• 제목/요약/키워드: project participants

검색결과 681건 처리시간 0.024초

임상간호현장에서의 실행연구 여정 (A Journey to Action Research in a Clinical Nursing Context)

  • 장금성;김희영;김은아;김윤민;문정은;박현영;송미옥;백명
    • 간호행정학회지
    • /
    • 제19권1호
    • /
    • pp.95-107
    • /
    • 2013
  • Purpose: The purpose of this study was to examine the effectiveness of Action Research (AR) approach in nursing. Methods: Participants were 64 perioperative nurses recruited from C hospital in Gwangju, Korea. The nurses were engaged in the project through 2 cycles of planning, acting, observing, and reflecting. A mixed-methods design was used to examine changes in participants and their knowledge management practice. Quantitative data were analyzed using SPSS 20.0 program and qualitative reflection data underwent content analysis. Results: During the project, participants developed standardized pre-operative checklists and opened an Internet Cafe to better manage their perioperative nursing information. At the end of the project, there was a significant increase in nurses' knowledge management (p=.015) and the rate of surgical material prescription errors decreased from 8.0% to 2.9%. Core AR project team members' teamwork skills and organizational commitment increased significantly (p=.040, p=.301, respectively). The main themes that emerged from the qualitative data were learning how to solve problems in practice, facilitating team activities through motivation, barriers of large participation, and rewarded efforts and inflated expectations. Conclusion: The AR project contributed to empowering participants to solve local problems. AR is a useful methodology to promote changes in practices and research participants.

ERP 구현의 참여자 역할과 시스템 성과 간의 관계에 있어 변화관리 활동의 매개 효과에 관한 연구 (Mediating Effect of Change Management Activity on the Relationship between the Role of Participants of ERP Implementation and System Performance)

  • 장활식;오정은;최유정;한정희
    • 한국정보시스템학회지:정보시스템연구
    • /
    • 제16권4호
    • /
    • pp.75-106
    • /
    • 2007
  • The purpose of this research is to identify a mediating effect of change management activity(CMA) on the relationships between the role of participants of ERP implementation and system performance. In this paper the role of participants are composed of top's management, user's participation, project manager's skill. Also this research organized ERP system performance into the three dimensions(adaptation to the end-user's ERP system, system usage, individual's performance). The major results of this research can be summarized as follow; project manager's role, top management's involvement, and users' participation in ERP project directly affect CMA of system implementation process and have influence system performance through CMA too. CMA also has a positive effect on a series of system performance, that is, adaptation to the end-user's ERP system, system usage, and individual's performance. In conclusion, the role of participants have an considerable influence upon system performance through CMA. This research makes certain that a mediating effect of CMA between the role of participants and system performance exists. Therefore, the companies implementing ERP must consider CMA.

  • PDF

THE IDENTIFICATION OF MALAYSIAN CONTRACTOR SATISFACTION DIMENSIONS: A STRATEGY FOR CONTINUOUS IMPROVEMENT

  • Md Asrul Nasid Masrom;Martin Skitmore;Adrian Bridge
    • 국제학술발표논문집
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.335-339
    • /
    • 2011
  • The unique characteristics of the construction industry - such as the fragmentation of its processes, varied scope of works and diversity of its participants - are contributory factors to poor project performance. Several issues are unresolved due to the lack of a comprehensive technique to measure project outcomes including: inefficient decision making, insufficient communication, uncertain site conditions, a continuously changing environment, inharmonious working relationships, mismatched objectives within the project team and a blame culture. One approach to overcoming these problems appears to be to measure performance by gauging contractor satisfaction (Co-S) levels, but this has not been widely investigated as yet. Additionally, the key Co-S dimensions at the project level are still not fully identified. This paper concerns a study of satisfaction dimensions, primarily by a postal questionnaire survey of construction contractors registered by the Malaysian Construction Industry Development Board (CIDB). Eight satisfaction dimensions are identified that are significantly and substantially relate to these contractors - comprising: project cost performance, schedule performance, product performance, design satisfaction, site safety, project profitability, business performance and relationships between participants. -Each of these dimensions is accorded different priority levels of satisfaction by different contractors. The output of this study will be useful in raising the awareness and understanding of project teams regarding contractors' needs, mutual objectives and open communication to help to deliver a successful project.

  • PDF

환경영향평가서의 육상물상 부분의 작성실태및 개선방향에 관한 연구 (A Study on the Improvement and Actual Conditions of Terrestrial Vegetation Part in Environmental Impact Statement)

  • 강철기
    • 한국조경학회지
    • /
    • 제25권3호
    • /
    • pp.35-46
    • /
    • 1997
  • The objective of this study is to investigate actual conditions of terrestrial vegetation part in Environmental impact statement, and to prepare a proposal for the efficiency of Environmental Impact Assessment. 13 E.I.S.s made out during 1996.6-1997.5. have been chosen and analysed with respect to scope of survey, item of survey, method of survey, and result of survey. Actual conditioins of terrestrial vegetation part in E.I.S. are summarized as follows : 1. The mean number of total participants in drawing up E.I.S. is 26.0 persons, that of participants in terrestrial vegetation part is 2.3 persons. 2. In case of planar project, the mean of scope of survey is 16.1 times as large as area of project . In case of linear project, the scope of survey has been determined arbitrarily. 3. The most part of survey has been dependent on literature, and field survey has been practically neglected. 4. Results of survey mostly missed the point that E.I.A. pursues. And proposals are as follows : 1. Participants in terrestrial vegetation part in drawing up E.I.S should be increased. 2. It is necessary to subdivide scope of survey in view of difference between planar project and linear project. 3. As for item and method of survey, field survey should be specially reinforced. 4. Several sheets of map as results of survey should be included in E.I.S. The vegetation map, the D.G.N. map, and the planting map should be included and drawn by smaller scale as possible.

  • PDF

건설사업관리의 BIM(Building Information Modeling) 적용 가능성에 관한 연구 (A Study on The Possibility of BIM(Building Information Modeling) Application of Construction Management)

  • 심진규;이혜인;김재준
    • 한국디지털건축인테리어학회논문집
    • /
    • 제10권2호
    • /
    • pp.49-60
    • /
    • 2010
  • The production process of construction industry is different from thing of the general manufacturing, likewise various participants make temporary teamwork for success of the project through sharing of information. But the each role of participants is individually changed to step in construction process stage and moreover it has complicated, entangled interests. The Construction Management was inducted for the effective management and operation of construction project. The Key of the Construction Management success depends on the cooperative relationship relation to major participants. The domestic construction system is difficult with many trial and errors for the frequent plan change. As the building are more bigger and complicated, Building Information Modeling is demanded design and maintenance. This evaluation was done by the trust on the system as well as Construction Management. And then it applies the BIM it analyzes the example of construcrion project.

A Basic Study on the Introduction of Professional Indemnity Insurance for Construction Project Managers

  • Cho, Young-Jun
    • 한국건축시공학회지
    • /
    • 제13권2호
    • /
    • pp.102-111
    • /
    • 2013
  • During the administration of a construction project, various types of participants are engaged in the project. From the design phase to the maintenance phase, these participants may confront many risks. To avoid these risks, participants should utilize an insurance company or a bond company. The types of risks and liability that a construction manager may face are listed in the construction law or contract. But there are some arguments related to risk transferring and the content of risks. For this reason, construction managers must carefully consider any possible risks in the contract and the construction law. Therefore, for construction managers to deal with risks appropriately, the introduction of a legal requirement to carry professional liability insurance, a defined compensation range for damages, a method of guarantee in the event of defects, a defined compensation claim period for damage, and a method of damage claim were suggested in this study.

대기행렬 모형을 활용한 시공단계 BIM 코디네이터 업무 성과 분석 (Empirical Evaluation of BIM Coordinator Performance using Queuing Model in Construction Phase)

  • 함남혁;여옥경;지규현
    • 한국BIM학회 논문집
    • /
    • 제8권3호
    • /
    • pp.31-42
    • /
    • 2018
  • This study focuses on the BIM request for information(RFI) processing performance and quantitatively analyzes the performance of the BIM coordinator and the loss due to the waiting of the project participants. For these purposes, a method to quantitatively evaluate the performance of the BIM coordinator was proposed using a queueing model. For the verification, two projects in which BIM was applied in the construction phase were selected, and the BIM RFI data were collected through the analysis of the BIM monthly report and BIM coordinator work log of each project. In addition, the BIM input personnel, labor cost, and productivity data were collected through interviews with the experts of the case projects. The analysis of the BIM RFI processing performance of the BIM coordinator using the queueing model exhibited on a probabilistic basis that the waiting status of the project participants could vary depending on the preliminary BIM application to the design verification as well as the input number and level of the BIM coordinator personnel. In addition, the loss cost due to the waiting of the project participants was analyzed using the number of BIM RFIs waiting to be processed in the queueing system. Finally, the economic feasibility analysis for the optimal BIM coordinator input was performed considering the loss cost. The results of this study can be used to make decisions about the optimal BIM coordinator input and can provide grounds for the BIM return on investment (ROI) analysis considering the waiting cost of the project participants.

건축 리모델링 사업단계별 참여주체자의 업무와 역할정립 (The Establishment of the Task and Role of the Participants at Building Remodeling Phases)

  • 정덕우;박찬식
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2002년도 학술대회지
    • /
    • pp.331-334
    • /
    • 2002
  • 건축 리모델링 사업에 참여하고 있는 주체자의 업무와 역할은 기존의 신축공사와 달리 명확히 구분되어야 한다. 그러나 리모델링 공사비의 규모나 시장 참여자들 대부분이 충분한 경험과 기술을 보유하고 있지 못한 실정이며, 진행과정에서 참여주체자간의 업무와 역할이 중복되거나 간섭이 발생하고 있다. 따라서 체계적이고 성공적인 리모델링 사업을 수행하기 위한 방안이 필요하며, 이를 위해 리모델링 사업단계별 참여주체자의 업무와 역할을 정립하고자 한다.

  • PDF

요구조건 기준의 개발 수행을 위한 우주발사체 개발사업의 실제적인 요구조건-검증 관리 체계 (Practical Requirements and Verification Management for Requirements-based Development Process in Space Launch Vehicle Development Project)

  • 조동현;장준혁;유일상
    • 시스템엔지니어링학술지
    • /
    • 제19권1호
    • /
    • pp.56-63
    • /
    • 2023
  • For the success of system development, it is necessary to systematically manage the requirements that are the basis of system development and its verification results. In order to follow the principles of SE(Systems Engineering)-based V&V(Verification&Validation) process, requirements can be managed by securing the requirements and their establishments, design compliances, and verification compliances according to the system development lifecycle. Especially, in a large-complex system research and development project, such as a space launch vehicle development project, many participants establish, verify, and validate numerous requirements together during the project. Therefore, logical and systematic requirements management, including guarantee of data integrity, change history, and traceability, is very important for multiple participants to utilize numerous requirements together without errors. This paper introduces the practical requirements and verification management for the requirements-based development process in the space launch vehicle development project.

Metrics for Measuring Innovation in Integrated Project Delivery

  • 이태식;란잔스와인;박경순;김영현
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2006년도 정기학술발표대회 논문집
    • /
    • pp.322-325
    • /
    • 2006
  • The research project evaluates different infrastructure project delivery methods used internationally. The goal is to define the main benefits, deficiencies, and requirements of the project delivery systems for both the short term and long term perspectives. Also, the research attempts to determine alternatives to modify and to promote change in the current infrastructure project delivery methods in order to make the processes more efficient with value added benefits to all participants.

  • PDF