• Title/Summary/Keyword: project manager

Search Result 375, Processing Time 0.031 seconds

A Comparative Analysis of Status on the Selection and Evaluation of Field Manager in Apartment and Office Building Project (공동주택과 오피스 건설현장의 조직원선정 및 평가실태 비교분석)

  • Lee Jung-Yong;Kim Byeong-Lae;Son Chang-Baek
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.290-293
    • /
    • 2003
  • The field organization management in construction industry is very important factor improvement and cost reduction. But, until now, evaluation methods on the existing field organization did not make ready and endeavor of organization betterment was insufficient in construction industry. The purpose of this study to provide basic data for reasonable selection and evaluation of the field manager through analyzing operation status of the existing field organization in apartment and office building project by interview and questionnaire on the 22 construction companies. This study presented optimal proposal on the selection and evalution of field manager for productivity improvement and cost reduction by means of efficient construction progress in apartment and dffice building project.

  • PDF

Analyzing the impact of Consultant and Project Manager Competencies on Business Performance Mediated by Consulting Performance (컨설턴트 역량과 프로젝트 관리자 역량이 컨설팅 성과를 매개로 경영성과 간의 구조적 관계분석)

  • Rok Lee
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.46 no.3
    • /
    • pp.231-240
    • /
    • 2023
  • This empirical analysis investigates the impact of consultant competency and project manager (PM) competency on business performance. Two hundred and twenty four chief executive officers and executive members at small and medium sized firms in the manufacturing sector were surveyed, yielding several outcomes. First, consultant competency positively affects consulting performance. Second, consultant competency positively affects business performance. Third, PM competency does not have a significant influence on consulting performance. Fourth, PM competency does not have a significant impact on business performance. Fifth, consulting performance does not have a significant effect on business performance. Finally, regarding the mediation effect of consulting performance on the influence of consultant competency and PM competency on business performance, consulting performance had no significant impact. Thus, expertise and insight are crucial for a consulting business to enable the growth of professional consultants. Furthermore, this study is expected to enhance the consulting performance of small and medium sized manufacturing firms by providing useful data to consultants and project managers when carrying out consulting projects.

A decision support system (DSS) for construction risk efficiency in Taiwan

  • Tsai, Tsung-Chieh;Li, Hsiang-Wen
    • Smart Structures and Systems
    • /
    • v.21 no.2
    • /
    • pp.249-255
    • /
    • 2018
  • Many studies in risk management have been focused on management process, contract relation, and risk analysis in the past decade, but very few studies have addressed project risks from the perspective of risk efficiency. This study started with using Fault Tree Analysis to develop a framework for the decision-making support system of risk management from the perspective of risk efficiency, in order for the support system to find risk strategies of optimal combination for the project manager by the trade-off between project risk and cost of project strategies. Comprehensive and realistic risk strategies must strive for optimal decisions that minimize project risks and risk strategies cost while addressing important data such as risk causes, risk probability, risk impact and risk strategies cost. The risk management in the construction phase of building projects in Taiwan upon important data has been analyzed, that provided the data for support system to include 247 risk causes. Then, 17 risk causes were extracted to demonstrates the decision-making support system of risk management from the perspective of risk efficiency in building project of Taiwan which could reach better combination type of risk strategies for the project manager by the trade-off between risk cost and project risk.

A Case Study of Complex-Cultural-Space Development by Importing the PM (PM이 적용된 복합문화공간 개발사례 연구)

  • Ma, Eun-Joo;Park, Boo-Mee
    • Archives of design research
    • /
    • v.19 no.5 s.67
    • /
    • pp.281-292
    • /
    • 2006
  • Modern cities' paradigm is rapidly changing to evolve into multi-functional spaces including living space, culture, welfare and environment. Therefore, upon these changing needs, the cultural images and the quality control became major issues in this area. This thesis will examine cultural contents development, a successful case-study, and the analysis of complex space development plan. Thereby each development case in cultural contents area will be extracted and it will seek to find out how they could make a complex cultural space. Moreover, the role and boundary of each Project Management case and Project Manager will be analyzed. The analysis showcases the importance of comprehensive and systematic management system. As a result, along with the recognition of the strong ground for Project Management and Project Manager, comprehensive planand the most effective management system for various complex cultural space development plans would be PM application which is expected to be new alternatives to improve complex space development quality.

  • PDF

A Study on Relative Importance of Project team members Competencies Using AHP (AHP를 활용한 프로젝트 팀 구성원의 개인역량 상대적 중요도 연구)

  • Kim, Yeoungdae;Lee, Jinah;Oh, Minjeong
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.43 no.3
    • /
    • pp.216-227
    • /
    • 2020
  • The purpose of this paper is to identify a relative importance and priority of the factors of Competencies of project team member. It aims to present the differential competency factors from a differentiated perspective by applying the Leadership Development Questionnaire, which is the competency dimension required for manager, to team member. (1) Background: The diverse needs of customers and companies, and the uncertainty, complexity, ambiguity, and volatility of the environment surrounding the company in the era of the Fourth Industrial Revolution threaten the survival of company. In this respect, companies should implement the project management approach and strive to increase the capabilities of each team member. (2) Methods: AHP method was used to prioritize which factors were considered more importance level and the gap of relative importance level between project manager group and team members group. (3) Results: In the analysis of the relative importance of the upper class, weights were derived in the order of managerial competence, intellectual competence, and emotional competence. The sub-factor that respondents prioritize was communication as the 1st priority, and it was analyzed in the order of strategic perspective, achieving, critical analysis and judgement, and vision and imagination. There were some differences in the ranking of the relative importance of achieving and vision and imagination attributes between the PM group and TM group, it was analyzed that there was no significant difference overall. (4) Implications: The results of this study confirmed the recognition that team members are required to have the same competencies as the project manager. And based on the priorities of the competencies required of team members, companies are expected to cultivate professional and competent team members, and expand the roles and authority of team members so that they can actively carry out projects.

Project Experience and its Impact on Project Performance (프로젝트 경험이 프로젝트 성과에 미치는 영향)

  • Yu, Gun Jea
    • The Journal of the Korea Contents Association
    • /
    • v.14 no.8
    • /
    • pp.365-373
    • /
    • 2014
  • The assignment of exploration on individuals provides challenging work environments, while it generates high levels of complexity. On the other hand, the assignment of exploitation on individuals offers less challenging work environments, while it makes low levels of complexity. Give the characteristics of exploration and exploitation, I argue that the assignments of both exploration and exploitation create the favorable work environments to individuals. Developed hypotheses were tested using a logit regression from a sample of 168 project managers in a R&D center. I found that a manager who experienced exploitation project(s) is positively related to higher performance in exploitation project(s). In addition, a manager who experienced both exploitation and exploration projects are found to be positively associated with higher project performance.

A Systems Engineering Case Study to Improve Defence R&D Program Effectiveness (국방 R&D사업 시스템엔지니어링 적용사례 및 발전방안 연구 - 저고도레이더 업체주관 연구개발사업 사례 중심으로 -)

  • Park, Kyeong-Il;Pyun, Wan-Joo;Park, Young-Won
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.4 no.2
    • /
    • pp.35-43
    • /
    • 2008
  • Application of system engineering should be realized on necessary condition being to propel National Defense R&D Program. But, these necessity is yet not realized easily to many project managers of Defense Acquisition Program Administration(DAPA). As one person of DAPA project manager, system engineering hard to approaches easily by the word itself. There are a lot of difficult sections where should apply how. This paper established DAPA Project Manager and Acquisition Point of Contact of demand Military by main customer (reader), and wished to make understood more easily and approach system engineering application to these. Also, this paper studied project management example that scientific project management techniques of Earned Value Management(EVM) and Cost As an Independent Variable(CAIV) etc. is taken abuzz in DAPA inside by Project management technique that become reform, arc Integrated in system engineering.

  • PDF

A Study on Optimal Duration Estimation for Construction Activity

  • Cho, Bit Na;Kim, Young Hwan;Kim, Min Seo;Jeong, Tae Woon;Kim, Chang Hak;Kang, Leen Seok
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.612-613
    • /
    • 2015
  • As a construction project is recently becoming large-scaled and complex, construction process plan and management for successful performance of a construction project has become more important. Especially a reasonable estimation plan of activity duration is required because the activity duration is directly related to the determination of the entire project duration and budget. However, the activity duration is used to estimate by the experience of a construction manager and past construction records. Furthermore, the prediction of activity duration is more difficult because there is some uncertainty caused by various influencing factors in a construction project. This study suggests an estimation model of construction activity duration using neural network theory for a more systematic and objective estimation of each activity duration. Because suggested model estimates the activity duration by a reasonable schedule plan, it is expected to reduce the error between planning duration and actual duration in a construction project. And it can be a more systematic estimation method of activity duration comparing to the estimation method by experience of project manager.

  • PDF

The Career Orientations of R&D Professionals : An Empirical Analysis (R&D 전문가들의 경력 지향성에 관한 실증적 연구)

  • 차종석;김영배
    • Journal of Technology Innovation
    • /
    • v.6 no.1
    • /
    • pp.215-249
    • /
    • 1998
  • This study empirically examines the relationship between the career orientations of R&D professionals and their demographic characteristics (age, tenure, and education level), affiliated organizations (public and private organizations), reward systems. It further explores the contingent effects of the career orientation fit between leader and members on their performance. The results reveal that : 1) five different career orientations (technical, manager, project, technical transfer, and entrepreneur) are empirically distinguished, 2) technical orientation of R&D professionals is higher in public in private sectors, 3) technical, project, and manager orientation are positively associated with the education level, while technical transfer and entrepreneur orientation are negatively associated with the education level, 4) manager and technical transfer orientation is positively related with age and tenure, 5) the career orientation fit between leader and member is closely related with job satisfaction and organization commitment, and partially related with technical performance, 6) R&D professionals with different types of career orientation exhibit different preference to various rewards. Based on these findings, this study suggests several practical implications for the design of career ladder, mentoring, and reward systems of R&D professionals.

  • PDF

A study on the Ethics Characteristics according to Service and Practice of Construction Manager (건설사업관리자의 업무수행에 따른 윤리 특성 고찰)

  • Lee, Sang-Beom
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.1
    • /
    • pp.97-106
    • /
    • 2011
  • Construction Management is the overall management of the project as construction manager and the owner are united together. Construction manager's role is to conduct the overall or partial construction administration in the 'design, bid, build' process, in the owner's interests with maintaining technical neutrality. Construction manager is becoming one of new professionals in the building process and the contract defines their roles and the range of services, so high level of ethnics are required. This study suggests the legal status of the construction manager and the ethnic standards and the ethnic's characteristics. In conclusion, firstly, the legal characteristics of the administration of construction management are the delegations contract, the responsibility of negligence and the duty of due diligence, abided by the contract that ties between the owner and the construction manger. Secondly, the administerial characteristics of the construction management are the role of mediator, the service of professional technology, accountability to the owner and publicness. Thirdly, due to these characteristics, as a professional, the standard of ethnic assessment for the construction project manager are intention, act and result, so with the relation to that, morality, deontology and consequentialism have been suggested in this study.