document (자동 생성 웹 설문지를 이용한 팀 프로젝트 평가 시스템의 설계 및 구현)

  • Lee, Mi-Young;Min, Su-Hong;Cho, Dong-Sub
    • The Journal of Korean Association of Computer Education
    • /
    • v.6 no.4
    • /
    • pp.195-207
    • /
    • 2003
  • The Seventh Curriculum uses not only individual assessment but also team assessment method that organizes and solves assignments by team unit. It also helps students to learn cooperation and responsibility and share the ideas and process of the team project with other students through class presentation. It is also cooperative learning which is performed by several students together. Therefore, the assessment of team project is required to synthetically assess the performance process not the itself. This thesis will examine the actual problems about team project assessment and analyze related literatures. Then, this study designs and implements a practical system which alleviates the burden of teachers in charge of a team project assessment and improves reliability and validity in assessing team projects through multilateral assessment aiming at process as well as result objectives.

  • PDF