This study conducted an evaluation of the streetscape improvement project of the Gwangbok Street through analysis of visual and perceptual characteristics by comparing selected pictures of streetscape before and after the project. This work has conducted an analysis of the environmental factors which influence subjects' satisfaction degrees including physical street equipments and street view factors which are main contents of this project. Using a satisfaction analysis and factor analysis, each factor's significance was verified quantitatively. As a result of the analysis, physical components of the streetscape were classified into 4 types according to project's effectiveness and improvement priorities. These 4 types include (1) Components for maintenance because of higher satisfaction and higher importance, (2) Components for improvement because of lower satisfaction and higher importance, (3) Components for good business fruits because of higher satisfaction and lower importance, and (4) Components for unnecessity because of lower satisfaction and lower importance.
This study investigated the needs and effectiveness of the application of Computer-Aided Systems Engineering Tool in order to enhance the chance of success of the large and complex system development projects like City Train System. Furthermore, it was shown that the merits of Systems Engineering and Project Management must be complementary to each other in their interaction in a project. Especially, for the project plans must be executed based on the fully understood system being developed, the technical and management data of the system development need be integrated and be able to support exact and rapid decision making of project planning. As an alternative solution approach, a model for development knowledge capture integrating both technical and management data of system development was proposed using Computer Aided Systems Engineering tool-Cradle.
Journal of the Korea Institute of Military Science and Technology
/
v.23
no.3
/
pp.286-293
/
2020
Since Dr. Lipke announces earned schedule management(ESM) in 2002, it has been used in project management to make up for the insufficient schedule management function of earned value management technique. However, it is difficult to accurately forecast the schedule of delayed defense research and development(R&D) projects with the ESM technique. Therefore, this paper proposes a new schedule forecasting method considering the progress of delayed work in ESM technique. This concept can also be adopted to the traditional project progress management (PPM) technique. We verify the effectiveness of the proposed concept through several defense R&D projects and prove that it is possible to supplement the schedule forecasting of the ESM and PPM technique.
A new teaching-learning method is needed to improve creative problem-solving ability of the gifted students at mathematics. In response to this demand, I applied mentor-project studying to the mathematically gifted class students of Chungnam Science High School. The purpose of this monograph is to analyze in what situations they demonstrated mathematical creativity and whether the interactions among the gifted in the process of studying were of great help toward improving creativity. The effectiveness of mentor-project studying was especially verified by the analysis of creative problem-solving test results.
International conference on construction engineering and project management
/
2005.10a
/
pp.515-519
/
2005
Most information within a construction project roots in drawings and contract documents. Although several methodologies, such as A/E/C and 4D, have employed such a peculiarity to integrate project information, they failed to integrate information in terms of efficiency and consistency. In this research, a MD (Multi-Dimensional) CAD model is developed to improve the process of integrating information for construction projects. This research describes the processes of creating MD CAD objects and embedding information required throughout the project life cycle within MD CAD building components. In addition, a case study is presented to show the efficiency and effectiveness of using MDIIS (Multi-Dimensional Information Integration System) to integrate information for construction projects.
Willar, Debby;Rumbayan, Rilya;Manueke, Selfy;Mandagi, Robert
International conference on construction engineering and project management
/
2015.10a
/
pp.481-485
/
2015
Indonesian construction companies are currently facing high competition both among themselves and with global construction companies. In order to address this issue, the Government of Indonesia has enacted specific regulations and policies relating to the development and implementation of quality management systems (QMSs) ISO 9001 based in construction, acknowledging that the consistency of construction project quality requires a formal quality system as a guarantee to raise quality standards at all project stages. The research has been undertaken to examine the effectiveness of the regulations and policies against several key performance indicators (KPIs) of the ISO 9001 Indonesian construction companies. A comprehensive review of the relevant regulations and policies together with interviews with the Government and National Construction Services Development Board recommend possible additional guidelines and supporting quality system, which intends to measure contractors' project output against defined standards as well as to assess their performance among other similar service providers. The outcomes of the research contribute to the development of the Indonesian own construction industry quality measurement and assessment system.
International conference on construction engineering and project management
/
2013.01a
/
pp.158-162
/
2013
Building envelope systems with growing complexity in geometry and performance criteria demand adapted workflow processes toward the efficient integration of their design and fabrication. To facilitate integration of the workflow process, this study analyzes relationships among teams who share digital models and exchange information that help project participants identify areas of improvement in task allocation and exchanges among various actors, systems, and activities. In addition, major gaps identified in knowledge transfer, project tracking, and design integration during the performance evaluation stages, emphasize the need for a more comprehensive approach to integrating the design, the fabrication, and the construction parameters of building envelope systems. To evaluate the effectiveness of streamlining interactions of design parameters with fabrication constraints and constructability assessments, this paper examines a mechanical design approach as it applies to various project scenarios to develop a mechanical solution for streamlining building envelope design and construction workflow.
With regard to industrial accidents, large corporations and public institutions are continuously reducing disasters through systematic management. However, industrial accidents continue to increase in small-scale workplaces. In order to ensure the safety of workers, the government supports the purchasing of industrial accident prevention equitments through financial support projects for small business. However, despite the financial support, the effectiveness of the project is hardly verified. In this study, we analyze the policy effectiveness of the financial support program for industrial accident prevention in a small-scale workplace using the difference-in-difference method. To achieve research purposes, we used the data on the occurrence of industrial accidents, the status of workplaces by year and the data on the status of workplace benefiting from financial support program for the past 10 years. This study is significant in that it analyzed the net effect of financial support programs for disaster reduction in the small business site.
Objective : The purpose of this study is to confirm whether the effectiveness of the program is sustainable 9 months after project completion for the children and adolescents participating in a childcare and rehabilitation support project. Methods : This study was carried out in three phases: pre-(2016.5~6), post-(2016.10~12) and follow-up evaluation phases (2017.9) of 120 children and adolescents who participated in a treatment and rehabilitation of children project in 2016. The analysis was conducted using a repeated mesures ANOVA to identify changes in problem behaviors. Results : The problem behavior of preschoolers in middle and high schools decreased after the post-evaluation compared to the pre-evaluation, and the effect of treatment was maintained afterward. Elementary school students displayed fewer problem behaviors after the post-evaluation than in the pre-evaluation, and follow-up more. Conclusions : This study confirms that the effects of therapy are maintained for a long period of time. Furthermore, it has been confirmed that therapeutic intervention is effective for children and adolescents in foster care.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.