• Title/Summary/Keyword: progress costs

Search Result 162, Processing Time 0.021 seconds

Effects of Fungicide Control of Downy Mildew (Pseudoperonospora cubensis) on Yield and Disease Management of Ridge Gourd (Luffa acutangula)

  • Deadman, M.L.;Kagadi, S.R.;Pawar, D.R.;Gadre, U.A.
    • The Plant Pathology Journal
    • /
    • v.18 no.3
    • /
    • pp.147-151
    • /
    • 2002
  • Seven fungicides were compared for the control of downy mildew on midge gourd. All treatments had significantly lower rates of disease progress curves and disease severity levels than that of the control. The highest yields were obtained from crops treated with metalaxyl + mancozeb, fosetyl-Al, and chlorothalonil. These treatments also proved to be the most economical considering the treatment costs.

Productivity Analysis for Strutural Formwork Using 3D BIM (3D BIM을 활용한 골조 거푸집 공사의 생산성 분석에 관한 연구)

  • Choi, Chang-Hoon;Park, Young-Jin;Soh, Ji-Yoon;Kim, Sung-Yeon;Lee, Junbok
    • Journal of the Korea Institute of Building Construction
    • /
    • v.14 no.4
    • /
    • pp.292-300
    • /
    • 2014
  • The construction progress control is very important because there are many unexpected factors affecting time schedule delay and cost overruns. A complicated measure including item quantity and inherent time and costs is used to monitor the progress. Another element to be considered is a productivity, which is cost effectiveness because productivity is primarily measured by the costs. Productivity is stated as constant in-place value divided by inputs such as worker-hour. The main purpose of this paper is to analyze the productivity of structural formwork using a 3D BIM. In order to achieve the research objective, an integrated model of a BIM with a daily foreman's report is developed. The quantities being extracted from a 3D model and information are integrated with manpower utilized. The developed model is applied to a case project to measure and analyze the productivity in terms of individual building and work crew team. The results are discussed and further research topics will be addressed.

Development of a Recording System for Home Health Care for Postpartum Women adn Their Newborns (병원 포괄 수가제 도입에 대비한 산욕부 및 신생아 가정간호 기록지 개발)

  • Kim, Hea-Sook
    • Women's Health Nursing
    • /
    • v.2 no.1
    • /
    • pp.25-39
    • /
    • 1996
  • The Korean government has a new system for charging patient care for patients in hospital, on hold for the present(9 / 1995) but to start implementation in certain areas of patient care next year. From the latter half of next year the Ministry of Health and Welfare would like to start demonstration projects for hospitals who want to start using DRGs for frequently seen medical diagnosis and for patients with a course that is predictable and for whom non-insurance costs are minimal : such as the patient who has a delivery, cesarean deliveries, cataract surgery, tonsillectomy or an appendectomy, and apply the DRG system of payment for hospital care for these patients. The purpose of this study was to establish a recording system to give effective home health care to postpartum women and their newborns. Recently the government announced a DRG system to apply to postpartum women for pilot purposes starting next year. This gives impetus to the need to develop home care records that will allow for systematic recording and provide continuity and consistency in care across all health professionals and with in-depth communication between the professions to assure high quality care. There has been a rise in medical costs and a shortage of patient bed space in hospitals, particularly since the introduction of national medical insurance. The study focused on developing client selection criteria, a primary assessment tool, progress notes and nursing diagnoses applicable to postpartum and newborn clients. Selection criteria for home health care, assessment tool content, nurses progress notes and diagnoses were developed through a review of the literature, advice from professionals who are expert in home health care and actual practice in the use of recording tools through workshops. The recommendations based on the research results are as follows : 1) Replication and application of these tools is needed to test the validity of the tools 2) In order to have systematic nursing records standardization of records has to be done after nurses have had experience using them. 3) Reliability and validity of the tools has to be established through applicability to actual care situation.

  • PDF

A Study on Siting of HVAC Offshore Substation for Wind Power Plant using Submarine Cable Cost Model (해저케이블 비용 모델을 이용한 HVAC 해상변전소 적정 위치 선정에 관한 연구)

  • Won, Jong-Nam;Moon, Won-Sik;Huh, Jae-Sun;Kim, Jae-Chul
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.62 no.4
    • /
    • pp.451-456
    • /
    • 2013
  • Development of the technologies for offshore wind power is proceeding actively and the installation capacity is continuously increasing because of its many advantages in comparison with the land wind power. Accordingly, project for Southwestern 2.5GW offshore wind power plant is in progress in Korea. Design of electric power systems for offshore wind power plant is very important due to its high investment and operational costs. Hence, it needs to be designed in order to minimize costs. This way can be employed in determining the installation location of offshore substation for HVAC wind power plant. According to the offshore substation site, MV inter-array cable and HV export cable lengths vary and they change a total cost regarding submarine cable. This paper represents cost models with variables which are MV inter-array cable and HV export cable lengths to locate the offshore substation for HVAC wind power plant. It is classified into submarine cable installation cost, reactive power compensator installation cost, ohmic losses, and unsupplied energy cost. By minimizing a total cost, an appropriate installation site of the offshore substation is determined.

A Process of the Technical Performance Management for A Space Launch Vehicle R&D Project (우주발사체 개발사업을 위한 기술성능관리 프로세스)

  • Yoo, Il Sang;Cho, Dong Hyun;Kim, Keun Taek
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.10 no.2
    • /
    • pp.71-79
    • /
    • 2014
  • To enhance success probability of a system development project, its overall risk level should be minimized through systematically managing schedules, costs, and technical performances. However, Attempts to manage technical performance compared to numerous efforts to control costs and schedules in such projects are deficient. Particularly, a space launch vehicle, a large complex system, development project is much less likely to meet its technical performance objectives due to its technological difficulty, along with schedule delay and cost overrun. The technical performance management (TPM) is a method for tracking and managing technical progress in order to achieve technical performance targets within schedule and budget. In this paper, we investigate applications of the TPM in several space launch vehicle development projects. Then we propose and validate the TPM process to achieve a successful mission in such projects.

A Prediction of Chip Quality using OPTICS (Ordering Points to Identify the Clustering Structure)-based Feature Extraction at the Cell Level (셀 레벨에서의 OPTICS 기반 특질 추출을 이용한 칩 품질 예측)

  • Kim, Ki Hyun;Baek, Jun Geol
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.40 no.3
    • /
    • pp.257-266
    • /
    • 2014
  • The semiconductor manufacturing industry is managed by a number of parameters from the FAB which is the initial step of production to package test which is the final step of production. Various methods for prediction for the quality and yield are required to reduce the production costs caused by a complicated manufacturing process. In order to increase the accuracy of quality prediction, we have to extract the significant features from the large amount of data. In this study, we propose the method for extracting feature from the cell level data of probe test process using OPTICS which is one of the density-based clustering to improve the prediction accuracy of the quality of the assembled chips that will be placed in a package test. Two features extracted by using OPTICS are used as input variables of quality prediction model because of having position information of the cell defect. The package test progress for chips classified to the correct quality grade by performing the improved prediction method is expected to bring the effect of reducing production costs.

A Study on the Establishing of Single Window System for Simplification of Trade Procedures (무역절차 간소화를 위한 Single Window 구축에 대한 연구)

  • Song, Seon-Uk
    • International Commerce and Information Review
    • /
    • v.7 no.4
    • /
    • pp.157-177
    • /
    • 2005
  • In many countries, a Single Window system for simplifications is establishing in order to reduce works submitted double data and compliance costs. A Single Window is defined as a facility that allows parties involved in trade and transport to lodge standardized information and documents with a single entry point to fulfil all import, export, and transit-related regulatory requirements. A Single window can bring improved level of security, faster clearance and reduced compliance costs. UN/CEFACT released "Recommendation and Guidelines on establishing a Single Window to enhance the efficient exchange of information between trade and government". Also, WCO has made progress several projects to assist effective establishing a single window, i.e. CDM, UCR, ICT. Korea has being established a single window system, "e-trade platform" connected with trade, clearance, logistics, marketing and payment system. Some suggestions to establish a effective single window system in Korea are as follows. Firstly, it is necessary to clearly define roles and responsibilities of a lead agency in a single window system and form a organic relationship with PGA. Secondly, a single window system has to be progressed by stages, namely, customs clearance portal system should be established first, and later established e-trade platform. Lastly, the Korean government has to take part in CDM project to gain an advantage over other countries.

  • PDF

A Study on Evaluating the Ability of the Competitive Container Ports in Far-East Asia (극동 아세아 컨테이너 항만의 능력평가에 관한 연구)

  • Lee S.T.;Lee C.Y.
    • Journal of Korean Port Research
    • /
    • v.7 no.1
    • /
    • pp.13-24
    • /
    • 1993
  • The rapid progress of the intermodal freight transportation in recent years has induced fierce competition among the adjacent hub ports for container transport. This brings increased attention to the evaluation of the port competitive ability. But it is not easy to evaluate the port competitive ability because this belongs to ill-defined system which is composed of ambiguous interacting attributes. Paying attention to this point, this paper deals the competitive ability of container port in Far-East Asia by fuzzy integral evaluation which is adequate to interacting ambiguous attribute problem. For this, the proposed fuzzy evaluation algorithm is applied to the real problem, based on the factors such as cargo volumes, costs, services, infrastructure and geographical sites These are extracted from the precedent study of port competitive ability, etc. The results show that the port evaluation factors come in following order ; services, costs, infrastructure, geographical sites and cargo volumes. There are some interactions(interaction coefficient, ${\lambda}=-0.664$ between evaluation attributes. The port competitive ability comes in following order : Singapore, Hongkong, Kobe, Kaoshiung and Busan. According to the sensitivity analysis, the rank between Busan and Kaoshiung changes when ${\lambda}=0.7$. From the analysis of the results, we confirmed that the proposed fuzzy evaluation algorithm is very effective in the complex-fuzzy problem which is composed of hierarchical structure with interacting attributes.

  • PDF

Implementation of Real-time Integrated Platform for Producing Food Packaging Container

  • Kim, Chigon;Park, Jong-Youel;Park, Dea-Woo
    • International Journal of Internet, Broadcasting and Communication
    • /
    • v.13 no.1
    • /
    • pp.194-200
    • /
    • 2021
  • This study proposes a plan to construct an integrated platform that reduces manufacturing costs and efficiently produce by integrating the systems of main producers, production subcontractors, and raw material subcontractors for the production of food packaging containers. The production plan of food packaging containers and raw materials is established in real time between the main producers, production subcontractors, and raw material subcontractors in consideration of the demand characteristics of each product. It establishes basic information that all processes from the production planning stage to the forwarding stage of the product are linked to each other. The progress of each producer of interlinked processes is shared in real-time to improve productivity and quality of food packaging containers and raw materials and reduce manufacturing costs. By monitoring the system of the main producer and the production subcontractor in real time, the production of food packaging containers is performed in a timely manner, thereby improving productivity. The application of the plan-do-check-action (PDCA) process, which includes planning, execution, evaluation and improvement in the production operation processes of the main producer, production subcontractor and raw material subcontractor, enables improved production compliance rate. The contents of the main producers, production subcontractors, and raw material subcontractors are managed in real time, then a converged production management system is established through the platform proposed in this study to ensure timely supply and demand of raw materials without delay in ordering.

A STUDY ON THE LIFE-CYCLE FOR SELECTING A GRATING

  • Yun-Sik Kim;Dong-Wan Kang;Taehoon Hong;Chang-Taek Hyun
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1189-1194
    • /
    • 2009
  • A gutter-shaped U grating is a facility that is installed at the sides of a road to provide pedestrians with a rainwater-free road. The previous studies on this facility focused mainly on the progress of the efforts that are being made to improve its performance and interception efficiency so as to prevent damages in regional areas due to the heavy rains caused by climate change. The studies on its maintenance, however, are still inadequate. Therefore, this study was conducted to analyze and compare the life cycle costs and performance evaluations of the steel and magic gratings, which are installed in apartments. The results of the study show that the replacement period and rate of gratings differ depending on where they are installed. The initial capital investment cost of a magic grating installed at a road where many vehicles pass is quite high, but in terms of its maintenance and entire-life-cycle costs, its total expenses are lower than those of a steel grating. The results of this study are expected to serve as preliminary data for the selection of an adequate grating that is suitable for particular places in the design phase of construction projects.

  • PDF