도시정비형 재개발사업에서 공공참여에 의한 관리처분 및 원가정산 혼용 시행방식에 관한 고찰 (A Study on the Mixed Implementation Method of Management Disposition and Cost Settlement by Public Participation in Urban Renewal Type Redevelopment Projects)

  • 문명렬;전상훈
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2021년도 가을 학술논문 발표대회
    • /
    • pp.254-255
    • /
    • 2021
  • The urban renewal type redevelopment project is a project to improve the urban environment for the recovery of urban functions and revitalization of commercial districts in commercial and industrial areas. Urban regeneration projects are not progressing smoothly. The urban renewal type is not so for landowners, who require a high level of professional knowledge and experience to carry out smooth projects. In addition, the core part of business conflicts can be seen as the problem of management and disposal methods. Therefore, as landowners, etc. become the actual subjects, the public will take charge of project execution, but all development gains and losses will be attributed to the owner of the land, etc.

  • PDF

건설공사보험 확대 당위성 및 예산소요 분석 연구 (An Analysis on Expanding Construction Insurance and Estimating Necessary Budget)

  • 김명수
    • 한국건설관리학회논문집
    • /
    • 제15권5호
    • /
    • pp.94-102
    • /
    • 2014
  • 본 연구에서는 건설공사보험 확대의 당위성을 분석하고 확대를 위한 예산소요를 추정하였다. 건설공사 손해배상보험은 국가계약법, 지방계약법 등 관련법규에서 의무화하고 있으며, 건설공사의 수행 중에 발생하는 예기치 못한 사고로 인한 사업목적물이나 재산상 손해의 배상을 위하여 가입하고 있다. 현재 200억 이상 PQ공사 및 대형공사만을 의무가입대상으로 공공발주자가 보험료를 지원하고 있다. 의무가입 대상 공사의 경우 발주자가 보험료를 부담하지만, 200억 미만 공공공사의 경우 업체가 자기부담으로 손해를 배상해야 하는 형평성문제가 발생한다. 비의무대상 공사라도 많은 경우가 자기비용으로 보험을 가입하고 있으며, 민간 공사의 경우도 건설공사보험 가입이 많은 것으로 나타난다. 건설공사보험을 가입하면 건설업체의 부족한 사고관리능력을 보험회사로부터 지원받아 안정적인 조업이 가능하게 된다. 따라서 중소업체에 대한 보호와 중소규모 공사의 조업안정성을 위해 200억 이상 공공공사에만 의무화 되어 있는 현재 규제를 개선하여 중소 규모 공사까지 가입 범위를 확대시킬 필요가 있다. 비의무가입 공사의 최근 3년 평균 비중은 46%이며, 보험사의 보험료율에 근거한 원가반영율은 0.2%로 산출된다. 여기에 공종별 위험도를 감안하면 비의무가입 공사의 원가반영율은 0.13%로 추정된다. 이에 따라 향후 200억 이하 공사에 대한 보험 가입을 위해 공공공사 발주가 35조원 규모라면 209억원, 40조원이라면 239억원의 예산이 추가로 필요할 것으로 추정된다.

A SYSTMATIC APPROACH FOR APPORTIONING CONCURRENT DELAY

  • Nie-Jia Yau;Chia-Chi Chang
    • 국제학술발표논문집
    • /
    • The 2th International Conference on Construction Engineering and Project Management
    • /
    • pp.520-529
    • /
    • 2007
  • Apportioning responsibilities of concurrent delay to the owner and the contractor is a difficult task, due to the sophisticate nature both in the schedule and in the factors that cause the delay. This research attempts to develop a simplified yet systematic approach that can be used for a fair apportionment of concurrent delay. A concurrent delay is defined herein as when the contractor and the owner have both caused independent critical path delays during the same approximate time period. Incorporating the concepts of windows analysis and critical path method (CPM), the developed approach has three "windowing of delay" steps to quickly apportion the delay in each of these windows, and a fourth step to sum up those apportioned delays to obtain each party's final responsibilities. This developed approach is found to be simple and effective at this stage; it will be tested against real cases in the near future.

  • PDF

A STUDY ON CONSTRUCTION CONTRACTS AND PAYMENT METHODS IN CM AT RISK SYSTEM -APPROACH WITH ESTABLISHING CONTEXT OF GMP-CM SYSTEM -

  • JeaSauk Lee;JaeYoul Chun
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.1002-1006
    • /
    • 2005
  • When we compare CM system with Design Bid Build system, we can see two striking features in CM system. First, CMr participates in construction team along with Owner, Designer and Constructor. The newcomer can change boundaries of function and responsibility. Second, Compatibility through each phase and Objectivity of decision-making become more important, because relation among stakeholders changes from a rectilinear to a network. However, it is not clear how the risk of completion is reasonably treated. So we have to think about the relations between Owner and CMr, CMr and Specialist Contractor from a point of trade risk. This paper covers them.

  • PDF

BIM Application Process for Facility Condition Assessment Documentation Work

  • Yoo, Seung Eun;Yu, Jung Ho
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.268-270
    • /
    • 2015
  • Overseas countries' government and facility management industries make efforts to ensure precise and fluent data from building information modeling (BIM). In facility management, a large amount of data and information are necessary to continue the process activities. Facility condition assessment, which is performed to make budget plan for the maintenance and operation requires the related facilities' documentation and information. However, it depends on the owner and the user of the facility to provide accurate and complete information to consultant. The problems as follows: (1) owner and user should provide documents and information, and (2) the consultant cannot verify the provided information. To solve these problems, we suggest a methodology to produce the information for FCA through BIM. First, all of the essential documentation and assessment elements are listed. Next, the documents and elements are separated out, whether they are able to be extracted from BIM or not. Then, the list indicates only the data that is linked with BIM. The suggestion is expected to provide the required information through the connection to BIM with accuracy and completeness and to present another BIM application use for facility management.

  • PDF

건설사업관리 정보시스템(PMIS)구축에 관한 연구 (The Study of Project Management Information System Establishment for Construction)

  • 윤재호;문영일
    • 한국건설관리학회논문집
    • /
    • 제3권4호
    • /
    • pp.132-138
    • /
    • 2002
  • 최근 건설시장의 선진화를 목적으로, 주어진 공기 내 완공 및 비용절감, 품질향상 등을 위하여 PMIS(사업관리정보시스템)의 활용이 심도 있게 요구되고 있다. 하지만, 현재 각 프로젝트에서 개발된 PMIS는 개발기간의 한시성으로 대개 공사현황위주로 되어 있고, 프로젝트 수행자들의 PMIS사용 역시 형식적으로 운용됨으로써, 발주자, 사업관리자, 시공자간의 효율적인 의사소통에 한계가 있는 실정이다. 이에 현재까지 개발된 사업관리정보시스템을 검토하고, 그동안 현업에서 개발한 경험을 토대로 효율적 인 PMIS의 구축방향을 제시코자 한다.

CER 가격 불확실성을 고려한 A/R CDM 사업의 실물옵션 분석: 포스코 A/R CDM 사업 분석 (Real Option Analysis on Posco A/R CDM Project under CER Price Uncertainty)

  • 홍원경;박호정
    • 자원ㆍ환경경제연구
    • /
    • 제20권3호
    • /
    • pp.459-487
    • /
    • 2011
  • 포스트 교토체제에서는 A/R CDM 등 산림 분야의 중요성이 증대할 것으로 전망된다. A/R CDM에 대한 정확한 경제성 평가는 투자의사결정에 유용한 정보를 제공하여 투자 활성화로 이어질 수 있다. 본 연구에서는 전통적 경제성 평가 방법이 간과한 의사결정자의 의사결정권의 가치 내지 기다림의 가치를 반영한 실물옵션 방법에 의해 모형을 구축하고 실제 A/R CDM 사례를 적용하여 실증분석을 하였다. 그 결과 적용 사례의 경우 최적투자분기점이 추정된 l-CER의 가격보다 낮게 나타남으로써 적절한 투자의사결정이 이루어졌음을 알 수 있었다. 그러나 할인율의 수준과 적용 범위에 따라 최적투자분기점과 투자의사결정이 크게 영향을 받는 것으로 나타났다.

  • PDF

건설사업관리자의 안전역량 평가체계 개발에 대한 연구 (A Study on the Development of Evaluation System on the Construction Project Manager's Safety Capability)

  • 신동혁;성주현;육인수;이명구;오태근
    • 한국안전학회지
    • /
    • 제32권4호
    • /
    • pp.40-45
    • /
    • 2017
  • Among various methods to build the construction safety, the consecutive improvement by the measuring and evaluating safety management capabilities for the construction participants such as an owner, a contractor, and a supervisor (construction project manager) can be the effective one. Thus, an effective evaluation and grading criteria to provide performance index for the implementation of safety management activities should be necessary. In this regards, the purpose of this study is to verify the adequacy by offering a competency evaluation system for the supervisor's safety capability and by applying the system to some construction sites. The proposed evaluation system was developed on the basis of the principles of safety management & accident prevention, basic elements of safety and health management system, and safety evaluation cases at home and abroad. The trial evaluation showed that the safety management of the construction site is mainly carried out by the contractor and the supervisor's awareness for the safety management is low on the whole. Especially, it is urgent to improve the support system from the supervisor headquarter and to place the dedicated safety management person in the field.

건설공사 사후평가 수행결과 활용도 개선 방안 (Improvement scheme of utilization of the results of the post-construction evaluation system)

  • 이두헌;박재우
    • 한국건설관리학회논문집
    • /
    • 제14권6호
    • /
    • pp.78-89
    • /
    • 2013
  • 건설공사 사후평가 제도는 공공건설사업 수행결과를 반영하여 향후 유사한 공공건설사업의 계획 수립 시 활용되어져야 하나, 현행 제도는 당초 기획 계획 당시에 추정한 수요, B/C비율, 공사비, 공사기간 등 예측치와 건설공사 완공후 일정기간(3년 내지 5년) 경과후에 측정한 실제 결과치를 단순히 비교하여 제시하는 수준에 그치고 있다. 또한 대부분 공공발주기관에서는 수동적인 사후평가 업무수행에 그치고 있어 제대로 환류가 이루어지않고 있다. 이에 본 연구에서는 공공발주기관을 대상으로 설문조사를 실시하여 건설공사 사후평가 제도의 수행현황을 파악하였으며, 국내 사후평가 제도와 유사한 미국과 일본의 건설사업 평가체계를 벤치마킹하였다. 또한, 건설공사 사후평가 제도와 관련된 국토부 실무담당자와의 수차례 업무회의를 실시하여 사후평가 수행의 적시성 확보 및 활용성 강화방안을 제시하였다. 이와 같이 건설공사 사후평가 제도 개선을 통해 건설사업 수행과정에서의 목표 및 성과에 대한 확인 점검 분석 체계를 내실화하고, 건설공사 특성별로 평가내용 및 방법을 차등화함으로써 발주청의 사후평가 수행에 대한 실천력이 제고될 것으로 기대된다.

현장여건상이로 인한 클레임의 예방에 관한 연구 -공공부문의 설계$\cdot$시공일괄공사를 중심으로- (A Study on the Prevention for Differing Site Conditions Claims - Focused on Design-Build Project in Public Sector -)

  • 정명우;이화영;서용칠;현창택
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2001년도 학술대회지
    • /
    • pp.46-53
    • /
    • 2001
  • 정부의 지속적인 사회간접시설의 건설로 많은 대형공공공사가 발주되고 있으며, 이에 따라 많은 건설 클레임이 발생되고 있으며, 그 .중에서도 현장여건상이 클레임은 발생가능성이 높은 부분이다. 특히 현장여건상이 클레임은 여타 클레임과 달리 공사 초기에 발생하여 여타의 클레임보다 큰 손실을 초래할 수 있으므로 이에 대한 예방방안의 필요성이 증대되고 있다. 본 연구는 국내의 대형공공공사 중 일괄공사계약으로 발주된 공사에서 발생한 현장여건상이 클레임의 원인을 분석하고, 향후 이러한 클레임을 예방할 수 있는 예방방안을 제시하였다. 본 연구에서 제시하고 있는 예방방안으로는 첫째 수급자의 입찰관행 개선, 둘째 수급자의 현장조사 책임한계 정립, 셋째 발주자의 면책조항 재검토 그리고 마지막으로 계약금액 조정의 유연성을 확보하기 위한 방안 등을 제시하고 있다. 또한 상기의 예방방안에 대한 단·장기적 대안도 제시했다. 이러한 예방방안들은 발주자와 수급자 사이에서 현장여건상이 클레임의 해결에 사용될 수 있을 것으로 판단된다.

  • PDF