• Title/Summary/Keyword: project cost

Search Result 2,429, Processing Time 0.036 seconds

Analysis of the major subcontract competence factors of overseas plant construction (해외 플랜트 공사의 주요 하도급 역량 요인 도출 및 분석)

  • Kim, Hwa-Rang;Sohn, Tae-Hong;Jang, Hyoun-Seung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.5
    • /
    • pp.84-91
    • /
    • 2013
  • In 2012, Korean overseas construction market has achieved 64.9 billion dollars of contract order and its amount has increased since the mid 2000's. However, importance of qualitative growth based on profitability as well as quantitative growth is also emphasized. This study analyzed overseas plant project's subcontract process management which is closely related to cost management as one of the qualitative growth methods. In order to select major subcontract processes, extensive literature review and focus group interview(FGI) were implemented and then professionals with years of experience in the overseas plant projects were participated in the questionnaire survey. The collected data were analyzed by Benefit-Structure Analysis(BSA) model. The findings of this study include: (1) the seven and six subcontract processes are positioned in the area of importance control factor and in the area of maintenance/control factor, respectively; (2) administration capability attainment is needed for the six subcontract processes in the area of importance control factor and sustainable management system is required for the processes in the maintenance/control factor area. The further research will identify key subcontract processes to be managed for overseas plant projects by Korean EPC contractors based on the findings of this research.

Private Procurement for Constructions and Operation of Buman Road in Daegu (도시 인프라 시설을 위한 민자 유치 -대구시 범안로 민자도로의 운영 실태와 대책-)

  • Choi, Byung-Doo
    • Journal of the Korean association of regional geographers
    • /
    • v.13 no.6
    • /
    • pp.674-694
    • /
    • 2007
  • Recently private procurement projects for urban infrastructure have been emphasized and introduced by government(both central and local) as an important method to supplement public budget shortage and to improve creativity and efficiency in its construction and operation, and hence to promote regional development. But these private procurement projects seem to be implemented under the neoliberal condition of urban policy for private capital to extend its sphere of investment and to ensure its opportunity of profit. Such private procurement projects for urban infrastructure have been legislated and widely applied since 1994 in S. Korea, but in recent years they have triggered out a variety of serious problems. In results of this study on the private procurement for construction and operation of Burnan Road in Daegu, it can be pointed out, it has led serious problems such as overestimation of traffic volume in plan, over-appropriation of construction cost and appurtenant business, irYational operation and account of the operating firm, problem in refinancing and change in contents of practical agreement, and over-compensation of minimum operation revenue. Some measures that can be considered as alternatives to resolve those problems and to operate more rationally the Buman Road include those of increasing traffic revenues, of reducing supports of public financing, and withdrawal of (part or whole of) operational right from the private firm.

  • PDF

Forward/Reverse Engineering Approaches of Java Source Code using JML (JML을 이용한 Java 원시 코드의 역공학/순공학적 접근)

  • 장근실;유철중;장옥배
    • Journal of KIISE:Software and Applications
    • /
    • v.30 no.1_2
    • /
    • pp.19-30
    • /
    • 2003
  • Based upon XML, a standard document format on the web, there have been many active studies on e-Commerce, wireless communication, multimedia technology and so forth. JML is an XML application suitable for understanding and reusing the source code written using JAVA for various purposes. And it is a DTD which can effectively express various information related to hierarchical class structures, class/method relationships and so on. This paper describes a tool which generates JML document by extracting a comment information from Java source code and information helpful for reusing and understanding by JML in terms of the reverse engineering and a tool which generates a skeleton code of Java application program from the document information included in the automatically or manually generated JML document in terms of the forward engineering. By using the result of this study, the information useful and necessary for understanding, analyzing or maintaining the source code can be easily acquired and the document of XML format makes it easy for developers and team members to share and to modify the information among them. And also, the Java skeleton coed generated form JML documents is a reliable robust code, which helps for developing a complete source code and reduces the cost and time of a project.

A Guideline for Construction of Building Disaster Information System (건축물방제시스템 구축${\cdot}$운영방안 연구)

  • 김윤종;송철호;원종석
    • Spatial Information Research
    • /
    • v.5 no.2
    • /
    • pp.133-146
    • /
    • 1997
  • While occasional disasters have occurred recently in urban facilities such as bridges, buildings, subways, roads and others, the systematic safety management of urban facilities is greatly needed to prevent the disaster or to minimize the damages. This study proposes the way of setting-up and managing an building disaster information system so that this experience can be applied to other urban facilities to minimize trials and errors. With such a purpose, this study presents a building safety management information system and utilizes it for the building disasten information system. This study includes research agendas as follows : building maintenance and management infonnation system, setting-up and utilization the building safety management infonnation system, building disaster infonnation system using GIS. The results suggest that the building safety management infonnation system which can be related to the urban disaster infonnation system should be constructed in advance in order to utilize the building disaster infonnation system, and that, under this condition, it proved to be easily connected to the related database, especially GIS. And, to utilize such an infonnation system, the application programs such as safety evaluation program, cost estimation program and documents management program should be readily available. In addition, other functional programs related with maintenance and management should be designed and established. The schemes or devices for practical usage should be supplemented through a standardization and a pilot project in central government or Seoul Metropolitan Government level in order to set up and utilize the building safety management infonnation system, and the related laws or regulations should be prepared or amended to support the system.

  • PDF

Estimation of Post Evaluation Index of Natural Disaster Prevention Projects using Structure Equation Modeling (구조방정식모델을 이용한 자연재해예방사업의 사후 평가 지수 산정)

  • Heo, Bo Young;Song, Jai Woo;Yoon, Sei Eui;Lee, Seung Oh
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.34 no.6
    • /
    • pp.1807-1814
    • /
    • 2014
  • Natural disaster has been hard to prevent the occurrence of itself, thus in order to reduce the economic damages and loss casualties, it is important to be prepared in cases that the disasters should occur in advance. Interest of the related project to prevent various natural disasters has been grown along with an investment in Korea. Along with this movement, when investments related to natural disaster prevention projects were built on, the post evaluation that can verify the ripple effects of those investments on the community should be emerging as an essential task. For evaluating the effects of public investment projects such as natural disaster prevention projects in this study, the related researches would continue through qualitative analyses, for example, cost-benefit analysis. Even the qualitative analysis alone cannot fully explain the effects of those projects, the diverse methods of analyzing and evaluating those effects might not have been presented in those fields. For the post evaluation of natural disaster prevention projects through the qualitative analysis, this study derived subjects that had effects on the post evaluation of natural disaster prevention projects. Also, employing the structural equation modeling (SEM), the causation between post evaluation subjects and the effects of projects were quantitatively analyzed, and the weighting factors of evaluation items were calculated respectively. Based on these results, post evaluation index formula was proposed for the natural disaster prevention projects in Korea.

Comparison of Pipeline and Clamshell Capping Technologies for the Remediation of Contaminated Marine Sediments (해양 오염퇴적물 정화를 위한 원통관과 클램쉘을 이용한 피복 기술의 비교)

  • Kang, Ku;Hong, Seong-Gu;Kim, Young-Kee;Park, Seong-Jik
    • Journal of Navigation and Port Research
    • /
    • v.41 no.4
    • /
    • pp.195-206
    • /
    • 2017
  • In situ capping technology for marine sediment pollution control has never been applied in South Korea. In this study a pilot project for the capping was carried out in Busan N Harbor. Pipeline and clamshell capping technologies were implemented for the pollution control. Changes of capping shapes, sediment contamination, and the time and costs required for the two constructions were compared. Both the pipeline and clamshell technologies were found to satisfy the target thickness of 50 cm on average. However, the pipeline method did not operate sensitively in terms of change of the sea floor topography, resulting in an uneven shape and a thickness. Organic carbon and ignition loss quite decreased after the pipeline or the clamshell capping while pH showed no significant change. Organic and residual fraction of Cd, Ni, and Zn in the sediments appeared to decrease after all cappings. The pipeline method took a construction time four times as much as the clamshell method. The clamshell method was demonstrated to reduce the construction cost by about 40% compared with the pipeline method. However, a monitoring for all the parameters needs to be conducted at least two years in order to better evaluate an efficiency of the pollution control by these capping constructions.

A Study on Selection Process of Open Source Software (오픈소스 소프트웨어의 선정 절차에 관한 연구)

  • Lee, Young-Min;Rhew, Sung-Yul;Kim, Jong-Bae
    • The KIPS Transactions:PartD
    • /
    • v.15D no.6
    • /
    • pp.793-802
    • /
    • 2008
  • The development methods which utilize OSSs have been tried as new alternative to solve limits of the previous software developments such as the quality of software, and time and cost of developments. Especially, small and medium companies are suffering from difficulty in applying large-scale development methodology whenever they develop softwares. Therefore, in the current situation that demand for small-scale development methodology is increasing, the methods of utilizing OSSs can become an efficient way to save costs and reduce a development period. Accordingly, analysis of open-source is no fixed procedure or method to utilize open-source for software developments in the field. In this thesis, to solve such problems, we propose the procedures and methods for identifying and selecting suitable open-source, and effective methods for improvement and integration through least modification on the basis of synthesis of existing researches and experiences in development projects. For selection of OSSs, we did identify correct requirements for the software to be developed, investigate the open-source just matching with such requirements, draw a candidate index, establish assessment criteria, and the consequently present a method to select OSSs. And, we deduced the validity and improvement of each detailed activity from practical application to an actual project and assessment.

Analysis of Management Efficiency for Abalone Seed Producer based on DEA Approach (DEA를 이용한 전복종자 생산업체의 경영효율성 분석)

  • Oh, Ye-Jin;Lee, Nam-Su;Kim, Dae-Young
    • The Journal of Fisheries Business Administration
    • /
    • v.51 no.1
    • /
    • pp.37-52
    • /
    • 2020
  • The production of abalone seed has grown and been specialized since the 2000s with the growth of the abalone farming industry. Despite the increase in the production of abalone seeds, the sales volume of abalone seeds remained flat and competition among producers increased. This paper will analyze the management efficiency of abalone seed production fishery to diagnose the management status and improve the abalone seed production efficiency. In addition, this study is the result of the basic research on the abalone seed industry and it is meaningful to prepare a platform for further research since the management status survey and the management efficiency survey of abalone seed production fishery have not been conducted until now. The data on the farmed fish prices of abalone seeds were collected from surveys of sample fish as part of the fish seed observation project conducted by the Fisheries Outlook Center (FOC) of Korea Maritime and Fisheries Development Institute (KMI). Management efficiency analysis utilizes DEA (Data Envelopment Analysis) model. The DEA model was analyzed by classifying into CCR (Super-CCR), BCC, and SBM (Super-SBM) models according to the assumptions taking into account the characteristics of the industry. The slack considered in the SBM model was judged as possible decreases in input variables and increase in output variables. The average efficiency from the CCR model was analyzed to be 69%. The BCC model was classified into input and output orientations, and the average efficiency was 79% and 75%, respectively. There were seven production fisheries with an SE value of 1 or more, which remained unchanged in terms of size and could be benchmarked. The average efficiency of the SBM model was 59% for CRS and 66% for VRS. Under the VRS assumptions, the variable increase/decrease efficiency analysis shows that labor costs can be reduced by 37.3%, facility capacity by 18.8%, and operating costs by 8.5%. In order to improve management efficiency, Wando needs to reduce labor and management costs. In Jindo region, sales increase as well as labor cost reduction is urgent. In other regions, reduced facilities and increased sales are recommended.

An External Costs Assessment of the Impacts on Human Health from Nuclear Power Plants in Korea (국내원전운전(國內原電運轉)에 따른 보건영향(保健影響)의 외부비용평가(外部費用評價))

  • Kim, Kyoung-Pyo;Kang, Hee-Jung
    • Journal of Radiation Protection and Research
    • /
    • v.33 no.2
    • /
    • pp.67-76
    • /
    • 2008
  • As the first comprehensive attempt at a national implementation, this study aims at assessing the external costs of major electricity generation technologies in Korea, particularly an evaluation of the impacts on human health resulting from exposures to atmospheric radiological emissions from nuclear power plants, and a monetary quantification of their damages. The methodology used for the assessment of the externalities of the selected fuel cycles has been developed by the International Atomic Energy Agency (IAEA), namely the SimPacts Model Package. The model is internationally recognized as a tool which can be applied to a wide range of fuels, different technologies and locations, for an externalities study. In this study, the relevant emissions are quantified first and then their impacts on human health are evaluated and compared. The study focused on all the nuclear power plants for the last 6 years ($2001{\sim}2006$) in Korea. With respect to nuclear power, the impact analysis only focuses on a power generation, however the front- and back-end nuclear fuel cycles are not included, namely uranium mining, conversion, enrichment, reprocessing, conditioning, etc., because these facilities are not present in Korea. The analysis results show that nuclear power in general, generates low external costs. The highest damage costs from the nuclear power plants among the 4 sites in Korea were estimated to be 3.9 mills/MWh, which is about 1/20th of the result for a similar case study conducted in the U.K., implemented through the ExternE project. This difference is largely due to the number of radionuclides included in the study and the amount of released radioactive emissions based on up-to-date information in Korea. In this study, the sensitivities of the major factors for nuclear power plants were also calculated. The analysis indicates that there was around a ${\pm}3%$ damage costs variation to a ${\pm}15%$ change of the reference population density and a ${\pm}1%$ damage cost variation to a $1{\sim}30$ meters change of the effective release height, respectively. These sensitive calculations show that there is only a minor difference when the reference costs are compared.

The Projection of Medical Care Expenditure in View of Population Age Change (인구구조의 변화에 따른 의료비 추계)

  • Yu, Seung-Hum;Jung, Sang-Hyuk;Nam, Jeung-Mo;Oh, Hyohn-Joo
    • Journal of Preventive Medicine and Public Health
    • /
    • v.25 no.3 s.39
    • /
    • pp.303-311
    • /
    • 1992
  • It is very important to estimate the future medical care expenditure, because medical care expenditure escalation is a big problem not only in the health industry but also in the Korean economy today. This study was designed to project the medical care expenditure in view of population age change. The data of this study were the population projection data based on National Census Data(1990) of the National Statistical Office and the Statistical Reports of the Korea Medical Insurance Corporation. The future medical care expenditure was eatimated by the regression model and the optional simulation model. The significant results are as follows : 1. The future medical care expenditure will be 3,963 billion Won in the year 2000, 4,483 billion Won in 2010, and 4,826 billion Won in 2020, based on the 1990 market price considering only the population age change. 2. The proportion of the total medical care expenditure in the elderly over 65 will be 10.4% in 2000, 13.5% in 2010, and 16.9% in 2020. 3. The future medical care expenditure will be 4,306 billion Won in the year 2000, 5,101 billion Won in 2010, and 5,699 billion Won in 2020 based on the 1990 market price considering the age structure change and the change of the case-cost estimated by the regression model. 4. When we consider the age-structure change and inflation compared with the preceding year, the future medical care expenditurein 2020 will be 21 trillion Won based on a 5% inflation rate, 42 trillion Won based on a 7.5% inflation rate, and 84 trillion Won based on a 10% inflation rate. Consideration of the aged(65 years old and over) will be essential to understand the acute increase of medical care expenditure due to changes in age structure of the population. Therefore, alternative policies and programs for the caring of the aged should be further studied.

  • PDF