• 제목/요약/키워드: procurement management

검색결과 484건 처리시간 0.024초

Applying a Life-Cycle Assessment to the Ultra Pure Water Process of Semiconductor Manufacturing

  • Tien, Shiaw-Wen;Chung, Yi-Chan;Tsai, Chih-Hung;Yang, Yung-Kuang;Wu, Min-Chi
    • International Journal of Quality Innovation
    • /
    • 제6권3호
    • /
    • pp.173-189
    • /
    • 2005
  • A life-cycle assessment (LCA) is based on the attention given to the environmental protection and concerning the possible impact while producing, making, and consuming products. It includes all environmental concerns and the potential impact of a product's life cycle from raw material procurement, manufacturing, usage, and disposal (that is, from cradle to grave). This study assesses the environmental impact of the ultra pure water process of semiconductor manufacturing by a life-cycle assessment in order to point out the heavy environmental impact process for industry when attempting a balanced point between production and environmental protection. The main purpose of this research is studying the development and application of this technology by setting the ultra pure water of semiconductor manufacturing as a target. We evaluate the environmental impact of the Precoat filter process and the Cation/Anion (C/A) filter process of an ultra pure water manufacturing process. The difference is filter material used produces different water quality and waste material, and has a significant, different environmental influence. Finally, we calculate the cost by engineering economics so as to analyze deeply the minimized environmental impact and suitable process that can be accepted by industry. The structure of this study is mainly combined with a life-cycle assessment by implementing analysis software, using SimaPro as a tool. We clearly understand the environmental impact of ultra pure water of semiconductor used and provide a promotion alternative to the heavy environmental impact items by calculating the environmental impact during a life cycle. At the same time, we specify the cost of reducing the environmental impact by a life-cycle cost analysis.

계층적 분석 과정을 이용한 학교급식 운영 품질 평가 분야의 중요도 분석 (Analytic Hierarchy Process Approach to Estimate Weights of Evaluation Categories for School Food Service Program in Korea)

  • 이민아;양일선;이보숙;김현아;박소현
    • Journal of Nutrition and Health
    • /
    • 제39권1호
    • /
    • pp.74-83
    • /
    • 2006
  • The purposes of this study were to (1) identify the evaluation categories, areas, attributes, and criteria of the school food service program using both a qualitative and a quantitative analyses, (2) define the relative importance of the evaluation categories, areas, attributes, and criteria of the school food service program using analytic hierarchy process, (3) organize the evaluation system to improve quality of the school food service in Korea. A survey was conducted from August to October 2004 to collect data from 172 dietitians, 15 school food service officials at the educational board, 10 professionals of school food service. Statistical analyses were performed on the data utilizing the SPSS 12.0 for Windows and Excel, such as Descriptive statistics and analytic hierarchy process was performed. The result of the analytic hierarchy process indicated that relative importance of evaluation category was 0.4319 (food service manage ment), 0.2369 (nutrition education), 0.1455 (satisfaction) and 0.0912 (parent involvement program). 'Sanitation, safety and facility (0.1739)' was the most important area among the subcategories of food service management, followed by nutrition management (0.1581), procurement (0.1375), production (0.1345), organization and personnel management (0.0662), planning (0.0644), food service evaluation (0.0585), financial accountability (0.0555), and information management (0.0554). There existed a relative importance on the three areas of the nutrition program and satisfaction evaluation category: students (0.5281, 0.6221), parents (0.1812, 0.1491), and teachers (0.1838, 0.1618). In the parent involvement program evaluation category, relative importance of committee and monitoring management was 0.4658 and information communication was 0.3724. The quality of food and service to school children can be improved by the appropriate application of the developed evaluation tool for the school food service program.

해외 LNG Plant 프로젝트 초기 프로세스 분석 및 지식관리시스템 프로토타입 구축 (Analysis of Pre-construction Processes and Development of KMS Prototype of LNG Plant Projects)

  • 원서경;이준복;한충희
    • 한국건축시공학회지
    • /
    • 제9권6호
    • /
    • pp.151-159
    • /
    • 2009
  • 최근 LNG 수요 증가로 인한 해외 LNG 플랜트 프로젝트의 지속적인 발주 증가로 국내 건설업체의 해외 진출이 크게 증가하고 있다. 또한 시공 및 사업관리 기술의 발전으로 예전에 비해 고부가가치를 창출할 수 있는 기회가 많아지고 있다. 그러나 일부 선도기업을 제외한 대부분의 중견 건설업체는 고급 인력과 실무 경험의 부족으로 인한 어려움을 겪고 있는 실정이다. 선진기업의 경우 체계화된 업무 프로세스 구축을 통해 이러한 어려움을 해결하였다. 이에 본 연구에서는 플랜트 사업의 생애주기 업무 프로세스 중 시공 전 단계를 대상으로 업무를 규명하고 지식관리 항목을 포함한 상세 프로세스를 분석하였다. 이는 전체 생애주기 업무 프로세스를 분석하고 표준화하는 연구의 사전 단계로 향후 지식관리 시스템을 개발하여 통합관리를 하는데 활용 할 수 있을 것으로 기대한다.

Improvement of ITSM IT Service Efficiency in Military Electronic Service

  • Woo, Hanchul;Jeong, Suk-Jae;Huh, Jun-Ho
    • Journal of Information Processing Systems
    • /
    • 제16권2호
    • /
    • pp.246-260
    • /
    • 2020
  • IT Service Management (ITSM) achieves consolidated management for the IT services supporting the acquisition system, and no outside connections can be established with such ITSM. Issues pertaining to the D2B can be addressed to System Q&A or a Call Center for problem-solving. In other words, internal staff can take the necessary measures for problems by directly connecting with ITSM. Currently, diverse innovative technologies are being used in electronics and ubiquitous computing environments. This allows us to create a better world by providing the backbone for remarkable development in our human society in the fields of electronics, devices, computer science, and engineering. Following the expansion of IT services in the military acquisition sector such as Defense Electronic Procurement, military export/import support system, etc., customers' dependence on IT for conducting business with the military or related companies is increasing, including the military's dependence on the same technology for services to the public. Nonetheless, issues pertaining to the simplified/integrated management of complex IT service management systems, including slow system recovery, lack of integrated customer service window, and insufficient information sharing, have become the priority problems that IT managers are required to solve. Therefore, this study conducted research on the integrated management of IT services provided by Korea's national defense acquisition system, which was developed based on the existing system IT Infrastructure Library (ITIL) v2, and investigated the level of satisfaction with services with focus on ensuring that it can be used for understanding the necessity of the system and its advancement in the future.

납기 회답 지원 SCM을 위한 생산 계획 모델의 설계(조립/가공 산업 중심) (Design of Advanced Planning System for Supply Chain Management Supporting ATP(Available To Promise))

  • 배준수;한종길
    • 한국경영과학회:학술대회논문집
    • /
    • 대한산업공학회/한국경영과학회 2002년도 춘계공동학술대회
    • /
    • pp.371-377
    • /
    • 2002
  • 근래 정보 시스템의 흐름은 생산 분야의 관리뿐만 아니라, 고객과의 관계를 중시하는 CRM(Costumer Relation Management)과 공급업체와의 협업 관계를 유지하는 eProcurement시스템에 초점을 맞추고 있다. 즉, 기존에는 단위 생산 시스템의 관리에 중점을 두었지만 최근에는 그 외부 요소들에 대한 관리의 중요성을 인식하게 되었고 이를 통징하여 공급망 관리(SCM Supply Chain Management)라고 한다. 본 논문에서는 공급망 관리에서 필요한 생산 계획수립 문제에 대해서 살펴본다. 특히 고객과의 관계에서 중요한 기능인 납기 회답을 지원하는 생산 계획 수립의 실행 주기에 대해서 살펴본다. 첫째, 단위 생산 시스템에서 사용하는 작업지시(Work Order)와 구매 지시(Purchase Order)를 생성하는 정규계획 모델에 대해서 설명한다. 정규계획 모델에서 필요로 하는 정적 정보와 동적 정보의 수집 및 계획의 실행을 담당하는 ERP 시스템과의 관계에 대해서 정의하고 정규계획 모델의 운영 주기를 정의한다. 둘째, 정규계획 모델과 상호 협조하면서 납기 회답을 지원하는 납기회답 모델의 설계에 대해서 살펴본다. 정규계획 모델과 달라지는 입력 부분의 정의와 정규계획 모델과의 상호 관계를 정의한다. 다음으로, 정해진 납기를 지키기 위해서 정규계획 모델에서 고려래야 하는 요소에 대해서 알아본다. 가장 중요한 것으로 작업 부하와 생산 용량을 고려한 계획 일자(PST)와 고객 납기와 제조 공정 LT를 고려한 계획 일자(LPST)중 최소값을 원자재의 납기 일자로 사용하는 것을 제안한다. 동시에 신규 구매 지시 계획을 생성하기보다는 기존에 발생된 구매 지시의 우선적 사용과 기존 구매 지시의 납기 일자를 고객 납기에 가장 잘 맞출 수 있도록 변경하는 방안을 제시한다. 이렇게 함으로써 최대한 고객 납기를 만족하도록 계획을 수립할 수 있게 된다. 본 논문에서 제시하는 계획 모델을 사용함으로써 고객 주문에 대한 대응력을 높일 수 있고, 계획의 투명성으로 인한 전체 공급망의Bullwhip effect를 감소시킬 수 있는 장점이 있다. 동시에 이것은 향후 e-Business 시스템 구축을 위한 기본 인프라 역할을 수행할 수 있게 된다.

  • PDF

건설산업 제도개선을 위한 분할·분리 발주 제도의 선진화 방안 연구 (A Comparative Study on Korean Compulsory Multiple Prime Contract System)

  • 김상범;조지훈
    • 한국건설관리학회논문집
    • /
    • 제14권2호
    • /
    • pp.184-193
    • /
    • 2013
  • 국내 건설산업은 경직된 산업 구조와 건설 생산 활동에 대한 비효율적인 제도적 규제 등으로 인해 성장세가 저하되고 경쟁력이 뒤떨어지는 등의 문제점이 지적되고 있다. 현행 분할 분리발주 제도의 경우 국가 계약법에서는 분할발주는 원칙적으로 금지하고 있으나, 그 예외 조항으로 두고 있어 전기, 정보통신, 기계설비, 건축폐기물 공종의 경우 분할발주가 의무화 가능하고, 소방시설공사의 경우 의무화 추진을 위한 노력으로 소방시설공사업법 일부개정법률안을 발의하는 등 지속적으로 의무화 추진중이다. 기계설비공사업은 분할발주 관련 법률은 없으나 국가계약법 제68조 제3호를 근거하여 일부 시 도 교육청에서는 기계설비공사의 분리발주 확대 추진하고 있는 실정이며, 공종별 별도 법안을 추진하고 있는 공종도 있는 것으로 파악되고 있다. 이에 본 연구에서는 분리분할 발주에 대한 제도 분석 및 분리발주에 대한 전문가의견 청취 및 유관기관별 의견을 정리하여 건설산업 제도 선진화 방안을 제시하고자 한다. 이에 본 연구에서는 발주자의 효율적인 발주방식의 선택권 확보차원에서 발주자의 역량 및 프로젝트의 특성 등에 따라 분할 발주 여부를 유연하게 결정할 수 있도록 분리분할발주 제도의 개선안을 제시하여 건설사업차원에서의 효율적이고 생산적인 건설생산이 가능한 유연한 건설사업 수행 체계를 형성할 수 있는 기반을, 그리고 건설 산업차원에서는 국내 건설산업의 균형 발전과 함께 국제 경쟁력 향상을 고려한 구조를 제공할 수 있는 방안을 제시하고자 한다.

방위력개선사업비 편성.확보의 합리성과 안정성 제고방안 -국방중기계획 연부액의 편성 및 확보방안을 중심으로- (A Study on Improvement of Rationality and Stability of Allocation and Procurement of Defense Capability Improvement Cost -Focused on the Yearly Allocation and Procurement of Mid-Term Defense Plan-)

  • 최준혁;이필중
    • 한국국방경영분석학회지
    • /
    • 제34권1호
    • /
    • pp.117-135
    • /
    • 2008
  • 현재 세계 각국은 탈냉전 이후 격변하는 안보환경 속에서 생존을 위한 다양한 도전에 직면해 있다. 이에 한국군도 '국방개혁 2020'을 통한 첨단 정보과학군으로의 변모를 죄하고 있으며, 이는 필연적으로 새로운 군사력 소요를 창출하게 되었다. 그리고 이와 같은 군사력 건설의 성공적인 추진을 위해 방위산업 및 국방예산의 중요성은 더욱 증대되었다. 하지만 현재 한국의 방위산업은 심각한 어려움을 겪고 있으며, 더욱이 방위력개선사업비의 낮은 합리성 안정성은 이러한 실태를 더욱 악화시켜 왔다. 이와 같은 상황에서 한국 방위산업의 발전과 한국군 군사력 소요의 적기 충족을 위해서는 방위력개선사업비의 합리성 안정성 제고방안 강구가 시급하다. 따라서 본 연구의 목적은 한국 방위력개선사업 비의 합리성 안정성 제고를 위한, 방위력개선사업분야 국방중기계획의 연부액 편성체계 개선 및 국가재정운용계획과 국방중기계획의 연계 강화방안을 제시하는 데 있다. 한국 국방목표의 성공적 달성을 위해 국방중기계획의 연부액 편성체계 개선을 통해 방위력개선사업비의 합리성을 제고하고 안정성 제고를 위해 이를 국가재정운용계획과 연계시켜 최근 국가재정법 발효 등으로 변화가 불가피한 한국의 국방예산 편성체계에서 방위력개선사업비의 시기적절한 변화를 도모하고자 한다.

해외건설공사 EPC/Turnkey 계약조건 핵심 리스크 세부조항 도출 - FIDIC Silver Book 2017년 개정판 기준으로 - (Deriving Key Risk Sub-Clauses for EPC/Turnkey Contract Conditions for Overseas Construction Projects - Based on FIDIC Conditions of Contract for EPC/Turnkey Projects, second edition 2017 -)

  • 홍성열;제재용;서성철;박형근
    • 한국건설관리학회논문집
    • /
    • 제23권6호
    • /
    • pp.101-110
    • /
    • 2022
  • 최근 세계 건설시장은 2025년까지 연 평균 4.8%씩 성장할 것으로 예상하고 있으며, 이에 따른 해외건설 리스크도 증가할 것으로 전망하고 있다. 특히, 국내 건설업체들은 EPC(Engineering, Procurement, Construction)/Turnkey 사업에 집중적으로 참여하였지만, 계약적 리스크에 대응하지 못한 결과, 2013년부터 수조원대의 해외사업 손실을 입은 경험이 있다. 그럼에도 불구하고, 지금까지 EPC/Turnkey의 계약적 핵심 리스크 세부조항 도출에 대한 연구는 많지 않았다. 따라서 본 연구에서는 국제컨설팅엔지니어링연맹(FIDIC)에서 발행한 2017년 Silver Book 계약조건을 대상으로 핵심 리스크 세부조항을 연구하였다. 이를 위해서 국제건설계약 경험이 10년 이상인 30인의 전문가를 패널로 구성하여 FIDIC Silver Book 21개 조항 170개 세부조항을 델파이 설문조사를 실시하여 62개의 주요 리스크 세부조항을 도출하였다. 또한, 최종적으로 FMEA(Failure Mode and Effect Analysis)기법을 활용하여 RPN(Risk Priority Number)을 산정하였으며, Critical Risk 범위에 속하는 25개의 핵심 리스크 세부조항을 도출하였다. 본 연구 결과를 통하여 실무관점에서는 해외건설사업에서 입찰 및 계약체결 단계에서 주의 깊게 검토해야 할 계약조항들에 대해 참조할 수 있게 해주고, 학문관점에서는 해외건설 EPC/Turnkey 사업에서 사용되는 계약분야에 대해 어떤 방식으로 연구해야 할지의 방향성과 기초적 지식을 제공하고 있다.

인천지역 무역업체의 중국과의 무역리스크 관리에 관한 연구 (A Study on the Trade Risk Management of Korean Companies in Incheon Area Trading with China)

  • 심상렬;배상필;왕천교
    • 통상정보연구
    • /
    • 제14권3호
    • /
    • pp.513-536
    • /
    • 2012
  • 본 논문은 역사적, 지리적으로 중국과의 교역이 활발한 인천지역 소재 한국 무역업체를 대상으로 기업 일반 현황, 중국과의 무역업무처리 현황, 중국과의 무역클레임 및 무역리스크 관리 현황 등 3가지 범주로 구성된 설문지를 작성, 배포하였다. 그리고 총 84개 유효 설문지를 바탕으로 실태분석하였다. 인천지역 무역업체들은 중국과의 무역거래에서 무역, 금융, 노동 및 투자 등과 관련한 중국정부의 정책 변화, 중국의 물류시스템 등에 대해 많은 우려를 하고 있는 것으로 나타났다. 이러한 중국정부 및 중국의 경제구조와 관련한 리스크는 개별 무역업체 차원에서 대처하기가 어렵다는 점에서 정부와의 긴밀한 대응방안 모색이 요구된다. 또한 중국과의 무역거래 각 단계별로 리스크 발생 가능성이 높은 반면 그 관리는 미흡한 것으로 나타났다. 이러한 실태분석을 바탕으로 인천지역 무역업체들의 대중국 무역리스크 관리 수준을 향상시키기 위한 개선방안을 제시하였다.

  • PDF

BIM기반 사회기반 시설물 유지관리 도입을 위한 경제적 타당성 분석 (A Feasibility Study to Adopt BIM-based Infrastructure Management System)

  • 김정환;지승구;정태형;서종원
    • 대한토목학회논문집
    • /
    • 제34권1호
    • /
    • pp.285-292
    • /
    • 2014
  • BIM은 건설 전단계를 포괄하는 새로운 패러다임으로서 2016년 조달청이 발주하는 정부기관 건축공사에서 BIM 설계를 전면 의무화 하는 등 BIM 기술의 도입이 점차 가속화 되고 있다. BIM 기술은 건축분야에서 벗어나 점차 사회기반시설물로 적용 범위가 확대되고 있으며 이미 국내 토목건설 공사 파일럿 프로젝트를 통해 적용 타당성이 검증되고 있다. 이러한 추세는 건설 생애주기에서 가장 넓은 범위를 차지하는 유지관리 단계로까지 확장되고 있으며 선진국에서는 경제성 검토와 BIM기반 유지관리 가이드라인도 출간되고 있는 실정이다. 이에 본 연구에서는 사회기반 시설물의 BIM기반 유지관리 기술 도입의 경제적 타당성 분석을 수행하였다. 교량과 터널을 적용 가능한 사회기반 시설물의 범위로 판단하였고 편익/비용비(B/C ratio)를 활용하여 BIM 기술의 유지관리 도입의 경제적 타당성을 분석 하였다. BIM 모델의 세밀도별로 시나리오를 가정하여 분석한 결과 편익/비용비는 교량의 경우 중간 이상의 세밀도에서, 터널은 높은 세밀도에서 1.00 이상의 값이 산출되어 시스템 도입의 경제성이 있음을 확인할 수 있었다.