• Title/Summary/Keyword: procurement management

Search Result 484, Processing Time 0.024 seconds

A Study on the Real-time Data Interface Technology based on SCM for Shipbuilding and Marine Equipment Production (조선해양기자재 제작을 위한 SCM 기반 실시간 데이터 인터페이스 기술에 관한 연구)

  • Myeong-Ki Han;Young-Hun Kim;Jun-Su Park;Won-Ho Lee
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.27 no.1
    • /
    • pp.143-149
    • /
    • 2024
  • The production and procurement of shipbuilding and offshore equipment is an important competitive factor in the shipbuilding and offshore industry. Recently, ICT-based digital technology has been rapidly applied to the manufacturing industry following the Fourth Industrial Revolution. Under the digital transformation, real-time data interface technology based on SCM (Supply Chain Management) is emerging as an important tool to improve the efficiency of the equipment manufacturing process. In this study, the characteristics and advantages and disadvantages of interface technologies of web-based data interface technologies were compared and analyzed. The performance was compared between theoretical evaluation based on technical features and practical application cases. As a result, it was confirmed that GraphQL is useful for selective data processing, but there is a problem with optimization, and REST API has a problem with receiving data due to a fixed data structure. Therefore, this study aims to suggest ways to utilize and optimize these data interface technologies.

Sentinel Node Biopsy Examination for Breast Cancer in a Routine Laboratory Practice: Results of a Pilot Study

  • Khoo, Joon-Joon;Ng, Chen-Siew;Sabaratnam, Subathra;Arulanantham, Sarojah
    • Asian Pacific Journal of Cancer Prevention
    • /
    • v.17 no.3
    • /
    • pp.1149-1155
    • /
    • 2016
  • Background: Examination of sentinel lymph node (SLN) biopsies provides accurate nodal staging for breast cancer and plays a key role in patient management. Procurement of SLNs and the methods used to process specimens are equally important. Increasing the level of detail in histopathological examination of SLNs increases detection of metastatic tumours but will also increase the burden of busy laboratories and thus may not be carried out routinely. Recommendation of a reasonable standard in SLN examination is required to ensure high sensitivity of results while maintaining a manageable practice workload. Materials and Methods: Twenty-four patients with clinically node-negative breast cancer were recruited. Combined radiotracer and blue dye methods were used for identification of SLNs. The nodes were thinly sliced and embedded. Serial sectioning and immunohistochemical (IHC) staining against AE1/AE3 were performed if initial H&E sections of the blocks were negative. Results: SLNs were successfully identified in all patients. Ten cases had nodal metastases with 7 detected in SLNs and 3 detected only in axillary nodes (false negative rate, FNR=30%). Some 5 out of 7 metastatic lesions in the SLNs (71.4%) were detected in initial sections of the thinly sliced tissue. Serial sectioning detected the remaining two cases with either micrometastases or isolated tumour cells (ITC). Conclusions: Thin slicing of tissue to 3-5mm thickness and serial sectioning improved the detection of micro and macro-metastases but the additional burden of serial sectioning gave low yield of micrometastases or ITC and may not be cost effective. IHC validation did not further increase sensitivity of detection. Therefore its use should only be limited to confirmation of suspicious lesions. False negative cases where SLNs were not involved could be due to skipped metastases to non-sentinel nodes or poor technique during procurement, resulting in missed detection of actual SLNs.

U.S. Architectural Engineering Service Procurement System for Public Construction Project and Its Implication (미국 공공건설사업에서의 건설기술용역 조달시스템 고찰 및 시사점)

  • Chang, Chul-Ki
    • The Journal of the Korea Contents Association
    • /
    • v.20 no.2
    • /
    • pp.215-225
    • /
    • 2020
  • In selecting a company of A-E service provider for a public construction project, public owners make widely use the evaluation method based on the quantitative criteria to emphasize transparency and fairness instead of putting more weighting on bidders' technical capability. The selection method and process to select technically better company has been in discussion to motivate company to build up their technical capability and better quality of service. This paper examined US laws and regulations related to evaluating and selecting an A-E company for public construction project in terms of principles, process, selection committee, evaluation methods, and contract management and so on. Then deduced several implications for domestic public owner to select the most adequate company for a certain architectural service through fair and efficient way. The major findings are technical capability based selection, emphasizing owner's role and responsibility, consideration of small and mid-sized company, debriefing, and post-service evaluation.

A Fundamental Study on the Causes of Defects in Landscape Construction Projects Based on the Ratio of In-House and Supplied Materials -Focused on Incheon Metropolitan City- (조경공사업에서 관급자재·사급자재 비율에 따른 하자 원인에 대한 기초연구 -인천광역시 사례를 중심으로-)

  • Sang-Won Hwang;Sung-Jin Yeom;Chung-In Park
    • Journal of Environmental Science International
    • /
    • v.32 no.11
    • /
    • pp.821-831
    • /
    • 2023
  • Recently, landscaping construction has played a significant role in enhancing the quality of life for citizens by creating and maintaining outdoor spaces. However, landscaping projects vary in material procurement depending on the contracting method, and they also present various challenges in defect occurrence and defect rectification due to their specialized nature. In this study, we classified different types of projects based on material procurement ratios and conducted on-site assessments of defect status by specific processes. We also analyzed the itemization of material ratios and defect rectification costs. The results revealed it was found that projects with a higher proportion of government-provided materials had the poorest defect status in terms of planting works and also incurred the highest defect rectification costs. Moreover, conflicts concerning the responsibility for defects arose. Currently, there are no specific guidelines for setting standards for the proportion of government-provided materials in landscaping construction contracts. Furthermore, there is ambiguity in the management of defect rectification. Therefore, it is necessary to establish a systematic landscaping construction contracting framework by providing institutional guidelines tailored to local governments or the circumstances of contracting entities and to conduct thorough reviews of construction processes.

Realization of Package Software Inspection Service for Software Asset Management (소프트웨어 자산관리를 위한 패키지소프트웨어 점검서비스 구현)

  • Cha, Tea-Won;Ahn, Jae-Kyoung
    • The KIPS Transactions:PartD
    • /
    • v.16D no.1
    • /
    • pp.123-132
    • /
    • 2009
  • Even support-and-management efforts by government are enforced with the growing international restrictions for complying with global standard, not a few private enterprises are still suffering software management problems from lack of understanding the software asset management and carelessness of the software management. This is due to the ambiguous scope of software asset management as well as characteristics of software property such as invisibility, easiness of copy and installation. In other words, it is not easy for software managers to comply all the information throughout the software life cycle; from purchasing, procurement. distribution, preservation to disposition. Therefore, Inspector which has been developed for resolving these problems are proposed in this study. The inspection service consists of search algorithms adapted for software characteristics, standardization of software right management information, and practical use of registry information. Inspection time for a PC by using inspector make the inspection time much shorter. It is also shown that effective software management enables the enterprise to curtail software acquisition cost and to help rationalizing its business management.

Foodservice Management and Food Sanitation Management in the Welfare Institutions for the Disabled in Korea (장애인 생활시설 급식관리 및 위생관리 실태조사)

  • Lee, Hye-Sang
    • Korean Journal of Community Nutrition
    • /
    • v.13 no.4
    • /
    • pp.520-530
    • /
    • 2008
  • The purpose of this study was to investigate the characteristics of the foodservice management practices, the equipment ratio of sanitary facility/equipment, and dietitians' perceptions of (i) the barriers to sanitary management and (ii) the sanitary management performance level in the welfare institutions for the disabled in Korea. The survey was conducted during the period from September 7 to October 15, 2006. A total of 91 institutions(response rate 74.6%) were analyzed by using SPSS(windows ver. 14.0). The average number of meals served per day per an institution was 379. The majority(93.4%) of dietitians made decisions in procurement. The major part of the purchase was made through private contract. The factors affecting menu planning were nutrition, food preference, and cost, in the order of importance. Among the food items, fruits were infrequently served, while protein source foods and green leaf vegetables were almost daily served. The equipment ratio of sanitary facilities/equipment was 45%, which was relatively low. Most dietitians perceived 'limited availability of facilities and equipment' and 'the lack of support from financing department' as the major barriers in implementing a desirable sanitary system. Sanitary management performance in 'the food ingredient' was perceived as the lowest, while that in 'the uniform' showed the highest. The results of this study suggest that a proper supporting program on securing the facility/equipment and adequately trained employees are needed for successful sanitary management. Also, a more frequent supply of fruits for the disabled is recommended.

An Analysis of the Duration of the Construction Document Phase of Large Public Building Projects Delivered by the Total Solution Service from 2009 to 2014 (공공기관 발주 대형건축공사 실시설계 기간에 대한 분석 및 개선방안 -2009년부터 2014년까지 공공발주 맞춤형 서비스 프로젝트를 중심으로 -)

  • Jung, Wooyoung;Lee, Taewon;Rhee, Pung-wook;Lee, Ghang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.4
    • /
    • pp.89-97
    • /
    • 2015
  • This paper analyzes the duration of the construction document (CD) phase of 42 large public building projects delivered by the total solution service of Public Procurement Services in Korea from 2009 to 2014. The quality of construction documents significantly affects the quality of construction and facility management. Thus, securing appropriate time for the CD phase during project planning is important for the quality of a project. Currently, the duration of the CD phase is planned based on the construction costs of a project following a notice of the Ministry of Land, Infrastructure and Transport. However, our analysis results showed that the correlation between the actual duration of the CD phase and construction costs is very weak. The actual CD phase takes 1.33-1.79 times longer than the planned duration. The practitioners who were interviewed, were already aware that the correlation between the duration of the CD phase and the construction costs is weak. They identified the complexity of the project, the extent of the design changes, project type, client characteristics, and others as more influential factors on the CD phase than the construction costs. To improve the quality of CDs, a new guideline for determining an adequate CD phase duration should be studied and developed.

A Study on the Development plan of Configuration Control for Military Product (군수품 형상통제업무 발전방안에 관한 연구)

  • Jung, Hyun-Woo;Shim, Bo-Hyun
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.21 no.6
    • /
    • pp.70-77
    • /
    • 2020
  • Configuration management is an important project management method. Configuration management is increasing daily and improving defense power as a management tool for technical data of power support systems. Configuration management work must be carried out properly from the beginning of development to acquire an excellent weapon system. In procurement, configuration management is a vital factor that can determine the cost of maintaining operations during the transfer of military supplies and carry out systematic management among operational support. Countries are making changes to policies and systems to manage R&D, standards, and patents in conjunction with each other from the beginning of research and execution, and it is important to establish the concept of managing and controlling the configuration as an efficient means of managing military resources. To identify the activity details during the entire life cycle from the beginning of acquisition to the end of disposal by linking munitions configuration control with the total life cycle, and redefine the appropriate work system, this study investigated and analyzed the U.S. configuration control procedures to identify the activity details and present areas to develop.

A Study on the Current Status of Application of Construction Management in Pusan National University Yangsan Hospital and Guidelines for CM Improvement (양산 부산대학교병원의 건설사업관리 적용현황과 발전 방향)

  • Park, Jong-Soon;Shin, Chang-Joon;Yoo, Byeong-Gi;Chun, Jae-Youl
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.5-12
    • /
    • 2008
  • The construction of Pusan National University Yangsan Hospital is a new construction of a medical town in Yangsan. It is a case that CMr participated in the project from planning to post-completion. It shows an actual proof of Construction Management business applied CM by each phase. In this case, CMr selected the design-build contractor in the planning phase and technically performed CM businesses in every single phase such as design and construction schedule management regarding application of Fast Track technique, procurement management and contract administration in phases based on the Fast-tract; technique, design review, VE in the design phase, change order management in the construction phase and operating and maintenance in the post-construction phase. This study would go far toward applying CM to Mega Turnkey projects by analyzing the problems of CMr's practical application to the project and providing guidelines for effective and efficient CM business implementation especially in the Turnkey projects.

  • PDF

Consumer Impairment and Its Improvement on Longterm Care Insurance Service : Focused on the Current Conditions and the Analysis of Counseling Cases in Korea and Japan (노인장기요양보험 서비스에 관한 소비자피해와 개선방안 : 한일 서비스이용현황 및 상담사례 분석을 중심으로)

  • Lee, Hyun-Jin
    • Journal of Families and Better Life
    • /
    • v.28 no.1
    • /
    • pp.51-67
    • /
    • 2010
  • This study looked into the current conditions in Korean and Japanese care management for the elderly, cases of consumer counseling in these countries, and the supporting institutions for Japanese users regarding the use of care management for the elderly. The number of recipients of care management for the elderly in both Korea and Japan is growing every year, and more Japanese users receive various services compared to Korean users. The results of an analysis on consumer counseling regarding the use of Korean and Japanese care management revealed, two types of complaints: counseling for the improvement of the institution and complaints related to the procurement of service. Regarding the insurance system, the complaints were mostly related to affirmation of a rating and the burden incurred by cost-sharing. Regarding the use of service, such key impairment cases were related to in-service medical accidents, illegal acts including caregiver contract violations and forced retirement, careless service by workers, and human rights violations of the elderly. Japan has developed governmental and, related-administrative and business services as well as a local governmental system to redress customer impairment issues as this pertains to service for better quality care management. In addition, they have enlarged the locally closed service, provided exact information about the services offered, and improved service appraisal techniques. The Japanese cases will serve as a good reference to improve the Korean system. In particular, the construction of a system that reduces customer losses and the availability of more counseling information are urgently required to improve the system in terms of customer experiences when they seek care management.