• Title/Summary/Keyword: project activities

Search Result 1,445, Processing Time 0.026 seconds

Resource-constrained Scheduling at Different Project Sizes

  • Lazari, Vasiliki;Chassiakos, Athanasios;Karatzas, Stylianos
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.196-203
    • /
    • 2022
  • The resource constrained scheduling problem (RCSP) constitutes one of the most challenging problems in Project Management, as it combines multiple parameters, contradicting objectives (project completion within certain deadlines, resource allocation within resource availability margins and with reduced fluctuations), strict constraints (precedence constraints between activities), while its complexity grows with the increase in the number of activities being executed. Due to the large solution space size, this work investigates the application of Genetic Algorithms to approximate the optimal resource alolocation and obtain optimal trade-offs between different project goals. This analysis uses the cost of exceeding the daily resource availability, the cost from the day-by-day resource movement in and out of the site and the cost for using resources day-by-day, to form the objective cost function. The model is applied in different case studies: 1 project consisting of 10 activities, 4 repetitive projects consisting of 40 activities in total and 16 repetitive projects consisting of 160 activities in total, in order to evaluate the effectiveness of the algorithm in different-size solution spaces and under alternative optimization criteria by examining the quality of the solution and the required computational time. The case studies 2 & 3 have been developed by building upon the recurrence of the unit/sub-project (10 activities), meaning that the initial problem is multiplied four and sixteen times respectively. The evaluation results indicate that the proposed model can efficiently provide reliable solutions with respect to the individual goals assigned in every case study regardless of the project scale.

  • PDF

System Assurance and Safety Assessment Activities of Urban Marglev ATC Project based on IEC Standards (IEC 규격에 기반한 도시형자기부상열차 열차제어시스템의 시스템보증 및 안전성 평가 활동)

  • Baek, Young-Goo;Park, Hee-Jun;Gu, Jung-Suh;Seo, Do-Seok;Lee, Key-Seo
    • Proceedings of the KSR Conference
    • /
    • 2010.06a
    • /
    • pp.1669-1679
    • /
    • 2010
  • Related to the on-going "Train Control System Project of Pilot Line Construction for Urban MAGLEV Train", activities by each phase shall be conducted to achieve SIL4 level and obtain safety certification from the Independent Safety Assessment(ISA), based on the IEC standards((IEC 62278/62279 and IEC 62425) for the first time in Korea. This thesis describes the introduction of IEC standards, system assurance activities (such as plan, analysis, test, verification and validation) in compliance with requirements management and project life-cycle and relations with the safety assessment activities; and certification activities (such as document reviews and audits) through system RAMS activities, software quality assurance activities and safety assessment, for the purpose of achieving a successful safety certification at the time of completing the project as system assurance activities including software and safety certification activities in order to acquire the safety certification for train control system which does not exist at all in domestic cases. It is believed that overall system safety assurance activities in this project will contribute to develop more upgraded products of the domestic train control system on the quality and safety point of view, find overseas markets and establish a bridgehead in the future.

  • PDF

A Case Study on Design Classes using Blended Learning -Focused on Team Project and Smart Device App-based Learning- (혼합학습(Blended Learning)을 적용한 디자인 수업 실증사례 연구 -팀 프로젝트와 스마트디바이스 앱 기반 학습을 중심으로-)

  • Kim, Jin Hee;Kim, Hye Kyun
    • Journal of the Korean Society of Clothing and Textiles
    • /
    • v.45 no.2
    • /
    • pp.271-284
    • /
    • 2021
  • This study presents the educational utility of blended learning by analyzing the effectiveness of learning after class by blending team project learning and smart device app-based learning methods. Qualitative analysis and survey analysis were conducted and the results were as follows. First, team project activities based on task resolution were conducted freely through detailed activities such as sharing roles, planning meetings, and coordinating opinions. Team activities were carried out with respect and consideration, team member bonding, and a sense of responsibility. Second, the smart device app is recognized as a medium for work and communication, and fast feedback has been made, making it highly impactful on classroom activities. Third, in terms of learning satisfaction, most learners showed an interest in the course and were satisfied with the project results. The smart device app was used as a learning and communication medium for personal and team activities and was analyzed as a blended method applicable to classes that conduct practical activities as an efficient tool to further activate project activities.

AI-Based Project Similarity Evaluation Model Using Project Scope Statements

  • Ko, Taewoo;Jeong, H. David;Lee, JeeHee
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.284-291
    • /
    • 2022
  • Historical data from comparable projects can serve as benchmarking data for an ongoing project's planning during the project scoping phase. As project owners typically store substantial amounts of data generated throughout project life cycles in digitized databases, they can capture appropriate data to support various project planning activities by accessing digital databases. One of the most important work tasks in this process is identifying one or more past projects comparable to a new project. The uniqueness and complexity of construction projects along with unorganized data, impede the reliable identification of comparable past projects. A project scope document provides the preliminary overview of a project in terms of the extent of the project and project requirements. However, narratives and free-formatted descriptions of project scopes are a significant and time-consuming barrier if a human needs to review them and determine similar projects. This study proposes an Artificial Intelligence-driven model for analyzing project scope descriptions and evaluating project similarity using natural language processing (NLP) techniques. The proposed algorithm can intelligently a) extract major work activities from unstructured descriptions held in a database and b) quantify similarities by considering the semantic features of texts representing work activities. The proposed model enhances historical comparable project identification by systematically analyzing project scopes.

  • PDF

How do learners discover the topic in team project-based learning?: Analysis of Learners' Creative Activity in the process of selecting the topic

  • Kim, Hyekyung;Kim, Insu
    • Educational Technology International
    • /
    • v.14 no.2
    • /
    • pp.167-187
    • /
    • 2013
  • Team project learning is a type of Project-Based Learning, which is an effective learning method for developing collaborative competency and interpersonal communication skills, as well as for developing cognitive competency such as critical thinking, creative thinking, and analytical skills. This research, conducted to analyze learning activities, focuses on students' creative thinking and activities in TPBL(Team Project-Based Learning). A qualitative approach including a reflective journal based on the 6 stages of TPBL, was adopted for this purpose. In this study, 69 reflective journals on the three stages (developing a theme, researching, theme-making) of 23 undergraduate students were categorized on the basis of three criteria: divergent thinking factors, convergent thinking factors and affective factors. The results show that the participants' journals demonstrated twenty-eight activities from nine cognitive factors and nine activities from three affective factors were derived from reflect journal. This finding indicates that more appropriate instructional strategies are needed for students to enhance their creative thinking skills and activities

The Effects of Scope Management on Process Performance and Output Performance in the Information System Development Project : An Analysis from Project Supplier's Perspective (공급자 관점에서 정보시스템 개발 프로젝트의 범위관리활동이 프로세스성과와 결과물성과에 미치는 영향에 대한 연구)

  • Park, Bong-Gu;Lim, Gyoo-Gun;Yoo, Weon-Sang
    • Journal of Information Technology Services
    • /
    • v.8 no.3
    • /
    • pp.83-100
    • /
    • 2009
  • Even though the success of the information system (IS) protect becomes a critical issue to an enterprise and there has been a lot of research about finding critical success factors of IS projects, the scope management for the success of IS protect has received little attention in the literature. The purpose of this research is to investigate the effects of the project scope management activities defined by PMI (Project Management Institute) on the performance of the information system project. The focus of this paper is on the project supplier's point of view. This study shows the priority of the scope management activities during the IS Project. The results show the different results depending on the types of the project clients and the project scale. This research reveals that the scope verification is important for the project supplier from the project process view, and that the scope planning/definition is important for the protect client from the project result view. It also shows different results comparing to the conventional recognition about project success. The research results show that the positive relationships between the project scale and the importance of scope management activities, and between the familiarity of suppliers and clients and the importance of the scope management activities. Through this research, we expect that the importance of the scope management in a project will be considered as an important issue, and that this research will lead to various detailed research about this issue.

Analyses of Young Children's Activities in Preschools of Different Child-Care Approaches (유아보육프로그램의 유형에 따른 유아의 활동분석)

  • Lee, Soeun;Yang, Sun Hee
    • Korean Journal of Child Studies
    • /
    • v.25 no.3
    • /
    • pp.101-113
    • /
    • 2004
  • The purpose of this study was to compare young children's daily activities in the preschools of two different child-care approaches, i.e., project and traditional approaches. From two preschools. 20 children (M=71.3 months) were observed for 3 consecutive hours. The observers followed the target child, gathering data during 30-second "windows". The window was open every 2 and half minutes. To test the differences between two preschools, phi coefficient tests were used. Results showed that children of traditional approach were more exposed to and engaged in academic activities than those of project approach. In specific, children of traditional approach were more involved in academic and skill/nature lessons. A reverse tendency, however, was found in play activities. Children of project approach were more exposed to and engaged in play activities, especially in play with academic objects. And they were more exposed to conversation with their teacher than their counterparts. Children of project approach also showed more initiatives in their play activities.

  • PDF

Effects of Eco-Friendly School Project Activity on Middle School Students' Environmental Awareness (친환경학교 가꾸기 프로젝트 활동이 중학생의 환경 인식에 미치는 영향)

  • Son, Mi-Hee;Park, Hye-Gyeong;Cheong, Cheol
    • Hwankyungkyoyuk
    • /
    • v.24 no.3
    • /
    • pp.34-43
    • /
    • 2011
  • Project-based learning is an innovative approach to learning that teaches a multitude of strategies critical for success in the twenty-first century. Students drive their own learning through inquiry activity, as well as work collaboratively to research and create projects that reflect their knowledge. The purpose of this study was to investigate the effects of eco-friendly school project activity which is applied from one of project-based learning approach on learning outcomes of students in ninth-grade environment course in middle school. The participants were given a questionnaire before and after the environmental project activities. In solving the school environment issues themselves, students have practiced invaluable problem solving skills. This study indicates that school students' awareness about the environment has positively changed by experiencing the eco-friendly school project. In addition, this project affects students' variety of environmental awareness. This project could be applied to school environmental education programs and to environment lessons, developmental activities or club activities for a positive impact on students' environmental awareness.

  • PDF

Successive Case of Global Shopping Mall Project for Small and Medium Enterprises: Zungle Incorporation (중소기업을 위한 글로벌 쇼핑몰 지원사업의 성공사례: 주식회사 정글)

  • Choi, Seok-Beom
    • Korea Trade Review
    • /
    • v.44 no.1
    • /
    • pp.221-235
    • /
    • 2019
  • SMEs are experiencing difficulties in doing sales promotion due to the low awareness of the image of the company and the products produced by them in the global market. Therefore, the Government should seek ways to raise awareness of SMEs' image and products. SMEs have to carry out global innovation activities needed to develop new products or new technologies, but they are exposed to limitations of these innovative activities due to the limit of their available resources. Therefore, as a national project, the Ministry of SMEs and Startups and the Small and Medium Business Corporation are doing project for fostering and constructing global shopping mall (independent mall) so that SMEs can strengthen their global innovation activities. The purpose of this paper is to contribute to succeeding in the project for fostering and constructing global shopping mall (independent mall) by studying the case of Zungle Incorporation which operates a global shopping mall and greatly increases exports by participating in this project, and identifying success factors of Zungle Incorporation in doing this project.

Challenges and suggestions of resource planning for standardized concurrent construction

  • Chen, Xingbin;Li, Sining;Kim, Jung In;Fang, Yuan
    • International conference on construction engineering and project management
    • /
    • 2020.12a
    • /
    • pp.41-49
    • /
    • 2020
  • Concurrent construction offers considerable improvement for shorten the project duration of its production process. Therefore, standardized concurrent construction is widely applied in building construction projects. However, resources planning for standardized concurrent construction project is manually developed by construction manager. This practice is not effective since it is time-consuming and error-prone for managers to identify all project-specific information, distinguish different activity-resource types, interpret these types and analyze how they affect resource allocated on an ad hoc basis. Therefore, this research investigates the opportunity for leveraging activity modeling to enable automated resource planning for standardized concurrent construction during project development, with identifying the characteristics of construction activities under standardized concurrent planning and determining the activity-resources types that affects resource planning. Both will function as a basis for modeling these construction activities in a computer-interpretable manner and for automation in resource planning.

  • PDF